Laserfiche WebLink
Trim Aluminum Screen Panels <br /> Material $ 6,250.00 <br /> Sales Tax $ 612.50 <br /> Installation $ - <br /> Subtotal $ 6,862.50 <br /> 12% OH/Profit $ 823.50 <br /> Total $ 7,686.00 <br /> Orbital Finish Aluminum Cap Channel <br /> Material $ 6,216.00 <br /> Sales Tax $ 612.50 <br /> Installation $ - <br /> Subtotal $ 6,828.50 <br /> 12% OH/Profit $ 819.42 <br /> Total $ 7,647.92 <br /> Interwest requests 0 additional Contract Days work to perform this work. <br /> Please do not hesitate to contact me if you wish to discuss this matter. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION, INC. <br /> Izaak Fox,P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: <br /> 2 of 2 <br />