Laserfiche WebLink
City of Everett 00 72 00 - 10 <br /> South Precinct Roof Replacement <br /> The Contractor shall submit supplemental working or detail drawings as required for the performance of <br /> the Work pursuant to 2.4. SUBMITTALS. Except as noted, all drawings and other Submittals shall be <br /> delivered directly to the Owner's Representative. The drawings shall be on sheets measuring 22 by 34 <br /> inches, 11 by 17 inches, on sheets with dimensions in multiples of 8 1 /2 by 11 inches, or other size <br /> approved by the Owner consistent with the Work to be detailed. Contractor shall provide drawings far <br /> enough in advance of ordering or installation to allow for review by the Owner's Representative or other <br /> agencies and possible resubmittal and further review after resubmittal. After a plan or drawing has been <br /> reviewed and returned to the Contractor, all changes proposed by the Contractor may be submitted to the <br /> Owner's Representative for review and comment. <br /> The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not impose <br /> any responsibility upon the Owner, nor does it relieve the Contractor of any responsibility for the 111accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all risk and all <br /> costs of any Work delays caused by resubmittal or correction of Submittals. The Contractor shall allow <br /> sufficient time for Owner's review of Submittals and possible corrections by the Contractor so as not to <br /> delay the Work. <br /> The Contractor's Bid price shall include all costs of all Submittals, including,but not limited to,working, <br /> detail and shop drawings. <br /> 4. CONTRACTOR <br /> 4.1. CONTRACTOR'S REPRESENTATIVE I <br /> The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. This <br /> person shall have authority to carry out the provisions of the Contract and to supply materials, Equipment, <br /> tools and labor without delay for the performance of the Work. <br /> Contractor shall employ and keep on Site on a full time basis personnel experienced in the management <br /> of construction of projects of this size and type. These shall include, but not be limited to, a project <br /> manager and superintendent. Neither the Contractor's project manager nor the superintendent shall have <br /> supervisory responsibility for other Projects for the Contractor while assigned to this Project. Contractor <br /> shall employ and assign such additional,full time office, support and engineering personnel to support the <br /> project manager and superintendent and allow timely completion of the Project. The project manager and <br /> superintendent must be approved by the Owner, and such approval shall not be unreasonably withheld. <br /> Contractor acknowledges that one of the instances in which it will be reasonable for the Owner to <br /> withhold consent is if the project manager or superintendent is different than as stated in the Bidder <br /> Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br /> Contractor's execution of the Contract. Bases for disapproval include, but are not limited to, lack of <br /> sufficient experience managing the construction of similar type or size projects or relationships on other <br /> projects unsatisfactory to the Owner. Owner may require removal and replacement of Contractor's <br /> supervisory staff who are disruptive or who appear to lack sufficient competence to complete the Project <br /> successfully. <br /> 4.2. CONSTRUCTION PROCEDURES <br /> The Contractor shall supervise and direct the Work and determine the means, methods,techniques, <br /> sequences and procedures of construction, except in those instances where the Owner,to define the <br /> quality of an item of Work, specifies in the Contract, a means, method,technique, sequence or procedure <br /> for construction of that item of Work. <br /> 4.3. SUBCONTRACTORS <br /> Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in writing by the <br /> Owner before Contractor submits its Bid,the Contractor shall perform with its own organization at least <br /> 00 72 00 - 10 GENERAL CONDITIONS <br />