My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 17
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:21:44 AM
Creation date
11/4/2019 10:21:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
17
Tracking Number
0000801
Total Compensation
$14,663.05
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THOMPSON <br /> METAL FAB <br /> 360-696-0811 1360-693-1017 fax ( TMFAB.COM <br /> MAILING: P.O.Box 5276,Vancouver,WA 98668 <br /> PHYSICAL: 3000 SE Hidden Way,Bldg 40,Vancouver,WA 98661 <br /> 01/22/2019 <br /> Attention: Izaak Fox <br /> Reference: Grand Ave. Pedestrian Bridge (TMF Job 24217, Interwest PO No. 1157-02) <br /> Subject: TMF PCO 24217-012 Bridge Box Beam 2011010 Rev B <br /> Narrative: This PCO is to show the cost of detailing,fabricating,and painting the requested box beam. <br /> Cost breakdown: <br /> ➢ Detailing-$1,555.00 <br /> > Material-$1,886.40 <br /> > Processing and handling-4 hours at$75.00=$300.00 <br /> ➢ Fitup-16 hours at$75.00=$1,200.00 <br /> > Weld—20 hours at$75.00=$1,500.00 <br /> > Blast, Paint,and Inspect—8 hours at$75.00=600.00 <br /> Total =$7,041.40 x 21%markup=$8,520.09 <br /> Change Order Value <br /> PCO 24217-012 TOTAL $8,520.09 <br /> This proposal is a priority and we would like to work with you on any questions you may have or further analysis <br /> you require.We recognize Interwest as an extremely valuable customer and we are committed to the success of <br /> the project and our relationship.Conference calls, emails and face-to-face visits are welcomed to resolve this <br /> matter in a timely fashion. <br /> Best Regards, <br /> David Rosenstiel <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.