Laserfiche WebLink
I <br /> 1 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting Agency <br /> I <br /> 2 before the time set for receipt of Bid Proposals. <br /> 3 <br /> 4 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received before the ' <br /> 5 time set for receipt of Bid Proposals, the Contracting Agency will return the unopened Proposal <br /> 6 package to the Bidder. The Bidder must then submit the revised or supplemented package in its <br /> 7 entirety. If the Bidder does not submit a revised or supplemented package, then its bid shall be <br /> I <br /> 8 considered withdrawn. <br /> 9 <br /> 10 Late revised or supplemented Bid Proposals or late withdrawal requests will be date recorded by <br /> 11 the Contracting Agency and returned unopened. Mailed,emailed,or faxed requests to withdraw, I <br /> 12 revise, or supplement a Bid Proposal are not acceptable. <br /> 13 <br /> 14 1-02.12 PUBLIC OPENING OF PROPOSALS I <br /> 15 Section 1-02.12 is supplemented with the following: <br /> 16 (******) I <br /> 17 <br /> 18 The bid opening date for this project is **August 27, 2019 **. Bids received will be publicly opened <br /> 19 and read after 2:00pm on this date. I <br /> 20 <br /> 21 Bids will be opened at: <br /> 22 <br /> 23 City of Everett <br /> 24 Wall Street Building <br /> 25 8th Floor Hearing Room <br /> 26 2930 Wetmore Ave, <br /> 27 Everett, WA 98201 <br /> 28 <br /> 29 <br /> 30 1-02.13 Irregular Proposals <br /> 31 (June 20, 2017 APWA GSP) I 32 <br /> 33 Delete this section and replace it with the following: <br /> 34 I 35 1. A Proposal will be considered irregular and will be rejected if: <br /> 36 a. The Bidder is not prequalified when so required; <br /> 37 b. The authorized Proposal form furnished by the Contracting Agency is not used or is <br /> 38 altered; <br /> 39 c. The completed Proposal form contains any unauthorized additions, deletions, <br /> 40 alternate Bids, or conditions; <br /> 41 d. The Bidder adds provisions reserving the right to reject or accept the award, or enter <br /> 42 into the Contract; <br /> 43 e. A price per unit cannot be determined from the Bid Proposal; <br /> 44 f. The Proposal form is not properly executed; 1 <br /> 45 g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as <br /> 46 required in Section 1-02.6; <br /> 47 h. The Bidder fails to submit or properly complete an Underutilized Disadvantaged111 <br /> 48 Business Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8(12/2019 <br /> STATE FUND#HLP PB17(014);COE WO#PW3688 Page SP-8 <br /> I <br />