My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 5 <br /> South Precinct Roof Replacement <br /> ' 2. Supplemental agreements between Owner and Contractor, if any, subsequent to the Owner's <br /> PP g q <br /> execution of the Contract; <br /> 1 3. Addenda; <br /> 4. The Contract; <br /> 5. Specifications, including, but not limited to,these General Conditions and other numbered <br /> Sections; <br /> ' 6. Supplementary Conditions, if any; <br /> 7. Drawings; <br /> 8. Change Orders; <br /> 1 9. City of Everett standard plans in effect as of the date Bids are opened; <br /> 10. Instructions to Bidders; <br /> 1 11. Contractor's completed Bid Form; and <br /> 12. Certifications and affidavits as required by this Contract and by law. <br /> These parts complement each other in describing the complete Work. Any requirement in one part binds <br /> as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the Contract <br /> even if the Contract does not mention it specifically. Any inconsistency in the parts of the Contract shall <br /> ' be referred to the Owner's Representative attention for a determination of the intended requirements. <br /> The Work required in one part must be furnished even if not mentioned in other parts of the Contract. If <br /> any part of the Contract requires Work that does not include a description for how the Work is to be <br /> performed,the Work shall be performed in accordance with standard trade practice(s). For purposes of <br /> the Contract, a standard trade practice is one having such regularity of observance in the trade as to justify <br /> an expectation that the Contractor will follow or observe the practice in performing the Work. In case of <br /> any ambiguity, disagreement or Dispute over interpreting the Contract,the Owner's Representative's <br /> decision will be final as provided in these General Conditions. <br /> Approved Shop Drawings, other Contractor's Submittals, and the reports and drawings of subsurface and <br /> 1 physical conditions are not Contract Documents. <br /> 2. SPECIFICATIONS AND DRAWINGS <br /> 2.1. INTERPRETATION OF SPECIFICATIONS AND DRAWINGS <br /> The Specifications and Drawings are intended to be explanatory and supportive of each other. Work <br /> ' specified on the Drawings and not in the Specifications, or vice versa, shall be executed as if specified in <br /> both. In the event the Work to be done or matters relative thereto are not sufficiently detailed or <br /> explained in the Contract Documents,the Contractor shall immediately ask the Owner's Representative <br /> for further explanation and shall comply with such explanation. In the event of doubt or question arising <br /> respecting the true meaning of the Specifications or Drawings, Contractor shall refer to the Owner's <br /> Representative for his or her decision. <br /> The Specifications may vary in form, format and style. Some specification sections are written in varying <br /> degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. <br /> Omissions of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as <br /> specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by <br /> inference. Similar types of provisions may appear in various parts of a section or articles within a part <br /> depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br /> format or style in making claims for extra Work. <br /> The cross referencing of specification sections under the subparagraph heading "Related Sections include <br /> but are not necessarily limited to:" and elsewhere within each specification section is provided as an aid <br /> 00 72 00 - 5 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.