Harmon 8 Associates W-4545 ti <br />15 April 1985 Page 5 <br />southwest building. <br />experience ongoing <br />Steeper yradients <br />movements. . <br />Utilities constructed above the peat. if left in piace. may <br />settlement due to the organic nature of the peat soils. <br />nay be appropriate to accomr.iodate these potential future <br />Moreover. excavations to remove the total volume of fill and peat in the <br />southwest portion of the s�te would likely extend some distance below the yround <br />water table. If some future settlement can"be tolerated in parking areas, and <br />site grades are not raised significantly� the existing till and peat may be left <br />in place� with remedial efforts as outlined subsequently. <br />Any organic-rich•materials should be either wasted or utilized as topsoil or non- <br />structural fill. Materials free of organics may be stockpiled for later use as <br />struttural fill. Note that the silt-rich soils characteristic of this site are <br />moisture-sensitiv� and may require drying to optimum moisure before use as <br />structural fill. '- — • <br />Following completion of all earth removal the site should be prerolled with a <br />vibratory compactor. Any wet. yielding, or pumping areas should be excavated and <br />backfilled with a"structural fili" as outlined in Section 5.2 of this report. <br />.Alternatively, a nan-sensitive imported material� such as washed rock or quarry <br />spalls, may be used in place of structural fill. <br />Considering the moisture-sensitive nature of the site soils� care should be taken <br />to minimize disturbance of bearing soils due to equipment or foot traffic. <br />especialiy during wet weather conditions. Appropriate measures may include <br />shutting down earthwork activities when the site is wet, or designating specific <br />areas as haul-road and staging areas, and protecting these areas with quarry <br />spalls or similar materials. <br />5.2 Structural Fill . <br />All fill placed in building or pavement area should be placed in accardance with <br />the recommendations for "structural fiil'. Prior to placement of ::tructural ljp7 <br />