My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> City of Everett <br /> South Precinct Roof Replacement Addendum No. 1 <br /> EVERETT <br /> ' WASHINGTON <br /> ' ADDENDUM NO. 1 <br /> TO <br /> SOUTH PRECINCT ROOF REPLACEMENT <br /> ' PROJECT NO. 342-522 <br /> DATE <br /> NOTICE TO BIDDERS <br /> ' Addendum No. 1 contains the following revisions, additions, deletions and classifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> ' Bidders must acknowledge receipt of all addenda in the space provided on page 2, paragraph <br /> 12 in Section 00 41 13-2- Bid Form. <br /> Signed copies of all addenda must be submitted with the bid. <br /> ppp8, <br /> 7/41/4 <br /> 7//r/ <br /> Bidder Signature Date <br /> ' Failure to comply with this requirement may result in rejection of bid. <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> ' ITEM 1—SECTION 00 52 13—AGREEMENT FORM—Page 1, Paragraph 2.—Revise to read as follows: <br /> Contract Time. Substantial Completion of the Work shall be achieved within Ninety(90) <br /> ' calendar days after the effective date of Notice to Proceed. Physical Completion shall be within Thirty <br /> (30)calendar days after the actual date of issuance of substantial completion. <br /> ' Drawing A3 <br /> Revise note 2 to reference detail 12 drawing A4. <br /> Revise note 19 to read: New roof drain insert per manufacturers details. Details are attached. <br /> (Drain with metal insert, Sarnadrain with U-Flow). <br /> ' Drawing A4 <br /> Add detail 12 at the existing HVAC units as attached. <br /> Page 1of2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.