My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 10/22/2019 Change Order 2
>
Contracts
>
Capital Contract
>
Stellar J Corporation 10/22/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:24:47 AM
Creation date
11/4/2019 9:24:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001332
Total Compensation
$24,956.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/24/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Process Water Pump Station <br /> Change Order No.2 <br /> Change Order Effective Date: October 2, 2019 <br /> CONTRACTOR <br /> D 4-/ <br /> By POfficer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 2 adds one(1)new item to the Contract as shown below. <br /> Added Item <br /> New Item#5—Power Quality Metering for Load Monitoring. Add new item #5 entitled, "Power <br /> Quality Metering for Load Monitoring"at the agreed to lump sum price of$24,956.00 by adding One <br /> (1)to the Contract, resulting in a$24,956.00 increase to the Contract price. This price includes meter <br /> to monitor 5 VFD's with Fluke Power Quality Meters and one full day of monitoring. <br /> JUSTIFICATION <br /> New Item#5—Power Quality Metering for Load Monitoring. Two existing VFDs had voltage <br /> relays that were tripping when started up, so this was purchased in order to diagnose the relay tripping <br /> problem and to get a baseline on the new VFDs. <br /> Total Cost of Change Order No. 2: $24,956.00. <br /> Contract Time: There will he calendar days added to the Contract in a future change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.