My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/10/23 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/10/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2019 9:22:37 AM
Creation date
10/24/2019 9:20:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. p <br /> N E V E R E T T City Council Agenda Item Cover Sheet <br /> Project title: <br /> Professional Services Agreement (PSA) for Coordination of SR07 and SR08 CSO Control and <br /> Sewer "0" Project <br /> . 4_ 4..•.•..••....•..:..'• ...••.: .I:::;tl!t:L:L;IIIIl:11�11;L1ittI1L1!I!Lt:i. <br /> Council Bill# Consideration: Professional Services Agreement <br /> • <br /> r-rn..,....t..,.....tnvv..,..,..nan«t?:vnv+n rcpt»::ar;:m:r•t,enarr.:,aettr;a.: <br /> Project: Coordination of SR07 and SR08 CSO Control and Sewer"0" Project <br /> Agenda dates requested: Partner/Supplier : BHC Consultants <br /> 10/23/2019 Location: Everett(Vicinity maps attached) <br /> Briefing Preceding action: N/A <br /> Proposed action Fund: Fund 401,WO#UP3731 <br /> Consent <br /> Action X • <br /> Ordinance <br /> Public hearing <br /> Yes X No Fiscal summary statement: <br /> Amount Budgeted: $200,000 <br /> Budget amendment: <br /> Yes X No Requested Amount: $177,138 WO#UP3731 <br /> PowerPoint presentation: Budget Remaining:$22,862 <br /> Yes X No <br /> Project summary statement: <br /> Attachments: <br /> Two separate planning and design efforts are in progress that involve combined <br /> None <br /> sewer infrastructure improvements for the purposes of reducing Combined <br /> Department(s)involved: Sewer Overflow(CSO) discharges at Snohomish River Outfalls (SRO)7 and 8 as <br /> Public Works well as eliminating chronic Sanitary Sewer Overflow (SSO) events at various <br /> locations generally south and east of downtown. Modeling efforts for Sewer"0" <br /> Contact person: <br /> project have determined that the proposed improvements would move the SSO <br /> Dave Voigt <br /> problem farther downstream and that additional system improvements are <br /> Phone number: necessary. <br /> 425-257-8983 <br /> This project performs hydraulic and hydrologic modeling to coordinate CSO <br /> Email: control measures associated with SROs 7 and 8 with the currently ongoing <br /> dvoigt@everettwa.gov Sewer"0" project that is addressing SSO problems. <br /> Summary of specific objectives are: <br /> • Control CSO discharges at SR07 and SR08 to meet regulatory <br /> requirements, <br /> Initialed by: • Eliminate SSOs in the vicinity of 36th Street and Smith Ave. <br /> • Identify where Green Stormwater Infrastructure (GSI) can be <br /> De ar�ment ead <br /> implemented to address climate change variability. <br /> • Modify existing regulator function/controls to improve performance. <br /> A ministr io, <br /> Recommendation (exact action requested of Council): <br /> Co ncil President <br /> Authorize the Mayor to sign the Professional Services Agreement with BHC <br /> Consultants for Coor2iation of SR07 and SR08 CSO Control and Sewer"0" <br /> Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.