My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 -25 <br /> South Precinct Roof Replacement <br /> ' construction of any nature, and other services and facilities of any nature,whatsoever necessary, to <br /> execute, complete and deliver the Work within the specified time. Contractor shall be liable for all power <br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or <br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br /> ' and of the specified quality. Equipment offered shall be new or current specified models. This <br /> requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> ' of the trade. <br /> 8.2. PRODUCT DATA <br /> ' When specified,the Contractor shall provide data required for inspecting,testing, operating, or <br /> maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the time the <br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include, unless otherwise specified, such items as shop drawings, erection drawings, reinforcing steel <br /> ' schedules,testing and adjusting instructions, operations manuals,maintenance procedures, parts lists, and <br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> ' 8.3. QUALITY <br /> Where detailed Specifications of materials, Equipment, or construction Work are not set forth,the <br /> ' Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work, from fines of established good <br /> reputations, and shall follow standard practices to perform construction Work of good quality in a <br /> ' workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to applicable building codes in effect when the Work is performed. <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents, brand names, or catalog numbers, the <br /> ' Owner will not usually consider or approve a substitution. However, the Contractor may offer <br /> substitutions of products it considers to be equal to that specified, but the Owner is not obliged or required <br /> to consider or accept such offered substitution. <br /> ' 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> ' substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> ' obligated to consider or review a request for substitution and may, in their sole discretion and option, <br /> consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work, the <br /> 111 Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> ' Contractor from responsibility for the efficiency, quality, and performance of the substitute material or <br /> Equipment, in the same manner and degree as the material and Equipment originally specified. Any cost <br /> differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br /> ' substitution,the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 00 72 00 -25 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.