Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 16 <br /> Change Order Effective Date: 10-01-2019 <br /> CONTRACTOR <br /> BY It ilka_ ,� .e <br /> Officer Date: //2 (;1/ <br /> Exhibit A—Description of Changed Work <br /> Elevator Stainless Steel Enclosures and Elimination of Concrete Protection Plan <br /> Concrete pour back around each of the elevators is eliminated and replaced with an 18 ga. stainless <br /> steel cladding enclosure per attached details. <br /> The concrete surface protection plan,per SP6-03.3(38) is eliminated. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> Submit Certificate of Material Origin for all steel products. <br /> Measurement and Payment <br /> Payment shall be lump sum and include all labor, equipment and materials to complete the installation. <br /> ATTACHMENTS(6 Additional Pages) <br /> • Interest Construction COP 020, dated 8/06/19 <br /> Page 3 of 3 <br />