My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 17
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:21:44 AM
Creation date
11/4/2019 10:21:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
17
Tracking Number
0000801
Total Compensation
$14,663.05
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> February 12th, 2019 COP 016 <br /> Ken Kettel, Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: COP 016: Add 33" x 4"Box Beam <br /> Grand Ave Park Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested by the City to add a 33"x 4"box beam to the Grand Avenue Park Bridge. <br /> Interwest proposes to provide additional labor, equipment, and materials as detailed below to <br /> address the added work requested: <br /> • Provide and install 33"x 4"box beam to the west landing per RFP 04, 5/22/2018. <br /> Interwest's proposed price includes the following clarifications: <br /> • This proposal does not address the drip holes also requested in the revised RFP 04. That <br /> item was previously addressed with CO 09. <br /> • Sales tax has been included on materials. <br /> Interwest proposes the following Pricing for these changed conditions: <br /> "Novae_ T.,l.11 337 k N"viit4 1..1r Lt wt <br /> • $ 14,663.05 Lump Sum(No Tax) <br /> TOTAL $ 14,663.05 Lump Sum (No Tax) <br /> Interwest requests 0 additional Contract Days work to perform this work. <br /> Please do not hesitate to contact me if you wish to discuss this matter. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION,INC. <br /> Izaak Fox, P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: Cost Backup:TMF PCO 012 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI 12 I OF <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.