Laserfiche WebLink
STORMWATER COMPLIANCE OPERATIONS INSPECTION REPORT <br /> This inspection report must be ton'fpfeted by the contractor"each time storrnwater systerri inspection and rnainten ante is <br /> performed. Acopy'ofthis report be left atthestore and another copy is to be attached trs"the cornptetidn.reoats submitted <br /> to Building Owner's Corporate"offiee. <br /> Building.QWne r: Street Address: <br /> City/State: <br /> Arrival Date: Arrival Time: <br /> Departure Date: Departure Time: <br /> Contractor: Vendor"Number: <br /> Weather: Date of Last Rainfall': Amount: Inches <br /> Category: Routine Maintenance Repair Emergency Response/Other <br /> Activities Performed''mark all that annit <br /> Mowing Trash./Debris"Removal Structure Cleaning <br /> Erosion Repair Sediment Removal Algae Treatment <br /> Jet-Vac Service Sump pump Nuisance Vegetation <br /> Gatch Basin Structure Repair <br /> Truck Well Other: <br /> Emergency Service <br /> Mark all applicable areas with ''X"and give brief <br /> description of quantity/location <br /> Vegetation Height Coverage(Good/Adequate/Sparse) <br /> Trash/Debris (Excessive/Moderate/Minimal) <br /> 4#Bags Bag Size <br /> Sediment <br /> Accumulation (Excessive/Moderate/Minimal) <br /> 4#Bags Bag Size <br /> Woody <br /> -Growth/Nuisance <br /> _Rip Rap Displaced Location <br /> Con tin ued on page 2 <br /> Everett Mall Plaza Parcel Ill Retail Expansion Stormwater Site Plan Page 73 <br />