Laserfiche WebLink
Seattle,Washington <br /> 11) www.pacland.com <br /> , 2T 06 522 9510 <br /> TURNING VISIONS INTO REALITY <br /> Table of Contents <br /> Section Page <br /> I. PROJECT DESCRIPTION 4 <br /> PROPOSED IMPROVEMENTS 4 <br /> PROJECT LOCATION 4 <br /> MINIMUM REQUIREMENTS 5 <br /> II. SITE ASSESSMENT 7 <br /> TOPOGRAPHY 7 <br /> DRAINAGE 8 <br /> SOILS 8 <br /> GROUND COVER 8 <br /> CRITICAL AREAS 8 <br /> ADJACENT AREAS 8 <br /> III. SITE DEVELOPMENT PLAN W/ON-SITE STORMWATER MANAGEMENT 9 <br /> IV. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN 12 <br /> EROSION CONTROL RISK ASSESSMENT 12 <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN(C-SWPPP) 12 <br /> CONSTRUCTION SEQUENCE AND PROCEDURE 13 <br /> V. SOURCE CONTROL PLAN 14 <br /> VI. SPECIAL REPORTS AND/OR STUDIES 16 <br /> VII. OTHER PERMITS 17 <br /> VIII. PERMANENT STORMWATER CONTROL PLAN 17 <br /> A. OFF-SITE ANALYSIS 17 <br /> B. PRE-REDEVELOPED HYDROLOGY 18 <br /> Table 1 —Pre-Redeveloped/Existing Conditions 19 <br /> Table 2—Pre-Redeveloped/Existing Flow Rates 19 <br /> C. REDEVELOPED HYDROLOGY 19 <br /> Table 3—Proposed Conditions 19 <br /> Table 4—Proposed Flow Rates.... 20 <br /> D. STORMWATER FLOW CONTROL PLAN 20 <br /> Table 5—Existing Flow Control Structure Information 21 <br /> Table 6—Existing Detention Pipe Information 21 <br /> E. STORMWATER TREATMENT PLAN 22 <br /> Table 7—Stormwater Treatment Facility Information 23 <br /> Table 8—Equivalent Treatment Areas 23 <br /> F. CONVEYANCE ANALYSIS 24 <br /> G. OPERATION AND MAINTENANCE PLAN 25 <br /> APPENDIX A-FIGURES 27 <br /> FIGURE 1 —VICINITY MAP 28 <br /> FIGURE 2—EXISTING BASIN MAP _ 29 <br /> FIGURE 4—PROPOSED CONDITIONS MAP 31 <br /> FIGURE 5—GRADING AND DRAINAGE PLAN 32 <br /> FIGURE 6—SITE PLAN 33 <br /> FIGURE 7—SOURCE CONTROL ACTIVITY WORKSHEET 34 <br /> APPENDIX B-CONVEYANCE ANALYSIS CALCULATIONS 37 <br /> RATIONAL METHOD CALCULATIONS 38 <br /> CATCH BASIN SUB-BASIN TABLE 38 <br /> RATIONAL METHOD SUMMATION OF CATCH BASIN SUB-BASINS TABLE 39 <br /> MANNING'S FORMULA PIPE FLOW CALCULATION 40 <br /> CATCH BASIN SUB-BASIN MAP 41 <br /> APPENDIX C—STORMWATER FLOW CONTROL—SUPPLEMENTAL INFORMATION 42 <br /> Everett Mall Plaza Parcel Ill Retail Expansion Stormwater Site Plan — Page 2 <br />