My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 8-01.3(2)D Mulching <br /> 2 This section, including title, is revised to read: <br /> 3 <br /> 4 8-01.3(2)D Temporary Mulching <br /> I 5 Temporary mulch shall be straw, wood strand, or HECP mulch and shall be used for the <br /> 6 purpose of erosion control by protecting bare soil surface from particle displacement. <br /> 7 Mulch shall not be applied below the anticipated water level of ditch slopes, pond bottoms, <br /> I 8 and stream banks. HECP mulch shall not be used within the Ordinary High Water Mark. <br /> 9 Non-HECP mulches applied below the anticipated water level shall be removed or <br /> 10 anchored down so that it cannot move or float, at no additional expense to the Contracting <br /> 11 Agency. <br /> 12 <br /> 13 Straw or wood strand mulch shall be applied at a rate to achieve at least 95 percent visual <br /> 14 blockage of the soil surface. <br /> I 15 <br /> 16 Short Term Mulch shall be hydraulically applied at the rate of 2500 pounds per acre and <br /> 17 may be applied in one lift. <br /> I 18 <br /> 19 Moderate Term Mulch and Long Term Mulch shall be hydraulically applied at the rate of <br /> 20 3500 pounds per acre with no more than 2000 pounds applied in any single lift. <br /> I 21 <br /> 22 Mulch sprayed on signs or sign Structures shall be removed the same day. <br /> 23 <br /> 24 Areas not accessible by mulching equipment shall be mulched by accepted <br /> I 25 hand methods. <br /> 26 <br /> 27 8-01.3(2)F Dates for Application of Final Seed, Fertilizer, and Mulch <br /> I 28 This section is deleted in its entirety. <br /> 29 <br /> 30 8-01.3(2)G Protection and Care of Seeded Areas <br /> I 31 This section is deleted in its entirety. <br /> 32 <br /> 33 8-01.3(2)H Inspection <br /> I 34 This section is deleted in its entirety. <br /> 35 <br /> 36 8-01.3(2)1 Mowing <br /> r This section is deleted in its eiii i eiy. <br /> 38 <br /> 39 8-01.3(3) Placing Biodegradable Erosion Control Blanket <br /> 40 This section's title is revised to read: <br /> I 41 <br /> 42 8-01.3(3) Placing Erosion Control Blanket <br /> 43 <br /> I 44 The first sentence of the first paragraph is revised to read: <br /> 45 <br /> 46 Erosion Control Blankets are used as an erosion prevention device and to enhance the <br /> I 47 establishment of vegetation. <br /> 48 <br /> 49 The second paragraph is revised to read: <br /> 50 <br /> 1 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> IIISTATE FUND#HLP PB17(014); COE#PW3688 Page AM-77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.