Laserfiche WebLink
tCity of Everett 00 72 00 -v <br /> South Precinct Roof Replacement <br /> I13.1 Resolution 47 <br /> 13.2 Continuing the Work 47 <br /> I14. TIME LIMITATIONS AND JURISDICTION 47 <br /> 15. LIABILITY AND INSURANCE 48 <br /> I <br /> 15.1 General 48 <br /> 15.2 Bonds 48 <br /> I 15.2.1 Payment and Performance Bond 48 <br /> 15.2.2 Maintenance Bond 48 <br /> 15.3 Insurance 48 <br /> I 15.3.1 General 48 <br /> 15.3.2 Insurer Rating 48 <br /> 15.3.3 Claims Made Form Requirements 48 <br /> I 15.3.4 Cross Liability Endorsement 49 <br /> 15.3.5 Additional Insured 49 <br /> 15.3.6 Contractor Insurance Primary 49 <br /> 1 15.3.7 Assumption of Risk 49 <br /> 15.3.8 Cost Included in Price 49 <br /> 15.3.9 Subcontractors 49 <br /> 1 15.3.10 No Work Until Insurance Requirements Met 49 <br /> 15.3.11 Failure to Procure and Maintain Insurance • 49 <br /> I 15.3.12 Cancellation 50 <br /> 15.3.13 Evidence of Insurance 50 <br /> 15.3.14 Coverages and Limits 50 <br /> I 15.3.14.1 CGL 50 <br /> 15.3.14.2 Builders' Risk 51 <br /> 15.3.14.3 Other Coverages 51 <br /> I 15.3.14.4 Limits 51 <br /> 15.3.14.5 Automobile 51 <br /> 15.3.14.6 Excess or Umbrella Liability 52 <br /> 1 15.3.14.7 Pollution Liability 52 <br /> 15.3.14.8 Worker's Compensation 52 <br /> 15.3.15 Self-Insurance 52 <br /> I16. LAWS,REGULATIONS AND PERMITS 52 <br /> 16.1 General 52 <br /> 1 16.2 Permits and Licenses 52 <br /> 16.3 Patents and Royalties 53 <br /> I 17. AUDITS 53 <br /> 17.1 General 53 <br /> 17.2 Claims 54 <br /> 1 17.3 Required Documentation for Audits 54 <br /> 18. MISCELLANEOUS 55 <br /> I <br /> 18.1 Construction 55 <br /> 00 72 00 -v GENERAL CONDITIONS <br />