My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 42 00 - 4 <br /> South Precinct Roof Replacement <br /> CONC. CONCRETE <br /> COND. CONDITION <br /> CONN. CONNECTION <br /> CONT. CONTINUOUS <br /> C.P. CONCRETE PIPE <br /> C.P.P. CORRUGATED-PERFORATED PIPE <br /> CTRS. CENTERS <br /> C.W. CONCRETE WALK <br /> C.Y. CUBIC YARD <br /> D.F. DOUGLAS FIR <br /> DET. DETAIL <br /> DIA. DIAMETER <br /> DIM. DIMENSION <br /> D.L. DAYLIGHT GRADE <br /> E. EAST <br /> EA. EACHI <br /> E.J. EXPANSION JOINT <br /> ELEC. ELECTRICAL <br /> EL.or ELEV. ELEVATION <br /> ENG. ENGINEER <br /> E.P. EDGE OF PAVING <br /> E/Q. EQUAL <br /> I <br /> E.W. EACH WAY <br /> EX. EXISTING <br /> EXIST. EXISTING <br /> F.E. FINISHED ELEVATION <br /> F.G. FINISH GRADE <br /> F.H. FIRE HYDRANT <br /> FIN. FINISH <br /> F.L. FLOW LINE <br /> FLD. FIELD <br /> F.S. FINISH SURFACE1 <br /> FTG. FOOTING <br /> GA. GAUGE <br /> GAL. GALLON <br /> GALV. GALVANIZED <br /> G.C. GROUND COVER <br /> G.E. GRATE ELEVATION <br /> G.I. GALVANIZED IRON <br /> H.B. HOSE BIBB <br /> HDPE HIGH DENSITY POLYETHYLENE <br /> HDR. HEADERBOARD or HEADER <br /> H.H. HAND HOLE <br /> HT. HEIGHT <br /> I.D. INSIDE DIAMETER <br /> I.E. INVERT ELEVATION <br /> INV. INVERT <br /> J.B. JUNCTION BOXI <br /> JTS JOINTS <br /> L.A. LANDSCAPE ARCHITECT <br /> L.C. LENGTH OF CURVEI <br /> 01 42 00 - 4 REFERENCES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.