My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Tolerances shall not extend the Work beyond the Right of Way or other legal boundaries <br /> 2 identified in the Contract documents. If application of tolerances causes the extension of <br /> 3 the Work beyond the Right of Way or legal boundaries, the tolerance shall be reduced for <br /> 4 that specific instance. <br /> I 5 <br /> 6 Tolerances shall not violate other Contract requirements. If application of tolerances <br /> 7 causes the Work to violate other Contract requirements, the tolerance shall be reduced <br /> I 8 for that specific instance. If application of tolerances causes conflicts with other <br /> 9 components or aspects of the Work, the tolerance shall be reduced for that specific <br /> 10 instance. <br /> Iii <br /> 12 1-05.9 Equipment <br /> 13 The following new paragraph is inserted before the first paragraph: <br /> 14 <br /> 11 15 Prior to mobilizing equipment on site, the Contractor shall thoroughly remove all loose dirt <br /> 16 and vegetative debris from drive mechanisms, wheels, tires, tracks, buckets and <br /> 17 undercarriage. The Engineer will reject equipment from the site until it returns clean. <br /> I 18 <br /> 19 This section is supplemented with the following: <br /> 20 <br /> I 21 Upon completion of the Work. the Contractor shall completely remove all loose dirt and <br /> 22 vegetative debris from equipment before removing it from the job site. <br /> 23 <br /> 24 1-06.AP1 <br /> I <br /> 25 Section 1-06, Control of Material <br /> 26 January 7, 2019 <br /> I 27 1-06.1(3) Aggregate Source Approval (ASA) Database <br /> 28 This section is supplemented with the following: <br /> 29 <br /> I 30 Regardless of status of the source, whether listed or not listed in the ASA database the <br /> 31 source owner may be asked to provide testing results for toxicity in accordance with <br /> 32 Section 9-03.21(1). <br /> 33 <br /> i. <br /> 34 1-06.2(2)D Quality Level Analysis <br /> 35 This section is supplemented with the following new subsection: <br /> 36 <br /> 1 37 1-06.2(2)D5 Quality Level Calculation — HMA Compaction <br /> 38 The procedures for determining the quality level and pay factor for HMA compaction are <br /> 39 as follows: <br /> I 40 <br /> 41 1. Determine the arithmetic mean, Xm, for compaction of the lot: <br /> 42 <br /> I 43 Xn; _ Ix <br /> n <br /> 44 <br /> I <br /> 45 <br /> 46 Where: <br /> x = individual compaction test valines fnr each sublot in the lot. <br /> 47 Xx = summation of individual compaction test values <br /> 1 48 n = total number test values <br /> 49 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> 1 STATE FUND#HLP PB17(014); COE#PW3688 Page AM-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.