4 of 41 <br /> PROJECT NO. SHEET NO. <br /> r S190702-1 <br /> PROJECT 133 E Beech St, Everett, WA <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY CMH DATE 07/09/2019 <br /> GENERAL NOTES-HELICAL PILES <br /> 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING <br /> CODE(IBC). <br /> 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY RAM JACK AND SHALL BE IN CONFORMANCE WITH <br /> ESR-1854. <br /> 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN CONFORMANCE WITH ESR-1854. <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR <br /> CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA)COATINGS(AC228). <br /> 5. DIMENSIONS OF THE CENTRAL SHAFT AND THE NUMBER,SIZE,SPACING AND THICKNESS OF THE HELICAL BEARING <br /> PLATES SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. <br /> 6. ONLY ROUND CENTRAL PILE SHAFTS WILL BE ALLOWED. <br /> 7. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION OF <br /> 1 DEGREE PER SECTION 5.7 OF ESR-1854. <br /> 8. MINIMUM AND MAXIMUM INSTALLATION TORQUES SHALL BE SPECIFIED BY THE HELICAL PILE MANUFACTURER.THE <br /> MINIMUM INSTALLATION TORQUE SHALL BE HIGH ENOUGH TO ACHIEVE THE REQUIRED BEARING CAPACITY, INCLUDING <br /> A SAFETY FACTOR OF 2.THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL <br /> CAPACITY OF THE PILE SHAFTS. <br /> 9. ALL BRACKETS AND PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE MINIMUM <br /> REQUIRED BEARING CAPACITY, INCLUDING A SAFETY FACTOR OF 2. <br /> 10. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED TO RESIST ALL STRESSES INDUCED BY INSTALLATION. <br /> 11. EXISTING CONDITIONS AND UNDERGROUND OBSTRUCTIONS SHALL BE CONFIRMED BY THE PILE INSTALLER. PROBING <br /> OR SCANNING MAY BE NECESSARY TO LOCATE UNDERGROUND OBSTRUCTIONS. REPORT ANY UNFORESEEN <br /> OBSTRUCTIONS TO THE STRUCTURAL ENGINEER. <br /> 12. LOCATIONS OF PILES SHALL NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER. <br /> 13. SPECIAL INSPECTION OF THE HELICAL PILE INSTALLATION SHALL BE PERFORMED CONTINUOUSLY BY A <br /> GEOTECHNICAL SPECIAL INSPECTOR IN ACCORDANCE WITH SECTION 1705.9 OF THE 2015 IBC UNLESS EXCEPTIONS <br /> NOTED IN SECTION 1704.2 OF IBC ARE MET.THE GEOTECHNICAL SPECIAL INSPECTOR IS REQUIRED TO BE <br /> CONTINUOUSLY PRESENT DURING HELICAL PILE INSTALLATION AND LOAD TESTING.THE INSPECTOR SHALL RECORD <br /> THE FOLLOWING: <br /> A. INSTALLATION DATE. <br /> B. PILE MANUFACTURER. <br /> C. INSTALLATION CONTRACTOR. <br /> D. IDENTIFICATION OF INSTALLATION EQUIPMENT. <br /> E. MINIMUM ALLOWABLE INSTALLATION TORQUE. <br /> F. MAXIMUM ALLOWABLE INSTALLATION TORQUE. <br /> G. CENTRAL SHAFT DIAMETER OF EACH PILE. <br /> H. HELIX PLATE CONFIGURATION OF EACH PILE. <br /> I. ACTUAL TIP EMBEDMENT OF EACH PILE. <br /> J. ACTUAL INSTALLATION TORQUE OF EACH PILE. <br /> K. ULTIMATE CAPACITY OF EACH PILE AS SPECIFED BY MANUFACTURER. <br /> L. ALLOWABLE CAPACITY OF EACH PILE AS SPECIFIED BY MANUFACTURER. <br /> HELICAL PILE PROOF TESTING <br /> PROOF TESTING OF AT LEAST TWENTY PERCENT OF THE HELICAL PIERS IN SIX(6) EQUAL INCREMENTS UP TO 200 <br /> PERCENT OF THE DESIGN LOAD IS REQUIRED. EACH LOAD INCREMENT UP TO THE 200 PERCENT DESIGN LOAD SHOULD BE <br /> HELD FOR FIVE(5) MINUTES AND THE VERTICAL STRAIN MONITORED. IF THE TOTAL STRAIN BETWEEN 1 AND 5 MINUTES IS <br /> LESS THAN 0.04 INCHES,THE HELICAL PIER MAY BE CONSIDERED ACCEPTABLE. IF THE RECORDED STRAIN EXCEEDS 0.04 <br /> INCHES,THE HELICAL PIER SHOULD EITHER BE DEEPENED AND RETESTED OR ABANDONED AND A NEW HELICAL PIER <br /> SHALL BE INSTALLED AND TESTED. 1 <br /> L120 ENGINEERING&DESIGN <br />