Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 10/23/2019 14:52 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 9/17/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 19 3 <br /> Title CONVERT.75 INCH 1630 PUGET DR UT3473-19-3 <br /> Work Order No 20192320 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 9/17/2019 Time 07:33 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0785Z011 WASRVC YES 9/19/2019 <br /> Address 1630 PUGET DR <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 1630 PUGET DRIVE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 16.169 09/23/2019 PM <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.229 09/23/2019 PM <br /> M ELLO34104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.958 09/23/2019 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 208.128 09/23/2019 PM <br /> M NIPP34131247 NIPPLE 3/4 NPT X CLOSE BRASS 1 1.4 09/23/2019 PM <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 1.029 09/23/2019 PM <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 2 129.738 09/23/2019 PM <br /> Total Material Cost $435.66 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 09/23/2019 <br /> NA N/A TOPSOIL .13 3.851 09/23/2019 <br /> Total NA Cost $10.26 <br /> Total Cost $445.92 <br />