Laserfiche WebLink
1 Option 2 (performance based system): <br /> 2 <br /> 3 Primer Coat— Zinc-rich Epoxy 9-08.1(2)N <br /> 4 Primer Stripe Coat— Epoxy 9-08.1(2)N <br /> 5 Intermediate Coat— Epoxy 9-08.1(2)N <br /> 6 Intermediate Stripe Coat— Epoxy 9-08.1(2)N <br /> 7 Top Coat— Polyurethane 9-08.1(2)N <br /> 8 <br /> 9 The following new paragraph is inserted after the first paragraph: <br /> 10 <br /> 11 Paints and related materials shall be a product listed in the current WSDOT Qualified <br /> 12 Products List (QPL). Component based paint systems shall be listed on the QPL in the <br /> 13 applicable sections of Section 9-08. Performance based systems shall be listed on the <br /> 14 current Northeast Protective Coatings Committee (NEPCOAT) Qualified Products List "B" <br /> 15 as listed on the WSDOT QPL in Section 9-08.1(2)N. If the paint and related material for <br /> 16 the component based system is not listed in the current WSDOT QPL, a sample shall be <br /> 17 submitted to the State Materials Laboratory in Tumwater for evaluation and acceptance in <br /> 18 accordance with Section 9-08. <br /> 19 <br /> 20 6-07.3(10)J Mixing and Thinning Paint <br /> 21 This section is revised to read: <br /> 22 <br /> 23 Mixing and thinning paint shall be in accordance with Section 6-07.3(9)C. <br /> 24 <br /> 25 6-07.3(10)K Coating Thickness <br /> 26 This section is revised to read: <br /> 27 <br /> 28 Coating thickness shall be in accordance with Section 6-07.3(9)D except the minimum dry <br /> 29 film thickness of each coat (combination of primer and primer stripe, combination of <br /> 30 intermediate and intermediate stripe, and top) shall not be less than 3.0 mils. <br /> 31 <br /> 32 6-07.3(10)L Environmental Condition Requirements Prior to Application of <br /> 33 Paint <br /> 34 This section is revised to read: <br /> 35 <br /> 36 Environmental conditions shall be in accordance with Section 6-07.3(9)E. <br /> `.17 <br /> 38 6-07.3(10)M Steel Surface Condition Requirements Prior to Application of Paint <br /> 39 The third paragraph is revised to read: <br /> 40 <br /> 41 Edges of existing paint shall be feathered in accordance with SSPC-PA 1, Shop, Field, <br /> 42 and Maintenance Coating of Metals, Note 15.20. <br /> 43 <br /> 44 6-07.3(10)N Field Coating Application Methods <br /> 45 The third sentence is revised to read: <br /> 46 <br /> 47 The Contractor may apply stripe coat paint using spray or brush but shall follow spray <br /> 48 application using a brush to ensure complete coverage around structural geometric <br /> 49 irregularities and to push the paint into gaps between existing steel surfaces and around <br /> 50 rivets and bolts. <br /> 51 ' <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-52 <br />