My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4102
>
Ordinances
>
Ordinance 4102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 9:44:48 AM
Creation date
10/29/2019 9:44:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4102
Date
8/25/1965
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Norton Ave. from 22nd St . to Alverson Blvd. , by widening the pavement <br /> 22nd St. and Norton Ave. (bridge) , by constructing a parallel structure <br /> with two additional lanes <br /> Norton Ave. from 25th St. to 22nd St. , by widening the pavement <br /> 10th St . from Rucker Ave. to the Pacific Highway, by widening the <br /> pavement <br /> Colby Ave. from 19th St . to 10th St. , by widening the pavement <br /> Colby Ave . by constructing a pedestrian separation at the High School <br /> Colby Ave. from 41st St. to 35th St. , by widening the pavement and <br /> providing channelization <br /> 16th St. from Rucker Ave. to Rockefeller Ave. , by widening the pavement <br /> East Grand Ave. from Walnut St. to 23rd St . , by construction, widening <br /> and paving <br /> Summit Ave . Extension from 19th St. to East Grand Ave . , by construction, <br /> widening and paving <br /> 19th St. from Walnut St. to Summit Ave . , by widening and paving <br /> 23rd St. from Rucker Ave. to East Grand Ave. , by widening and paving <br /> Rucker Ave. from California St. to 26th St. , by widening the pavement <br /> and providing channelization <br /> Rucker Ave . from 41st St. to Pacific Ave. , by widening the pavement <br /> and providing channelization <br /> Rucker Ave . , by constructing a pedestrian overpass at 35th St. <br /> Everett Ave. from Norton Ave. to Broadway, by widening the pavement <br /> and providing channelization <br /> Federal Ave . Extension from Weyerhaeuser Mill to California St . , by <br /> construction, widening and paving <br /> Maple St . from Pacific Ave. to Hewitt Ave. , by widening the pavement <br /> Pacific Ave. Extension from Maple St . to Hewitt Ave. , by construction, <br /> widening, paving and providing channelization <br /> 35th St . from Federal Ave. to Rucker Ave. , by widening the pavement <br /> 52nd St . from Colby Ave. to the Broadway Cutoff, by widening the <br /> pavement <br /> Lowell—Larimer Corner Rd. from Ravenna St. to the South City Limit, <br /> by widening the pavement <br /> 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.