My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 21 13 - 9 <br /> South Precinct Roof Replacement <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are not <br /> sufficient, complete or adequate to support the Bidder's planned means and <br /> methods of performing the Work, the Bidder must develop an adequate, complete <br /> and sufficient traffic control plan at its cost, that shall be submitted for the City's <br /> approval prior to construction. Deviation from the Standard Plans must be <br /> submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The <br /> Contractor shall provide the City with copies of all permits for disposal and storage <br /> of surplus materials within ten calendar days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING <br /> A. The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to Bidders. <br /> Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1.24 BUSINESS LICENSE <br /> A. A City of Everett business license is required for the Contractor and Subcontractors <br /> performing Work on this Project. <br /> 111 PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 00 21 13 <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> 1 <br /> 00 21 13 - 9 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.