My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1028 13TH ST 2019-11-01
>
Address Records
>
13TH ST
>
1028
>
1028 13TH ST 2019-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 2:33:19 PM
Creation date
11/1/2019 2:33:08 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1028
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1, 1 %-6 Df7 <br /> PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $6798.00 Service Order# <br /> Contact Person Omar Lee Telephone# 425 251-1600 <br /> Requested By Sabrina Fandler Date of Request 4-6-2018 <br /> Property Owner(name) Water Place Hotel LLC <br /> Charge Cost to(name if different than owner) Omar Lee <br /> Address 18230 E Valley Hwy Suite 195 City Kent, WA Zip 98032 <br /> Installation Location 1028 13th St <br /> Installation type/description/size/etc. Install 4" Neptune meter in contractor installed piped through <br /> vault after purity. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $5002.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $1270.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $200.00 Paul McKee <br /> Tax $326.00 Jim Spooner <br /> Sabrina Fandler <br /> Restoration Benyam Stephanos <br /> TOTAL $6798.00 <br /> Prepared by: Jim Spooner Date Estimate Prepared 4-13-2018 <br /> Accepted by: 4i* Representingi " 7&- /rc - C <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2018\ <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.