Laserfiche WebLink
GENERAL NOTES <br /> SCALE: 12"=1'-0" �� ��� � <br /> ��= <br /> ,�.. <br /> 1.ALL CONSTRUCTION SHALL COMPLY WITH THE(201518C WITH WAC 51-50,2015/EBC WITH DIMENSION: ADDITIONAL GENERAL CONTRACTOR RESPONSIBILITY: 1.THE GENERAL CONTRACTOR SHALL PROVIDE SUBMITTALS FOR REVIEW&APPROVAL BY <br /> WAC 51-50,AND WAC 51-11),AND ALL APPLICABLE LOCAL CODES,ORDINANCES,AND 1.ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS 1.GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE FINAL AS BUILT DRAWINGS INCLUDING UNISPACE.G.C.IS TO PROVIDE TWO SAMPLES OF THE SPECIFIED MATERIALS.SUBMITTALS Teleport Towers, Kingsfordweg 151 <br /> STANDARDS. IN CASE OF ANY CONFLICT WHERE THE METHODS OR STANDARDS OF GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OF ACCURACY.DO ARCHITEGTURAL,MECHANICAL,ELECTRICAL,PLUMBING AND�IFE SAFETY TO CLIENT IN FINAL SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:DRAW DOWNS OF ALL PAINTS, 1043GR,Amsterdam, Netherlands <br /> INSTALLATION OF THE MATERIALS SPECIFIED DO NOT EQUAL OR EXCEED THE NOT SCALE DRAWINGS.THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND CLOSE OUT DOCUMENTS. SAMPLES OF ALL CARPETS,ALL SPECIFIED FLOOR BASE,SAMPLES OF ALL WALL FINISHES, +31 20 491 7202 <br /> REQUIREMENTS OF THE LAWS OF ORDINANCES,THE LAWS OR ORDINANCES SHALL GOVERN. DIMENSIONS AND SHALL NOTIFY UNISPACE OF ANY DISCREPANCIES OR CONDITIONS OR 2.THE CONTRACTOR WILL INSPECT THE PREMISES IMMEDIATELY TO CHECK EXISTING WORKING SAMPLES OF SPECIFIED CABINET FINISHES,SAMPLES OF CEILING GRID&CEILING TILE, www.unispace.com <br /> NOTIFY THE ARCHITECT OF ALL CONFLICTS. CONDITIONS ADVERSELY EFFECTING THE DESIGN PRIOR TO PROCEEDING WITH THE CONDITIONS.SHOULD THE CONTRACTOR FIND CONDITIONS WHICH HE/SHE BELIEVES WOULD PACKAGES OF LIGHTING SUBMITTALS,DOOR&HARDWARE,MILLWORK SHOP DRAWINGS, � <br /> 2.THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF THE WORK. IMPEDE HISIHER WORK,THEN SUCH CONDITIONS MUST BE REPORTED IMMEDIATELY TO THE MILLWORK HARDWARE SUBMITTALS,ETC.PROVIDE(3)12"X12°WOOD VENEER SUBMITTALS. ` M z <br /> ARCHITECT OF RECORD AND SHALL NOT BE REPRODUCED OR USED FOR ANY OTHER 2.DIMENSIONS OF PLANS ARE TYPICAL TO THE CENTERLINE OF COLUMNS AND FINISH GWB OWNER.FAILURE TO SO ADVISE WILL CONSTITUTE NOTICE THAT THE CONTRACTOR IS FULLY 2.THE GENERAL CONTRACTOR SHALL INCLUDE IN HIS/HER ESTIMATE ALL COSTS,(INCLUDING Consultants: <br /> PURPOSE EXCEPT BY WRITTEN AGREEMENT. FACE OF PARTITIONS,UNLESS NOTED OTHERWISE.DOOR GASED OPENINGS WITHOUT SATISFIED WITH THE EXISTING CONDITIONS AND THAT HE/SHE INTENDS TO PERFORM HIS/HER OVERTIME WORK)FOR REMOVAL,NEW INSTALLATION&REINSTALLATION WORK FOR ANY <br /> 3.SECURE RELEVANT CITY AND STATE APPROVALS RELATING TO FIRE,CONSTRUCTION, LOCATION DIMENSIONS ARE TO BE FOUR(4)INCHES FROM THE FACE OF THE ADJACENT OBLIGATIONS WITH NO ALLOWANCE EITHER IN TIME OR MONEY FOR ANY IMPEDIMENTS TO PLUMBING,CEILING(TAKE-DOWN&REINSTALLATION),ELECTRICAL,TELEPHONE <br /> LABOR,HEALTH AND LICENSING.CONTRACTOR SHALL FURTHER POST ALL BONDS AND PARTITION OR CENTERED BETWEEN PARTITIONS. THIS WORK. COMMUNICATIONS EQUIPMENT OR HVAC WORK ON CEILING PLENUM. <br /> SECURE ALL INSURANCE REQUIRED BY LAW OR CONTRACT,FORWARDING PROOF OR SUCH 3.ALL ANGLES ARE AT 90 OR 45 DEGREES UON. 3.THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HIS/HER BEST SKILL 3.THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT&COMPLETE SET OF <br /> ACTIONS TO THE LANDLORD PRIOR TO COMMENCEMENT OF CONSTRUCTION. AND ATTENTION.HE/SHE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION,ANDIOR CONSTRUCTION DRAWINGS ON SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL <br /> 4.WORK NOT INCLUDED IN THIS CONTRACT SHALL BE MARKED"N.I.C."OR SPECIFICALLY CONSTRUCTION: INSTALLATION MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES AND FOR TRADES. <br /> ASSIGNED TO ANOTHER PARTY. 1.GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT ABOUT SITE CONDITIONS THAT COORDINATING ALL PORTIONS OF THE WORK UNDER THIS CONTRACT. 4.ALL EXISTING APPURTENANCES NOT BEING REMOVED SHALL BE REFURBISHED WHERE <br /> 5.CONTRACTORS SHALL VISIT SITE,REVIEW THE DRAWINGS AS SUBMITTED BY THE REQUIRE ADDITIONAL INTERIOR WALLS SUPPORT OR STRUCTURAL DETAILS. 4.ALL WORK SHALL BE EXECUTED IN A NEAT AND WORKMANLIKE MANNER ACCEPTABLE TO REQUIRED.ANY LOOSE ITEMS TIGHTENED(CEILING EXIT SIGNS,ETC.)&ANY MISSING PARTS <br /> ARCHITECT,AND BECOME THOROUGHLY FAMILIAR WITH THE SITE CONDITIONS PRIOR TO 2.INVESTIGATE AND VERIFY LOCATIONS OF EXISTING STRUCTURAL,PLUMBING, THE OWNER. REPLACED BY THE GENERAL CONTRACTOR TO ACHIEVE A FINISHED FIRST CLASS <br /> BIDDING OR CONSTRUCTION. MECHANICAL,AND ELECTRICAL ELEMENTS AND OTHER EXISTING CONDITIONS AND 5.UNLESS OTHERWISE SPECIFICALLY NOTED,THE CONTRACTOR SHALL PROVIDE AND PAY INSTALLATION&APPEARANCE. <br /> 6.ALL WORK SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S LATEST NOTIFY THE ARCHITECT OF NAY AND ALL DISCREPANCIES PRIOR TO PROCEEDING WITH FOR ALL LABOR, MATERIALS, EQUIPMENT,TOOLS,CONSTRUCTION EQUIPMENT,AND 5.ALL REQUIRED EXITS,WAYS OF APPROACH THERETO,&WAYS OF TRAVEL FROM THE EXIT <br /> RECOMMENDATIONS OR WRITTEN DIRECTIONS. THE WORK. MACHINERY,TRANSPORTATION,OTHER FACILITIES AND SERVICES NECESSARY FOR PROPER INTO THE STREET SHALL CONTINUOUSLY BE MAINTAINED FREE FROM ALL OBSTRUCTIONS& <br /> 7.WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, 3.COORDINATE CONSTRUCTION SCHEDULING WITH BUILDING OWNER TO ALLOW ONGOING EXECUTION OF THE COMP�ETION OF THE WORK.THE CONTRACTOR WARRANTS TO THE IMPEDIMENTS FOR UNOBSTRUCTED EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY. <br /> THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. OPERATION OF THE FACILITY DURING CONSTRUCTION. WNER AND BUILDING MANAGEMENT THAT ALL MATERIALS AND EQUIPMENT FURNISHED DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION,ALL EXISTING EXITS,EXIT <br /> 8.WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR, IT IS 4.PROVIDE BLOCKING AS REQUIRED FOR WALL AND CEILING MOUNTED ITEMS. �NDER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED,AND THAT ALL WORK LIGHTING,FIRE PROTECTIVE DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED. <br /> INTENDED THAT SUCH SHALL APPLY TO AS MANY SUCH DEVICES, ITEMS OR PARTS AS ARE 5.OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. WILL BE GOOD QUALITY,FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE 6.EACH CONTRACTOR SHALL MAKE ALL REQUIRED ARRANGEMENTS FOR DELIVERY OF <br /> REQUIRED TO PROPERLY COMPLETE THE WORK. 6.PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. CONSTRUCTION DOCUMENTS.ALL WORK NOT SO CONFORMING TO THESE STANDARDS MAY EQUIPMENT&/OR MATERIALS. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO <br /> 9.VERIFY ALL"BUILDING STANDARDS"WITH BUILDING OWNER PRIOR TO BEGINNING ANY WORK. 7.PATCH AND REPAIR ALL EXISTING SURFACES AS REQUIRED BY DEMOLITION AND NEW BE CONSIDERED DEFECTIVE. IT IS UNDERSTOOD THAT NO INFERIOR OR NON-CONFORMING CHECK THE RULES&REGULATIONS GOVERNING WORK ON THE PREMISES, INCLUDING THE <br /> HOWEVER,THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE CONTRACT CONSTRUCTION TO RECEIVE NEW SCHEDULE FINISHES.ALL SURFACES ARE TO HAVE WORK OF THE MATERIALS WILL BE ACCEPTED WHETHER DISCOVERED AT THE TIME THEY FOLLOWING: <br /> DOCUMENTS WITHOUT THE ARCHITECTS WRITTEN APPROVAL THEREOF.THE CONTRACTOR "LIKE-NEW"APPEARANCE. ARE INCORPORATED IN THE WORK OR AT ANY TIME BEFORE OR AFTER THE FINAL A. DATE&TIME OR DELIVERY SHALL BE ESTABLISHED IN CONJUNCTION WITH THE <br /> AGREES TO DEFEND,INDEMNIFY,AND HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS 8.STUD HEIGHT AND SPACING LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN ACCEPTANCE.IF REQUIRED BY THE OWNER,THE CONTRACTOR SHALL FURNISH PERSON HAVING JURISDICTION OVER PREMISES.OVERTIME CHARGES&!OR ANY <br /> ARISING AS A RESULT OF UNAPPROVED CHANGES. COMPLIANCE WITH ASTM C 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL SATISFACTORY EVIDENCE AS TO THE KIND AND INSTALLATION OF MATERIALS AND NECESSARY EXPENSE SHALL BE PAID BY CONTRACTOR REQUIRING SERVICE. <br /> 10. LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT LOADING REQUIREMENTS. EQUIPMENT. B. BUILDING CONDITIONS, INCLUDING SIZE&LOADING CAPACITY OF ELEVATORS,SIZE OF <br /> THEM FROM DAMAGE.THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR 9.ALL DEMOLISHED MATERIALS TO BE RECYCLED BY AN APPROVED RECYCLER. 6.THE WARRANTIES AND GUARANTEES PROVIDED IN THE CONSTRUCTION DOCUMENTS SHALL DOORWAYS,CORRIDORS,WINDOW OPENINGS,ETC.,SHALL BE CHECKED BY THE <br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN BE IN ADDITION TO AND NOT IN LIMITATION OF ANY OTHER WARRANTY AND GUARANTY OR CONTRACTOR BEFORE DELIVERY TO ASSURE ITEMS WILL FIT INTO SPACE. <br /> CONJUNCTION WITH THE EXECUTION OF THIS WORK. LIFE SAFETY: REMEDY REQUIRED BY LAW OR THE CONSTRUCTION DOCUMENTS. C. ALL CHARGES INVOLVING THE INSTALLATION&/OR OPERATION OF A HOIST SYSTEM, IF <br /> 11.VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL UTILITY COMPANIES UNLESS 1.IF NECESSARY,PROVIDE FIRE PROTECTION AT ALL PENETRATIONS OF FIRE RELATED 7.ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE(1)YEAR AFTER COMPLETION REQUIRED,SHALL BE BORNE BY THE CONTRACTOR USING THE SYSTEM.CHARGES <br /> OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS. ELEMENTS AS REQUIRED BY CODE. UNLESS OTHERWISE SPECIFIED,AND SHALL BE SO STATED IN CONTRACTOR'S WRITTEN INVOLVING THE TEMPORARY REMOVAL&REINSTALLATION OF WINDOW SASH&/OR <br /> 12.ALL DEBRIS SHALL BE REMOVED FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A 2.FIRE EXTINGUISHERS:VERIFY LOCATION,TYPE,AND SIZE PER FIRE MARSHAL PROPOSAL AGREEMENT.ALL REPAIRS,CORRECTIONS,DISCREPANCIES,ETC.,MUST BE FIXED PANELS REQUIRED FOR DELIVERY SHALL BE BORNE BY THE CONTRACTOR. <br /> CLEAN CONDITION AT ALL TIMES. REQUIREMENTS.CONTRACTOR TO PROVIDE ALL TEMPORARY AND PERMANENT FIRE MADE WITHOUT ANY ADDITIONAL COST TO THE OWNER,AND WITHIN FIVE(5)DAYS AFTER 26.THE GENERAL CONTRACTOR,SUBCONTRACTOR&TENANTS CONTRACTOR SHALL SUBMIT <br /> 13. PROTECT ADJACENT WORK AND REPAIR ANY DAMAGE AT CONTRACTOR'S OWN EXPENSE. EXTINGUISHERS REQUIRED UNDER N.F.P.A. 10 MOST RECENT EDITION AND APPROVED BY NOTICE IS GIVEN. CERTIFICATES TO THE BUILDING MANAGER&OWNER UPON COMPLETION OF WORK, INCLUDING <br /> 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN THE FIRE MARSHAL.CONFIRM ACCESSIBILITY OF LOCATION WITH FIRE ALARM PRIOR TO 8.THE ARCHITECT AND THE ARCHITECT'S CONSULTANTS SHALL NOT HAVE ANY RESPONSIBILITY BUT NOT LIMITED TO THE FOLLOWING: <br /> ACCORDANCE WITH ALL APPLICABLE SAFETY CODES. INSTALLATION.PROVIDE FINISHED CABINETS TO MATCH BUILDING STANDARD FOR FOR THE DISCOVERY,PRESENCE,HANDLING,REMOVAL OR DISPOSAL OF OR EXPOSURE OF A. FIREPROOF WOOD TEST REPORT(IF REQUIRED). <br /> 15.THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE BUILDING EXTINGUISHERS AT ALL EXPOSED LOCATIONS. PERSONS TO HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE, INCLUDING,BUT B. ELECTRICAL,PLUMBING&AIR CONDITIONING CERTIFICATES ISSUED BY: <br /> OWNER/ARCHITECTIENGINEER HARMLESS FOR INJURY OR DEATH TO PERSONS OR FOR 3.FIRE EXTINGUISHERS AND CABINETS SHOULD BE LOCATED SO THAT THE TOP OF THE NOT LIMITED TO ASBESTOS PRODUCTS,POLYCHLORINATED BIPHENYL(PCB)OR OTHER TOXIC -DEPARTMENT OF WATER SUPPLY,GAS&ELECTRICITY <br /> DAMAGE PROPERTY CAUSED BY THE NEGLIGENCE OF THE CONTRACTOR,HIS/HER AGENTS, EXTINGUISHER OR CABINET IS NO HIGHER THAN 48"AFF AND THE TOP OF THE SUBSTANCES. -BOARD OF FIRE UNDERWRITERS <br /> EMPLOYEES,OR SUBCONTRACTORS. EXTINGUISHER OR CABINET HANDLE IS AT LEAST 36"AFF. 9.THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,STANDARDS FORM OF <br /> 16.APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY 4.AT SEMI-RECESSED FIRE EXTINGUISHER CABINETS WRAP ADDITIONAL LAYER(S)OF TYPE THE AMERICAN INSTITUTE OF ARCHITECTS,CURRENT EDITION,SHALL APPLY TO ALL WORK IN <br /> WORKERS.ALL CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS 'X'GYPSUM WALL BOARD INTO THE CABINET CAVITY TO MAINTAIN SPECIFIED FIRE RATED THIS CONTRACT,EXCEPT AS SPECIFICALLY MODIFIED BELOW&IOR BY THE AGREEMENT. <br /> ALL REVISIONS,ADDENDA,AND CHANGE ORDERS.THE CONTRACTOR SHALL ALSO MAINTAIN REQUIREMENT.REFER TO WALL CONSTRUCTION LEGEND FOR ADDITIONAL INFORMATION. 10.PRIOR TO BEGINNING ANY WORK THE GENERAL CONTRP,CTOR SHALL FURNISH A <br /> IN GOOD CONDITION,ONE COMPLETE SET OF PLANS WITH ALL REVISIONS,ADDENDA,AND 5.PROVIDE AND INSTALL FIRE EXTINGUISHER SIGNAGE(5"X6")ABOVE EACH FIRE CONSTRUCTION SCHEDULE SHOWING THE CHRONOLOGICAL PHASE OF HISIHER WORK &ALL <br /> CHANGE ORDER,ON THE PREMISES AT ALL TIMES WHICH ARE TO BE UNDER THE CARE OF EXTINGUISHER OR CABINET CAVITY TO MAINTAIN SPECIFIED FIRE RATED REQUIREMENT. RELATED WORK FOR THE COMPLETION OF THE PROJECT.THIS SCHEDULE SHALL INDICATE <br /> THE JOB SUPERINTENDENT. REFER TO WALL CONSTRUCTION LEGEND FOR ADDITIONAL INFORMATION. ALL ORDERING LEAD TIMES,LENGTH OF TIME FOR EACH PHASE, ITS START&COMPLETION, <br /> 17.PROVIDE COMPLETE SECURITY OF THE TENANT SUITE WHILE JOB IS IN PROGRESS AND 6.EXIT SIGNS AND EXIT ILLUMINATION SHALL CONFORM TO THE 20151BC WITH WAC 51-50& WITH A PROJECTED COMPLETION DATE. <br /> UNTIL THE JOB IS COMPLETE. 2015/EBC WITN WAC 51-50AND EVERETT FIRE MARSHALL REQUIREMENTS.CONTRACTOR 11.ALL UNISPACE DRAWINGS&ALL CONSTRUCTION NOTES ARE COMPLEMENTARY,& WHAT IS <br /> 18.AT COMPLETION OF THE WORK,REMOVE ALL DEBRIS FROM THE SITE,LEAVING SPACE TO PROVIDE AND INSTALL EMERGENCY LIGHTING AND EXIT LIGHTING AS REQUIRED BY CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL.ANY WORK SHOWN OR <br /> CLEAN,WASH ALL WINDOWS AND GLASS,POLISH ALL HARDWARE AND FIXTURES.REPLACE THE EVERETT FIRE AND BUILDING DEPARTMENTS.CONFIRM ACCEPTABILITY OF REFERRED TO ON ANY ONE SET OF DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON <br /> AND PATCH AREAS OF CEILING DAMAGED DUE TO LIGHTING INSTALLATION OR MECHANICAL LOCATIONS WITH FIRE MARSHAL BEFORE INSTALLATION.CONTRACTOR SHALL PROVIDE ALL RELATED DRAWINGS. <br /> ADJUSTMENT. AND INSTALL AUDIBLE ALARMS IN ACCORDANCE WITH(201518C WITH WAC 51-50&2015 12.BEFORE SUBMITTING A PROPOSAL,ALL CONTRACTORS SHALL VISIT THE PREMISES, <br /> 19.MINIMIZE DISRUPTIONS OF BUILDING OCCUPANTS DUE TO NOISE,ODOR,FUMES,OR IEBC WITH WAC 51-50).CONTRACTOR SHALL PROVIDE AND INSTALL ALL SMOKE FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS&SATISFY THEMSELVES AS TO THE <br /> VIBRATION.AT THE END OF CONSTRUCTION THE CONTRACTOR SHALL COMPLETELY CLEAN DETECTORS AND SMOKE DETECTION AS REQUIRED UNDER CHAPTER 7 OF THE 20( 15IBC NATURE&SCOPE OF THE WORK&THE DIFFICULTIES THAT ATTEND TO ITS EXECUTION. THE <br /> ALL AREAS SOILED BY CONSTRUCTION ACTIVITIES INCLUDING THOSE IN WHICH NO WORK WITH WAC 51-50&2015/EBC W/TH WAC 51-50).THE INSTALLATION OF THE ABOVE NOTED SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT SUCH AN <br /> WAS DONE. SYSTEM SHALL INCLUDE THE CONNECTION TO ANDIOR MODIFICATION OF THE EXISTING EXAMINATION HAS BEEN MADE&LATER CLAIMS FOR LABOR,EQUIPMENT,OR MATERIAL <br /> 20.LATHING,PLASTER,AND GYPSUM WALL BOARD SYSTEMS SHALL CONFORM TO CHAPTER BUILDING SYSTEMS,AS NECESSARY. REQUIRED FOR DIFFICULTIES ENCOUNTERED,WHICH COULD HAVE BEEN FORESEEN HAD <br /> 25 OF THE INTERNATIONAL BUILDING CODE. 7.EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SUCH AN EXAMINATION BEEN MADE,WILL NOT BE RECOGNIZED. <br /> 21.ALL GLASS AND GLAZING SHALL COMPLY WITH THE(201518C WITH WAC 51-50&2015IEBC SPECIAL KNOWLEDGE OR EFFORT. 13.ALL CONTRACTORS SHALL CONTACT THE BUILDING MANAGEMENT TO DETERMINE THE <br /> WITH WAC 51-50) AND THE U.S.PRODUCT SAFETY COMMISSION:SAFETY STANDARDS FOR 8.FLAMMABLE LIQUIDS SHALL NOT BE PLACED,STORED,OR DISPENSED IN THIS RULES OF THE BUILDING OWNER FOR CONSTRUCTION TO DETERMINE WHEN&HOW <br /> ARCHITECTURAL GLAZING MATERIALS(42 FR 1426:16 CFR PART 1201). OCCUPANCY EXCEPT AS PROVIDED IN NFPA STANDARD 30 AND THE(2015 BC WITH WAC DELIVERIES CAN BE MADE(SEE BELOW),WHAT PHASES OF CONSTRUCTION CAN BE DONE <br /> 22.VERIFY ALL DOOR AND WINDOW ROUGH OPENING DIMENSIONS WITH DOOR AND WINDOW 51-50&20151EBC W1TH WAC 51-50).PERMIT MAY BE REQUIRED. ON REGULAR OR OVERTIME,&IN GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH <br /> MANUFACTURERS. 9.ALL DRAPES,HANGINGS,CURTAINS,AND ALL OTHER DECORATIVE MATERIALS THAT WILL AFFECT THEIR WORK(IF OVERTIME WORK IS REQUIRED BY ANY TRADE,APPROVAL <br /> 23.CONSTRUCTION WALLS PLUMB AND SQUARE WITH EXISTING STRUCTURE AND NEW WOULD TEND TO INCREASE THE FIRE AND PANIC HAZARD SHALL BE MADE FROM MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK INCLUDING COST).THE <br /> CONSTRUCTION UON. NONFLAMMABLE MATERIAL,OR SHALL BE TREATED AND MAINTAINED IN A FIRE GENERAL INTENT IS THAT ALL CONSTRUCTION WORK SHALL BE DONE ON REGULAR TIME <br /> 24.COORDINATION:THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE RETARDANT CONDITION BY MEANS OF A FLAME RETARDANT SOLUTIONS OR PROCESS EXCEPT NOISE GENERATING CONSTRUCTION. <br /> VERIFICATION AND COORDINATION OF THE WORK OF ALL TRADES TO ASSURE COMPLIANCE APPROVED BY THE FIRE MARSHAL.PROVIDE A CERTIFICATION TO THIS EFFECT. EXIT 14.THE GENERAL CONTRACTOR,HIS/HER SUBCONTRACTOR&ANY OTHER CONTRACTOR <br /> WITH THE DRAWINGS. DOORS,EXIT LIGHTS,AND FIRE EXTINGUISHER LOCATIONS SHALL NOT BE CONCEALED OR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR <br /> 25.ALL CONSTRUCTION AND DESIGN TO BE IN COMPLIANCE WITH UNISPACE DESIGN AND OBSTRUCTED BY ANY DECORATIVE MATERIAL.MINIMUM FLAME SPREAD CLASSIFICATION ILL-TIMED WORK AS A RESULT OF,BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR <br /> CONSTRUCTION GUIDELINES. OF INTERIOR FINISHES SHALL CONFORM TO THE(201518C WITH WAC 51-50&20151EBC MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY THE <br /> 26.REFER TO CLIENT'S BID FORMS AND EXECUTED CONTRACT FOR CONSTRUCTION FOR FULL WITH WAC 51-50). PARTY RESPONSIBLE THEREFORE. <br /> LIST OF CONTRACT DOCUMENTS. 10.ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY 15.THE USE OF THE WORDS"PROVIDE"OR"PROVIDED"IN CONNECTION WITH ANY 1TEM <br /> 27.THE DRAWINGS,CLIENTS STANDARD SPECIFICATIONS,AND ALL OTHER CONTRACT SHOWING THE SPECIFIC RATING. SPECIFIED IS INTENDED TO MEAN,UNLESS OTHERWISE NOTED,THAT WHICH SHALL BE <br /> DOCUMENTS ARE COMPLEMENTARY.WHERE CONFLICTS OR DIFFERENCES OCCUR FURNISHED&INSTALLED,&CONNECTED WHERE SO REQUIRED. <br /> CONTRACTOR SHALL BRING THEM TO THE ATTENTION OF UNISPACE DURING BID.WHERE 16.WHERE THE TERMS"APPROVED EQUAL","OTHER APPROVED","EQUAL TO", <br /> DIFFERENCES ARE NOT BROUGHT TO UNISPACE'S ATTENTION DURING BID,THE COSTLIER OR "ACCEPTABLE"OR THE OTHER GENERAL QUALIFYING TERMS ARE USED W THESE NOTES, IT ° � { �� <br /> MORE RESTRICTIVE SHALL BE DEEMED THE CONTRACT REQUIREMENT. SHALI BE UNDERSTOOD THAT REFERENCE IS MADE TO THE RULING&JUDGMENT OF �♦� � ' , ��- � � <br /> 28.THE CONTRACTOR SHALL NOTIFY UNISPACE OF ANY DISCREPANCIES BETWEEN THE UNISPACE. � � '��� � <br /> � .,�, �z .�,. <br /> CONSTRUCTION DOCUMENTS AND ANY FIELD CONDITIONS,WHICH MAY CAUSE DEVIATION <br /> FROM THE CONSTRUCTION DOCUMENTS,PRIOR TO SUBMITTING BIDS. <br /> ea�.��,��;':.•�r�b <br /> ST'����f�f�5;�i,"�'a i Ei;� <br /> ��� <br /> Stamp: <br /> STANDARD ABBREVIATIONS GENERAL SYMBOLS <br /> & -AND GA-GAUGE PERF-PERFORATED ��� f <br /> @ -AT GALV-GALVANIZED PERP-PERPENDICULAR PROJECT NORTH S�M REF. TYPE (IF APPLICABLE) <br /> � -CENTER LINE GB-GRAB BAR PL-PLATE TRUE NORTH g_22 DETAIL SECTION NUMBER <br /> # -POUND GC-GENERAL CONTRACTOR PLBG-PLUMSING ��Y e SHEET NUMBER <br /> ± -TOLERANCE DIMENSION GEN-GENERATOR PR-PAIR �^� <br /> AREA NOT IN CONTRACT GRID LINE NUMBER <br /> GFRC-GLASS FIBER REINFORCED CONCRETE PREFAB- PREFABRICATED i N.I.C. - - - �� <br /> A/E -ARCHITECT/ENGINEER GFRG-GLASS FIBER REINFORCED GYPSUM PT-PRESSURE TREATED <br /> ACT-ACOUSTIC CEILING TILE GL-GLASS PTD-PAINTED RM.NAME LEVEL NAME <br /> ADA-THE AMERICANS WITH DISABILITIES ACT GWB-GYPSUM WALL BOARD PVC-POLYVINYL CHLORIDE 101 ROOM NAME LEVEL 1 <br /> ADJ -ADJACENT 150 SF~ROOM/AREA NUMBER 12'-6" <br /> AFF-ABOVE FINISHED FLOOR HB-HOSE BIBB QTY-QUANTITY � AREA LEVEL ELEVATION <br /> AH -AIR HANDLER HC-HOLLOW CORE <br /> ALT-ALTERNATE HT-HEIGHT R-RADIUS OR(STAIR) RISERS �... Q REVISION NUMBER <br /> APPROX-APPROXIMATELY HM-HOLLOW METAL RAD- RADIATOR � � � S�M-�REF.TYPE (IF APPLICABLE) <br /> ARCH -ARCHITECT HO-HOLD OPEN RCP-REFLECTED CEILING PLAN � � 6_22 DETAIL REFERENCE NUMBER ��-HEIGHT ABOVE <br /> HORIZ-HORIZONTAL RD- ROOF DRAIN �V� DETAIL REFERENCE SHEET X�-X�� SLAB, UON <br /> BD- BOARD HP-HIGH POINT REF-REFERENCE AREA OF DETAIL <br /> BLDG- BUILDING HVAC-HEAT, VENTILATION &AIR CONDITIONING REFR-REFRIGERATOR �� ALIGN TO INDICATED <br /> BM-BEAM REINF-REINFORCED OR REINFORCING <br /> ID- INSIDE DIAMETER REQD- REQUIRED � S�M- REF. TYPE (IF APPLICABLE} SURFACES Rev DESCRIPTION DATE BY cHK <br /> CAB-CABINET IN - INCH OR INCHES RH -RIGHT HAND EXTERIOR ELEVATION NUMBER O SHEET-KEYNOTES Key Plan <br /> CG-CORNER GUARD INSUL- INSULATION RHR-RIGHT HAND REVERSE A1-101 <br /> CLG-CEILING INT- INTERIOR RM-ROOM SHEET NUMBER <br /> CLR-CLEAR RO-ROUGH OPENING � � CENTER LINE <br /> CMU -CONCRETE MASONRY UNIT JAN-JANITOR RWL-RAIN WATER LEADER � A2-222 ��ELEVATION NUMBER TYP. <br /> COL-COLUMN <br /> CONC-CONCRETE KD-KNOCKED DOWN SAFB-SOUND ATTENUATION FIBER BLANKET SHEET NUMBER <br /> CONF-CONFERENCE KO-KNOCKOUT SF-SQUARE FOOT OR FEET 1 <br /> CONT-CONTINUOUS SIM-SIMILAR <br /> CYL-CYLINDER L- LENGTH OR LEFT SK-SINK � S�M --REF. TYPE (IF APPLICABLE) <br /> LAB-LABORATORY SM-SMALL 6_2 SECTION NUMBER � <br /> DEMO-DEMOLITION LAM- LAMINATE SPEC-SPECIFICATIONS SHEET NUMBER <br /> DEPT-DEPARTMENT LAV-LAVATORY SQ-SQUARE �� <br /> DIA-DIAMETER LB-POUND ST-STREET <br /> DIM-DIMENSION LF-LINEAR FOOT OR FEET STC-SOUND TRANSMISSION CLASS Client/Project Name/Address: <br /> DISP-DISPENSER LH -LEFT HAND STD-STANDARD <br /> z <br /> DIV-DIVISION LHR-LEFT HAND REVERSE STG-STORAGE a <br /> DN -DOWN LIN-LINEAR STL-STEEL F Pod - Phase 2 � <br /> DWG-DRAWING LP-LOW POINT STN-STONE <br /> LTG-LIGHTING STR-STRUCTURAL 6920 SEAWAY BLVD W� <br /> J <br /> EA- EACH " <br /> EIFS-EXTERIOR INSULATION FINISH SYSTEM MACH-MACHINE T-TREADS (STAIRS) � <br /> EJ -EXPANSION JOINT MAX-MAXIMUM T&G-TONGUE AND GROOVE Z <br /> W <br /> U <br /> EL-ELEVATION MDF- MEDIUM DENSITY FIBERBOARD TBD-TO BE DETERMINED Drawing Title: o� <br /> 0 <br /> ELEC-ELECTRICAL MECH -MECHANICAL TEL-TELEPHONE a <br /> ELEV- ELEVATOR MFR-MANUFACTURER TEMP-TEMPORARY G E N E RAL N OT ES� m <br /> JI <br /> EMER- EMERGENCY MIN -MINIMUM TOFF-TOP OF FINISHED FLOOR <br /> ENGR- ENGINEER MIR- MIRROR T.O. -TOP OF SYM BOLS & ¢ <br /> EP-ELECTRICAL PANEL MISC-MISCE�LANEOUS TPO-THERMOPLASTIC-POLYOLEFIN ROOFING <br /> � <br /> EPDM-ETHYLENE PROPYLENE DIENE MONOMER MO-MASONRY OPENING TV-TELEVISION OR MONITOR ABB REVIATIONS W� <br /> EQ-EQUAL MTD-MOUNTED TYP-TYPICAL <br /> Y <br /> EQUIP-EQUIPMENT MTL-METAL <br /> � <br /> EX/EXIST- EXISTING UL-UNDERWRITERS LABORATORY <br /> Status: � <br /> EXH -EXHAUST N/A-NOT APPLICABLE UON -UNLESS OTHERWISE NOTED � <br /> NIC-NOT IN CONTRACT UPS-UNINTERRUPTIBLE POWER SUPPLY P E RM IT S ET � <br /> FA- FIRE ALARM NOM-NOMINAL UV-ULTRAVIOLET ° <br /> � <br /> FACP- FIRE ALARM CONTROL PANEL NTS-NOT TO SCALE `° <br /> Y <br /> FD- FLOOR DRAIN VAC-VACUUM Drawn By: IH/KSR Checked By: KSR N <br /> FDC-FIRE DEPARTMENT CONNECTION OA-OVERALL VCT-VINYL COMPOSITION TILE sca�e: 12"=1'-0" Date: 10/11/17 � <br /> _ U <br /> FE- FIRE EXTINGUISHER O.C. -ON CENTER VERT-VERTICAL Project Number:�EA'OOOO�O� N <br /> FEC-FIRE EXTINGUISHER CABINET OD-OUTSIDE DIAMETER VEST-VESTIBULE <br /> FHC-FIRE HOSE CABINET OFCI-OWNER FURNISHED/CONTRACTOR INSTALLED VIF-CONTRACTOR TO VERIFY IN FIELD <br /> N <br /> O <br /> OF01-OWNER FURNISHED/OWNER INSTALLED <br /> Drawinq Number: Revision: � <br /> 0 <br /> FIN -FINISH OPP-OPPOSITE W-WEST " <br /> FLR-FLOOR W/-WITH <br /> 0 <br /> FT-FOOT OR FEET W/0-WITHOUT <br /> 0 <br /> FTG-FOOTING WC-WATER CLOSET ~ <br /> Z <br /> FTR-FIN TUBE RADIATION WP-WORKING POINT '' ° a <br /> FURN- FURNITURE <br />