My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 33 00 - 1 <br /> 1 South Precinct Roof Replacement <br /> SECTION 01 33 00 - SUBMITTAL PROCEDURES <br /> PART 1 - GENERAL <br /> 1.1 DESCRIPTION <br /> A. To ensure that the specified products are furnished and installed in accordance with the <br /> design intent, procedures have been established for advance submittal of design data <br /> and for its review by the Architect/Engineer. <br /> B. Electronic submittals of shop drawings or other documents required for approval may be <br /> substituted for paper copies. Electronic submittals must be submitted utilizing current <br /> Adobe Software. All electronic submittals shall be certified documents and digital signed <br /> showing Contractors review, and stamp showing approval of submittal. All electronic <br /> submittals shall book marked. A table of contents is required and shall be placed directly <br /> behind the cover page. Document properties shall include the Job Name, Division <br /> (Section Number), and items included in submittal. Prior to use of Electronic submittals, <br /> discuss with Owner, procedures and formatting including any additional contents to be <br /> included within the document. <br /> C. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> specifications. <br /> 2. SECTION 00 72 00-2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and resubmit as <br /> required to establish compliance with the specified requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum acceptable <br /> quality of workmanship and materials has been defined by manufacturer's <br /> description of required attributes and performance. <br /> 1.2 PRODUCT HANDLING <br /> A. Make all submittals of shop drawings, samples, requests for substitution, and other <br /> 1 similar items in strict accordance with the provisions of this section of the specifications. <br /> PART 2 - PRODUCTS <br /> 2.1 SHOP DRAWINGS <br /> A. Unless otherwise specifically directed otherwise, format all shop drawings to be <br /> formatted to fit on 11" x 17" size paper. Make all shop drawings accurately to a scale <br /> sufficiently large enough to show all pertinent features of the item and its method of <br /> connection to the work. <br /> I <br /> 01 33 00 - 1 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.