My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 17
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:21:44 AM
Creation date
11/4/2019 10:21:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
17
Tracking Number
0000801
Total Compensation
$14,663.05
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 17 <br /> Change Order Effective Date: 10-01-2019 <br /> CONTRACTOR <br /> By /(_ VA* a__ <br /> Officer Date: 10111/ 9 <br /> Exhibit A—Description of Changed Work <br /> Added Box Beam 33 x 4 per RFP-004 <br /> Furnish and Install additional Box 33x4 as shown on the attached plans. Member is to be painted <br /> black. This Box is supported by the diagonal member LO-U1 (which will get 8 new bolt holes in flange <br /> —see Detail 2), and the vertical member Ll-U1 (which will get 3 new bolt holes in flange—see Detail <br /> 3). <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit shop dwgs for approval prior to fabrication. <br /> Measurement and Payment <br /> Payment shall be lump sum and include all labor, equipment and materials to complete the installation. <br /> ATTACHMENTS(10 Additional Pages) <br /> • Interest Construction COP 016, dated 2/12/19 (3 pgs) <br /> • RFP-004 Attachments (7 pgs) <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.