My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 35 29 - 1 <br /> South Precinct Roof Replacement <br /> SECTION 01 35 29 - HEALTH AND SAFETY <br /> PART 1 - GENERAL <br /> I <br /> 1.1 SECTION INCLUDES <br /> A. This Section covers the requirements for compliance with health and safety precautions <br /> and controls for projects without hazardous waste operations. <br /> B. Safety plan. <br /> C. Protection of equipment, public and city staff. <br /> 1.2 REFERENCES <br /> A. General: The publications listed below form a part of these specifications to the extent <br /> referenced. The publications are referred to in the text by basic designations only. <br /> B. Code of Federal and State Regulations <br /> 1. OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication <br /> V2206; OSHA Construction Industry Standards (29 CFR 1926.) <br /> 2. National Emission Standards for Hazardous Air Pollutants (40 CFR, part 61). <br /> 3. Washington State Department of Labor and Industries (WISHA)49.17-49.26 RCW <br /> 4. Washington Administration Code (WAC) 296-155 Safety Standards for <br /> ' Construction Work <br /> 1.3 SUBMITTALS <br /> A. The following submittals are required to be delivered within 5 days after Notice to <br /> Proceed has been received. <br /> 1. Health and Safety Plan (specific to this project) <br /> 2. Fall Protection Plan (specific to this project) <br /> 3. Copies of all minutes/notes from daily safety meetings. <br /> 1.4 ACCIDENT REPORTING <br /> A. Serious accidents such as those resulting in treatment of an injury at a medical facility, <br /> response to the site by emergency medical personnel or damage to property other than <br /> that of the Contractor shall be reported to the Owner within twenty-four (24) hours of the <br /> occurrence. <br /> B. A copy of each accident report, which the Contractor or subcontractors have submitted <br /> to their insurance carriers, shall be forwarded to the Owner as soon as possible, but in <br /> no event later than seven (7) calendar days after the accident occurred. <br /> I <br /> 01 35 29 - 1 HEALTH AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.