My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 00 63 25 - 2 <br /> South Precinct Roof Replacement <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? ' <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. I <br /> Submitted by: <br /> Signature Date <br /> Printed <br /> Firm , <br /> Address <br /> Telephone <br /> For use by Architect/Engineer: <br /> Accepted Accepted as Noted Not Accepted Received Too <br /> Late <br /> BY: Date: <br /> Remarks: , <br /> For use by Owner: <br /> Accepted Accepted as Noted Not Accepted Received Too Late , <br /> Project Manager Date I <br /> Remarks: <br /> i <br /> 00 63 25 - 2 SUBSTITUTION REQUEST FORM , <br />
The URL can be used to link to this page
Your browser does not support the video tag.