My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2714 COLBY AVE 2019-11-01
>
Address Records
>
COLBY AVE
>
2714
>
2714 COLBY AVE 2019-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 7:27:13 AM
Creation date
11/1/2019 7:25:56 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2714
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prescriptive Path, pg. 2 ENV-PRESCRIPTIVE <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: JEKO,LLC Date 03/21/2018 <br /> Fenestration Area as%gross above-grade wall area Max.Target: 30.0% For Building Department Use <br /> Skylight Area as%gross roof area Max.Target: 3.0% <br /> If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1,then the project must comply <br /> via Component Performance and provide ENV-UA and ENV-SHGC forms. <br /> BuildingComponent R-Value Method for U-Factor/F-Factor Method for <br /> ponenPrescriptive Compliance Prescriptive Compliance <br /> Perim. Ins. Full Slab CI <br /> Provide plan/detail#of assembly and description R-Value R-Value F-Factor F-Factor Source10 <br /> WHERE SLAB REMOVED AND REPLACED R10 <br /> 0 10 <br /> a a1 <br /> @ L <br /> � C <br /> O <br /> f6 <br /> U) � <br /> Ins. Assembly <br /> Provide ID from door schedule and description R-Value U-Factor U-Factor Source11 <br /> c1 TWO STOREFRONT DOORS 0.600 <br /> o c <br /> O .3 <br /> Q <br /> @• N <br /> ca- L <br /> O 5 <br /> Solar Heat Gain Coefficient(SHGC) U-Factor for Prescriptive Compliance <br /> Protection Orientation <br /> Factor(PF) (N or Assembly Assembly <br /> Provide ID from window schedule and description if applicable12 SEW)13 SHGC14 U-Factor U-Factor Source14 <br /> m <br /> 2 <br /> 0 <br /> Z <br /> • 9 ALUMINUM STOREFRONT SEW 0.35 0.38 <br /> .x <br /> N <br /> m Ts <br /> c 7 <br /> CO <br /> • 0 <br /> r <br /> TI <br /> 2 <br /> C <br /> 2 <br /> a <br /> .2 a <br /> T F <br /> Y = <br /> V) Q <br /> Note 1-Insulation that is continuous except for fasteners may be entered here if the cross-sectional area of metal penetration through otherwise <br /> continuous insulation is less than 0.12%. <br /> Note 2-Alternate prescriptive continuous insulation R-values per Table C402.1.4,Footnote F may be used if the cross sectional area of metal <br /> penetrations exceeds 0.04%but is less than 0.12%.Calculations are required to use these alternate R-values. <br /> Note 3-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. Specify the <br /> table number or calculation page number. <br /> Note 4-Thermal spacer blocking and liner system are required for prescriptive R-Value compliance in metal building roof assemblies. <br /> Note 5-Intermediate framing is required for prescriptive R-Value compliance in wood-framed wall assemblies. <br /> Note 6-Proposed CMU mass walls in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target prescriptive <br /> U-value of 0.104. <br /> Note 7-Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br /> Note 8-Refer to Table C402.1.3,Footnote E for prescriptive R-Value requirement for steel floor joist assemblies. <br /> Note 9 -Prescriptive slab-on-grade insulation shall extend from top of slab to minimum length per an approved method as defined in C402.2.6. <br /> Note 10-Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 11-Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.A door is defined as <br /> opaque if less than 50%of the door area has glazing. <br /> Note 12-Refer to Equation C4-6 Projection Factor Calculation. <br /> Note 13-N=Oriented within 45 degrees of true north, SEW=All other orientations. <br /> Note 14-Fenestration assembly U-Factor and SHGC shall be the manufacturer's NFRC product rating, which includes the glazing and frame,or <br /> shall be the default value per Section C303.1.3. <br /> Note 15-List all above-grade Group R mass walls and steel frame walls in Group R Walls section. List commercial above grade walls and all oth�r<- <br /> Group R above grade walls in Opaque Walls-Above Grade. /?- <br />
The URL can be used to link to this page
Your browser does not support the video tag.