Laserfiche WebLink
Energy Cost Budget / PRM Summary <br />By Paul C. Parks Engineering Inc. <br />Projecl Name: Wal•Mart 1t 3053 Date: September 12, 2013 <br />Ciy: Everetl, WA Wealher Data: Fairchild AFB. Washinpton <br />Note: The percentage disployed lor Ihe "Propasedl8ase%' <br />coiumn ol lhe base case is a:lually t:�e percenlage of the <br />total energy consumption. <br />' Denotes lhe base altemative for Ihe ECB study. <br />• Lighting - CondlUoned <br />Llghting - Uncondilloned <br />SD��e Heating <br />Spa�e Cooling <br />Heat ReJeatlon <br />Fans - Condltloned <br />SUndalone Base Utilities <br />• <br />Electriciry <br />ElecMciry <br />Gas <br />Electntiry <br />Eleclriciry <br />Eleclricity <br />Gas <br />Other <br />ToWI Bui�ding Consumption <br />Total <br />Number of hours heating load not met <br />Number of houro cooling load not met <br />Eleclrlely <br />Gas <br />Other <br />Total <br />� __' <br />��_' __-- <br />' Pro�ecl Name: Wal'Mart k 3053 <br />' DalasetName: ECBI.TRC <br />• Alt Y Wal-Mart <br />Proposed <br />Energy 19ase Peak <br />10"6 BtWy� % kBluh <br />2,180.? 41 324 <br />85.6 2 10 <br />2,939.5 55 9fi7 <br />19fi.4 4 i66 <br />48.6 7 37 <br />779.2 9 20 <br />223.7 4 26 <br />-525.6 -70 �0 <br />5,328.0 <br />' AM-7 Wal-0Nart <br />1.649 <br />0 <br />• All•1 Wal�+tart <br />Energy Costtyr <br />70"6 Btufyr Slyt <br />2,690.9 69,060 <br />3,163.2 26,729 <br />-525.6 0 <br />_ 6,728- —'.' 89.790"" <br />AR-2 <br />Proposed <br />Energy I Base Peak <br />10"6 BtWyr % NBtuh <br />3,283.9 151 488 <br />129.0 151 75 <br />2,95fi.4 80 807 <br />421.4 215 226 <br />84.9 174 43 <br />212.7 119 24 <br />223.7 700 26 <br />525.6 0 60 <br />�,237.7 <br />Alt-2 <br />1,778 <br />0 <br />Ak-2 <br />Energy CosNyr <br />70"6 Bturyr Slyr <br />4,192.0 96,852 <br />2,580.1 21,802 <br />525.6 0 <br />7,238 . . 'H8,654 <br />i <br />\� <br />TRACE� 700 v6.2.9 wlculated a� 12:23 PM on 09I722013 <br />Energy Cost Budget Repon Page 1 of t <br />