My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 <br /> 31 13 - 2 <br /> South Precinct Roof Replacement <br /> 1.7 The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br /> subcontractors, manufacturers, suppliers and their employees. <br /> 1.8 Contractor shall be responsible for the adequacy, efficiency and sufficiency of its <br /> employees. Workers shall have sufficient knowledge, skill and experience to perform <br /> properly the work assigned to them. <br /> 1.9 Coordination between adjacent business that utilize the adjoining alley and easement ' <br /> shall be thru the owner. Every effort shall be made to reduce the impact of this project <br /> to any adjacent business. Access thru the alley and easement is critical throughout this <br /> project. ' <br /> 1.10 The contractor shall coordinate and work with the artists whom are performing work on <br /> the owners' behalf. <br /> 1.11 All tenants operating and performing business on the construction site shall be kept ' <br /> appraised of the work that is commencing. Every effort shall be made to reduce the <br /> impacts of this project to the business operating on the construction site. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 31 13 <br /> r <br /> I <br /> I <br /> I <br /> U <br /> 01 31 13 - 2 PROJECT COORDINATION <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.