Laserfiche WebLink
Seattle,Washington <br /> = = , , www.pacland.com <br /> ■! T 206.522.9510 <br /> TURNING VISIONS INTORERLITY <br /> To assist the owner a maintenance activity log is included in Appendix E of this <br /> Stormwater Site Plan and should be combined with this section of the stormwater site plan <br /> to comprise the O&M Plan. Blank copies of the maintenance activity log and checklists <br /> should be included in the O&M Plan binder for the maintenance personnel to reference. <br /> Facility Inspection and Maintenance Checklists <br /> See Appendix E of this Stormwater Site Plan for detailed checklists for all onsite facilities. <br /> The schedule to complete a checklist for a storm system component is as follows and <br /> based on the checklists: <br /> (M) Monthly from October through April. <br /> (A) Once in late summer (preferably September). <br /> (S) After any major storm (use 1 inch in 24 hours as a guideline). <br /> Photocopies of the checklists shall be used and checked off for the problems looked for <br /> each time an inspection is completed. Comments on problems found and actions taken <br /> shall be noted. Some items do not need to be looked at every time an inspection is done. <br /> The suggested frequency at the left of each item (as defined above) shall be used as a <br /> guideline for inspections. <br /> The "checked" sheets shall be kept by the property owner and made available to the City <br /> upon request. <br /> I <br /> I <br /> Everett Mall Plaza Parcel III Retail Expansion Stormwater Site Plan Page 26 <br />