My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:09 AM
Creation date
11/4/2019 9:16:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001465
Total Compensation
$8,607.07
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 11/7/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: N. Broadway Transit Improvement Project <br /> Change Order No. 1 <br /> Change Order Effective Date: March 15,2019 <br /> Exhibit A—Description of Changed Work: <br /> Change Order No. 1 Modifies 1 bid item and adds 1 new item to the contract as stated below: <br /> Revised Existing Bid Item <br /> Bid Item 22-Cement Concrete Driveway Ramp Type 1. Modify bid item 22 entitled"Cement <br /> Concrete Driveway Type 1",to decrease the contract value at unit price of$116.00 per SY,by <br /> removing 70 SY,resulting in an$8,120.00 decrease to the contact. <br /> Added Bid Items <br /> New Item 118–Cement Concrete Paving. Add new item 118 entitled,"Cement Concrete Paving"at <br /> the agreed to unit price of$202.29 per SY, by adding 83 SY, resulting in an$16,790.07 increase to the <br /> Contract price. <br /> Cost Summary <br /> The net result of the modification of the existing bid item and addition of the new item increases the <br /> contract value by$8,670.07 <br /> Exhibit B-- Justification: <br /> Bid Item 22-Cement Concrete Driveway Ramp Type 1. The installed quantity of"Cement <br /> Concrete Driveway Type 1"under-ran the estimated quantity <br /> New Item; 118 Cement Concrete Pavement. "Cement Concrete Pavement" is added work required <br /> to replace existing roadway in kind as required to complete under-ground utility work. <br /> Exhibit C—Additional Contract Time: <br /> There are 3 additional working days added for this change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.