My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 SE EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1505
>
Geotech Report
>
1505 SE EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:49:06 AM
Creation date
10/24/2019 11:46:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1505
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harmon 8 Associates W-4545 ti <br />15 April 1985 Page 5 <br />southwest building. <br />experience ongoing <br />Steeper yradients <br />movements. . <br />Utilities constructed above the peat. if left in piace. may <br />settlement due to the organic nature of the peat soils. <br />nay be appropriate to accomr.iodate these potential future <br />Moreover. excavations to remove the total volume of fill and peat in the <br />southwest portion of the s�te would likely extend some distance below the yround <br />water table. If some future settlement can"be tolerated in parking areas, and <br />site grades are not raised significantly� the existing till and peat may be left <br />in place� with remedial efforts as outlined subsequently. <br />Any organic-rich•materials should be either wasted or utilized as topsoil or non- <br />structural fill. Materials free of organics may be stockpiled for later use as <br />struttural fill. Note that the silt-rich soils characteristic of this site are <br />moisture-sensitiv� and may require drying to optimum moisure before use as <br />structural fill. '- — • <br />Following completion of all earth removal the site should be prerolled with a <br />vibratory compactor. Any wet. yielding, or pumping areas should be excavated and <br />backfilled with a"structural fili" as outlined in Section 5.2 of this report. <br />.Alternatively, a nan-sensitive imported material� such as washed rock or quarry <br />spalls, may be used in place of structural fill. <br />Considering the moisture-sensitive nature of the site soils� care should be taken <br />to minimize disturbance of bearing soils due to equipment or foot traffic. <br />especialiy during wet weather conditions. Appropriate measures may include <br />shutting down earthwork activities when the site is wet, or designating specific <br />areas as haul-road and staging areas, and protecting these areas with quarry <br />spalls or similar materials. <br />5.2 Structural Fill . <br />All fill placed in building or pavement area should be placed in accardance with <br />the recommendations for "structural fiil'. Prior to placement of ::tructural ljp7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.