My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 7-02.AP7 <br /> 2 Section 7-02, Culverts <br /> 3 April 2, 2018 <br /> III 4 7-02.2 Materials <br /> 5 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 6 Cement Concrete" are revised to read: <br /> 17 <br /> 8 Cement 9-01 <br /> 9 Aggregates for Concrete 9-03.1 <br /> I 10 <br /> 11 7-02.3(6)A4 Excavation and Bedding Preparation <br /> 12 The first sentence of the third paragraph is revised to read: <br /> i 13 <br /> 14 The bedding course shall be a 6-inch minimum thickness layer of culvert bedding material. <br /> 15 defined as granular material either conforming to Section 9-03.12(3) or to AASHTO <br /> 16 Grading No. 57 as specified in Section 9-03.1(4)C. <br /> I 17 <br /> 18 7-05.AP7 <br /> 19 Section 7-05, Manholes, Inlets, Catch Basins, and Drywells <br /> I20 August 6, 2018 <br /> 21 7-05.3 Construction Requirements <br /> i 22 The fourth sentence of the third paragraph is deleted. <br /> 23 <br /> 24 7-08.AP7 <br /> I 25 Section 7-08, General Pipe Installation Requirements <br /> 26 April 2, 2018 <br /> 27 7-08.3(3) Backfilling <br /> I 28 The fifth sentence of the fourth paragraph is revised to read: <br /> 29 <br /> 30 All compaction shall be in accordance with the Compaction Control Test of Section 2- <br /> 31 03.3(14)D except in the case that 100% Recycled Concrete Aggregate is used. <br /> 32 <br /> 33 The following new sentences are inserted after the fifth sentence of the fourth paragraph: <br /> I 34 <br /> 35 When 100% Recycled Concrete Aggregate is used, the Contractor may submit a written <br /> 36 request to use a test point evaluation for compaction acceptance. Test Point evaluation <br /> 37 - shall be performed in accordance with SOP 738. <br /> 38 <br /> 39 8 01.AP8 <br /> 40 Section 8-01, Erosion Control and Water Pollution Control <br /> I41 April 1, 2019 <br /> 42 8-01.1 Description <br /> I 43 This section is revised to read: <br /> 44 <br /> 45 This Work consists of furnishing, installing, maintaining, removing and disposing of best <br /> 46 management practices (BMPs), as defined in the Washington Administrative Code (WAC) <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.