City of Everett 00 72 00 -21 <br /> South Precinct Roof Replacement <br /> accepted as substantially complete. Except for any portion(s) of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> ' entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work, set the date for their completion and repair, describe the <br /> division of responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work <br /> ' during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner, however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> S.S. ACCEPTANCE OF WORK <br /> Upon completion of the Project, including, but not limited to,record drawings, as-builts, required reports <br /> ' and operations and maintenance manuals, the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection, determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> ' Owner's Representative finds materials, Equipment, or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> ' determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete, the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety, and the Contractor agrees to perform the Work as changed.Among <br /> ' others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this Contract, <br /> and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> ' 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> ' 6. Altering facilities, Equipment, materials, services, or sites, provided by the Owner, and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> ' If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time, the Owner may, at its sole option, unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> ' Contractor without explicit notice from the Owner to proceed. <br /> 6.2 EXTRA WORK <br /> At its sole option, the Owner may (1)perform Extra Work itself, (2)employ others to do it, (3) direct the <br /> 111 <br /> Contractor to perform the Extra Work at existing unit bid price, (4) direct the Contractor to perfoi in the <br /> 00 72 00 -21 GENERAL CONDITIONS <br />