Laserfiche WebLink
. • <br />•� . <br />�� V i�ieOiI�C�JIy7�LY�i ��SS��r /� <br />� ` 11001I0fAAowreN.6 <br />� Bd4o�r.116�atle006 <br />�� (!Oi)716d010 <br />28 October 1985 <br />8aryhausen Consulting Engineers� Inc. <br />6625 South 19Qth Street. Suite 102 <br />Kent. Washington 98031 <br />Attention: Mr. Dana Mower. Project Manager� <br />, <br />Subject: Subgrade Evaluation s <br />' Building Pad !!7 <br />Everett Mall Plaza <br />Gentlemen: <br />l'vl � V �-�+ <br />M-406F-3 <br />� <br />6 <br />RECEIVED <br />JAN 2 9 1986 <br />FF��S�a�lT �C HO AP�CE�ITECTS <br />In accordance with your request. we have performed an evaluation of the subgrade <br />for building pad !7 and the surrounding lot. We understand the site is being <br />considered for construction of a Monterey Jack Restaurant. The property in <br />question is located roughly 250 feet south of the Top Faods Market. and directly <br />north of Everett Mall Way. 7he parcel itself is irregular in shape, bounded by <br />ro��yhly 170 feet of entrance drivev+ay on the north and northeast. 125 feet of <br />gravel-paved easement between the site and Everett Mall Nay on the south. having <br />about 135 feet of common border with building lot 96 on the southwest and west. <br />Ouriny the fall of 1983. we observed mass yrading of the Everett Mall Flaza site. <br />In general. mass yrading consisted of cutting on Lhe east side of the plaza site <br />and filliny on the west side of the :site. At the location of building pad i7. <br />mass yradiny consisted of cutting down by approximately 5 to 6 feet below site <br />grade. to roughly elevation 614 to 616 feet (City o'f Everett Datum). The soils <br />ettposed in the cut areas were very dense, s11ty. gravelly sand (glacial till). <br />Based on conversations with Mr. Steve Miller of Bakke Enterprises. Inc.. some on- <br />site (glacial till) fill was subsequently placed above the cut area to establish <br />a level pad at finished-floor eievation 615.66 feet. Other earthwork activities <br />on the parcel reportedly consisted of installation of a storm sewer line atong <br />the west slde of the lot. wlth a'stub" running to the building pad from a catch <br />