My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 14
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:36:38 AM
Creation date
11/4/2019 9:35:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
14
Tracking Number
0000801
Total Compensation
$26,495.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> ICI CONSTRUCTION <br /> INC. <br /> August 02, 2019 COP 018 <br /> Ken Kettel, P.E.,Resident Engineer <br /> KBA /City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 018: Handrail Revisions per RFP 05 <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to provide pricing for changes to Bid Item B025 as directed by the Engineer per RFP <br /> 005. <br /> The Engineer wishes to delete Bid Item B025 and create a new bid item for 500 LF of similar <br /> handrail constructed of different materials. Interwest offers the following pricing options: <br /> Item Description Quantity Unit Unit Price Total Price <br /> B25 Arch Railing System- Handrail -1460 LF $54 -$78,840 <br /> B25R1 Handrail - Stainless Steel Direct. Finish 500 LF $207 $103,500 <br /> B25R2 Handrail - Stainless Steel Orbital. Finish 500 LF $180 $90,000 <br /> • <br /> B25R1 Directional Finish Breakdown: <br /> Material $ 74,250.00 <br /> Tax $ 7,276.50 <br /> Installation $ 8,590.20 <br /> Subtotal $ 90,116.70 <br /> 15%OH/Profit $ 13,517.51 <br /> Total $ 103,634.21 <br /> B25R2 Orbital Finish Breakdown: <br /> Material $ 63,750.00 <br /> Tax $ 6,247.50 <br /> Installation $ 8,590.20 <br /> Subtotal $ 78,587.70 <br /> 15%OH/Profit $ 11,788.16 <br /> Total $ 90,375.86 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI I21 OF <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.