City of Everett 01 29 73 -4 <br /> South Precinct Roof Replacement <br /> F. Operation and Maintenance Manuals: Include line item of at least 1 percent of Contract <br /> Sum for preparation, maintenance, and duplication. Upon completion, a portion of this <br /> amount will be released based upon percentage of completion of the Work as a whole. I <br /> G. Commissioning: Include line item of at least 1 percent of Contract Sum for Section <br /> 23 08 00 - Heating Ventilating and Air Conditioning, for cooperation and coordination <br /> with Commissioning Agent. <br /> 1. Commissioning Agent work includes systems documentation, start up, operation, <br /> control system calibration and verification, performance testing, adjusting building <br /> systems, and as required for completion of commissioning work of Section 01 91 <br /> 13. <br /> 2. Payment for of each line item of work will be made based upon percentage <br /> completion of work and percentage of completion of commissioning work. <br /> H. Punch List Work: Include line item of 1 percent of Contract Sum or itemize separately <br /> by line item for each work activity. Payment of thisl percent for each line item will be <br /> authorized as each line item of work is complete and related testing and inspections <br /> are satisfactorily completed. , <br /> I. Total Contract Sum for Actual Construction Costs: <br /> 1. Total Contract Sum (base bid plus accepted alternates) on Schedule of Values. I <br /> 2. Where a project is phased, further sub-divide categories by Phases of the Work. <br /> 1.7 LINE <br /> ITEM CATEGORIES <br /> A. Arrange Schedule of Values in tabular form with separate columns. Break out following <br /> for each work activity listing. <br /> 1. Section Number from Project Specifications Table of Contents <br /> 2. Description of Work. <br /> 3. Name of subcontractor. <br /> 4. Name of manufacturer or fabricator. <br /> 5. Name of supplier. <br /> 6. Scheduled Value for each Item of Work. <br /> 7. Pervious Work Complete, including Cost Value and Percent Complete. <br /> 8. Present Work Complete, including Cost Value and Percent Complete. <br /> 9. Change Orders (numbers) that affect value. <br /> 10. Total Billing, including Billing to Date, Percent of Contract Sum, and Balance to <br /> Finish. Show dollar value as percentage of Contract Sum to nearest one- <br /> hundredth percent, adjusted to total 100 percent. <br /> 11. Retainage. <br /> 12. Stored Material. I <br /> 1.8 COST CATEGORIES <br /> A. Assign following, making sum equal to total cost for each line item activity to show <br /> initial costs of work activity and total installed cost. <br /> 01 29 73 - 4 SCHEDULE OF VALUES <br /> 1 <br />