Project: Grand Avenue Park Bridge <br /> Change Order No.: 15 <br /> Change Order Effective Date: 09-30-2019 <br /> CONTRACTOR <br /> By da,,La �,�, <br /> Officer Date: /D/0 f / /9- <br /> Exhibit A—Description of Changed Work <br /> Incentive for Not Impactinji PUD Transmission Lines <br /> Per special provision 1-07.17,pg. S63, Lines 43-48, the Contracting Agency will pay the <br /> Contractor$20,000.00 if construction methods are utilized that allow for construction of the project <br /> without removal of the PUD transmission lines for bridge erection. Utilizing the transporter <br /> erection method allowed the transmission lines to remain in place during erection. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> N/A <br /> Measurement and Payment <br /> Payment shall be lump sum. <br /> ATTACHMENTS(2 Additional Pages) <br /> • Interest Construction SL-057, dated 9/27/19 <br /> • SP 1-07.17,pg. S63 <br /> Page 3 of 3 <br />