Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 17 <br /> Change Order Effective Date: 10-01-2019 <br /> CONTRACTOR <br /> By /(_ VA* a__ <br /> Officer Date: 10111/ 9 <br /> Exhibit A—Description of Changed Work <br /> Added Box Beam 33 x 4 per RFP-004 <br /> Furnish and Install additional Box 33x4 as shown on the attached plans. Member is to be painted <br /> black. This Box is supported by the diagonal member LO-U1 (which will get 8 new bolt holes in flange <br /> —see Detail 2), and the vertical member Ll-U1 (which will get 3 new bolt holes in flange—see Detail <br /> 3). <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit shop dwgs for approval prior to fabrication. <br /> Measurement and Payment <br /> Payment shall be lump sum and include all labor, equipment and materials to complete the installation. <br /> ATTACHMENTS(10 Additional Pages) <br /> • Interest Construction COP 016, dated 2/12/19 (3 pgs) <br /> • RFP-004 Attachments (7 pgs) <br /> Page 3 of 3 <br />