Laserfiche WebLink
i <br /> A ..29.6... , . :.; ;:. :;,. , : : ::...:.::: ....:. <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to (b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item(a)-(ii, iii,or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> ✓Q (a) Electrical plan review is not required for: <br /> ❑✓ (i)Low voltage systems; <br /> t--❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> 1--/ (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> ■ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5%or less. <br /> L-1 (vi)Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vii) For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are,providing both before and after panel schedules as needed;and <br /> (D) Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> r- (b) Electrical plan review is required for all other new or altered electrical projects in educational,institutional,or health care <br /> occupancies defined in this chapter. <br /> 7 (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 Table 900-2 <br /> Health or Persona!Care Facilities Educational and Institutional Facilities,Places of Assembly,or Other Facilities <br /> Health or Personal Care Facility Plan Review <br /> Type Required Educational,Institutional,or Plan Review <br /> hospital Yes Other Facility Types Required <br /> Nursing home unit or long-term Yes Educational Yes <br /> care unit institutional Yes <br /> Boarding home Yes <br /> Assisted living facility Yes <br /> Private alcoholism hospital Yes Notes to Tables 900-1 and 900-2. <br /> Private psychiatric hospital Yes 1.A city authorized to do electrical inspections <br /> maternity home Yes may require plan review on facultytypes not <br /> Ambulatory surgery facility yes reviewed by the department <br /> Rena:hemodlsiyais clinic Yes <br /> Residential treatment facility Yes <br /> Enhanced service facility Yes <br /> Adult residential rehabilitation Yes PERMIT# <br /> center Page 2-Plan Review <br />