Interwest Construction Inc 10/22/2019 Change Order 14
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:36:38 AM
Creation date
11/4/2019 9:35:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
14
Tracking Number
0000801
Total Compensation
$26,495.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 14 <br /> Change Order Effective Date: 09-20-2019 <br /> CONTRACTOR <br /> By ,Q,ao,2 <br /> Officer Date: 9/2- /2,0 , 9 <br /> Exhibit A—Description of Changed Work <br /> Mt. Norway Fabrication Changes: <br /> 1. The galvanized handrail system per contract is eliminated. Domestic stainless steel handrail <br /> and brackets will be installed per attached revised contract plans (A4.1, A5.0, A5.2) and <br /> specifications (SP6-06.6). <br /> 2. The aluminum panels shown in the plans and provided digitally by the architect had a width of <br /> 4'-0". The aluminum material purchased was 4'-0". The panels were revised to be 3'11-7/8" <br /> wide in order to accommodate the 1/8" gap. The contractor will be compensated to trim down <br /> each if the 300+panels 1/8". <br /> 3. The aluminum throw barrier top channel will be changed to have an orbital finish, similar to the <br /> panels. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit certificate of material origin for all stainless steel handrail and brackets. . <br /> Measurement and Payment <br /> Cost for stainless steel handrail shall be by linear foot installed and include all labor, materials, <br /> equipment necessary. <br /> Trimming of the aluminum throw barrier panels and aluminum top channel shall be lump sum and <br /> include all labor, materials, equipment necessary. <br /> ATTACHMENTS(10 Additional Pages) <br /> • Exhibit C- New Bid Items and Changes to Existing Bid Items <br /> • Revised Plan Sheets A4.1, A5.0 and A5.2 <br /> • Revised SP 6-06.6 <br /> • Interwest Construction COP 018, dated 8/2/19 <br /> • Interwest Construction COP 019, dated 8/6/19 <br /> Page 3 of 3 <br />