My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/10/02 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/10/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 9:51:29 AM
Creation date
10/22/2019 9:47:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Everett Stormwater Plan Review Support <br /> Scope of Work <br /> Otak Project 33174 <br /> Stormwater Plan Review Support <br /> The Scope of Work for the Stormwater Plan Review Support services may include,but is not necessarily <br /> limited to,the following tasks: <br /> • <br /> Project Management and Contract Administration <br /> The Consultant shall organize,manage and coordinate the disciplines required to accomplish the contract <br /> and shall perform multiple work orders concurrently. The Consultant shall coordinate its work with efforts <br /> performed by City staff and other consultants or contractors. The Consultant shall provide project <br /> management and contract administration services to facilitate efficient progress on each work order, <br /> including: <br /> • Project team management and coordination, including managing sub-consultants; <br /> ■ Meeting organization,facilitation and documentation <br /> ▪ Manage, monitor and prepare progress reports,schedules,scope and scope changes, of all work <br /> performed under this contract <br /> Review of Development Applications <br /> Perform plan review for development applications in the City of Everett including,but not limited to, <br /> preliminary subdivisions, SEPA,shoreline applications, and public works permits.The consultant will focus <br /> primarily on the stormwater elements,while other City review staff will be responsible for review of non- <br /> stormwater elements of the applications such as grading,erosion control,transportation,water,and <br /> sewer. <br /> Each development project with permit applications that is sent to the Consultant for review will be tracked <br /> separately but a separate scope and fee estimate will not be prepared prior to performing the work unless <br /> requested by the City. Each month a single invoice will be submitted for payment which includes a <br /> summary of costs incurred for each project reviewed and overall project monthly charges. <br /> The Consultant shall provide a variety of development review services,which may include, but not be <br /> limited to the following: <br /> E Review construction plans and supporting documents submitted to the City of Everett in <br /> conjunction with development applications for compliance with the City of Everett standards, codes, <br /> and specific requirements for development applications. Examples of the City of Everett standards <br /> and codes include Everett Municipal Code, City of Everett Design and Construction Standards& <br /> Specs, Standard Drawings, and current Ecology Stormwater Management Manual for Western <br /> Washington, and ordinances. <br /> • Provide geotechnical and hydrogeologic review of development plans and reports. <br /> City of Everett —Stormwater Plan Review Support 1 <br /> otak <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.