My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 -47 <br /> South Precinct Roof Replacement <br /> 12.4.4 Inefficiencies <br /> 12.4.4.1 Adjustment of Contract Sum <br /> To the extent Contractor is entitled to an increase in Contract Sum because of inefficiencies or impaired <br /> productivity,then compensation due, if any, shall be calculated as provided in 9.5. ADJUSTMENT OF <br /> CONTRACT SUM. <br /> 12.4.4.2 Adjustment of Contract Time <br /> To the extent Contractor is entitled to an extension of Contract Time because of inefficiencies or impaired <br /> productivity, then the time extension, if any, shall be determined as provided in 5.2.2.2 Extensions of <br /> Contract Time. <br /> 13. DISPUTES <br /> 13.1 RESOLUTION <br /> When a Dispute occurs during a Contract,the Contractor shall pursue resolution through the Owner's <br /> Representative. The Contractor shall follow the procedure outlined General Condition 12. CONTRACT <br /> CLAIMS herein and 5.2.2.2 Extensions of Contract Time for issues regarding the schedule and <br /> Contract Time. Timely and adequate Notice is a condition precedent to a Contract Claim. Timely and <br /> complete submission of a Contract Claim is a condition precedent to any entitlement by the Contractor to <br /> an adjustment of Contract Sum or Contract Time. Unless waived by the Owner,mediation is a condition <br /> precedent to the filing of any lawsuit, action or proceeding that seeks to recover on a Contract Claim, <br /> whether in whole or in part. <br /> 13.2 CONTINUING THE WORK <br /> Contractor shall carry on the Work and adhere to the schedule during all disputes or disagreements with <br /> Owner. No Work shall be delayed or postponed pending resolution of Disputes or disagreements, except <br /> as permitted by paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. <br /> 14. TIME LIMITATIONS AND JURISDICTION <br /> The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when they arise. <br /> The parties intend that all Claims and Disputes be resolved quickly and expeditiously and desire to avoid <br /> claims and Disputes that relate back to events or Work occurring months before. The parties desire to <br /> avoid litigation and the costs and expense of Claims and Disputes at the end of the Project. <br /> Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or Contract Claim <br /> of any kind whatsoever, must be submitted, if at all, to the Owner or Owner's Representative no later than <br /> thirty (30) days after Notice was first required to be given by the Contractor as provided in 10.NOTICE <br /> I , TO OWNER. Failure to submit a Contract Claim within the thirty(30) days of the date Notice was <br /> required pursuant to 10. NOTICE TO OWNER constitutes a complete waiver of and bar to the Contract <br /> Claim, and Contractor is estopped from later asserting a Contract Claim or seeking any relief or remedy <br /> relating to the Dispute for which it failed to submit a Claim. <br /> Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever against the Owner <br /> on any Contract Claim or Dispute after the expiration of one hundred eighty(180) days from Physical <br /> Completion. <br /> Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring prior to <br /> Substantial Completion shall be deemed to have accrued in any and all events not later than such date of <br /> Substantial Completion. <br /> I <br /> 00 72 00 -47 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.