Laserfiche WebLink
Project: Process Water Pump Station <br /> Change Order No.2 <br /> Change Order Effective Date: October 2, 2019 <br /> CONTRACTOR <br /> D 4-/ <br /> By POfficer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 2 adds one(1)new item to the Contract as shown below. <br /> Added Item <br /> New Item#5—Power Quality Metering for Load Monitoring. Add new item #5 entitled, "Power <br /> Quality Metering for Load Monitoring"at the agreed to lump sum price of$24,956.00 by adding One <br /> (1)to the Contract, resulting in a$24,956.00 increase to the Contract price. This price includes meter <br /> to monitor 5 VFD's with Fluke Power Quality Meters and one full day of monitoring. <br /> JUSTIFICATION <br /> New Item#5—Power Quality Metering for Load Monitoring. Two existing VFDs had voltage <br /> relays that were tripping when started up, so this was purchased in order to diagnose the relay tripping <br /> problem and to get a baseline on the new VFDs. <br /> Total Cost of Change Order No. 2: $24,956.00. <br /> Contract Time: There will he calendar days added to the Contract in a future change order. <br /> Page 3 of 3 <br />