My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 16
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 10:46:48 AM
Creation date
11/4/2019 10:33:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
16
Tracking Number
0000801
Total Compensation
$23,621.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> August 06,2019 COP 020 <br /> Ken Kettel,P.E.,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 020:Elevator Jamb Enclosure Pour Back or Modification Per RFI 271 <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to provide pricing for changes to the elevator enclosure per the response to RFI 271. <br /> The Engineer has directed additional reinforcement be added not originally included in the plans. <br /> At this time, that work will require removal and re-installation of a significant portion of the <br /> already installed elevator entries. Citing the expense of this added work and the aesthetic <br /> implications, Interwest has suggested a metal enclosure performed by North Shore Exteriors who <br /> has performed the metal flashing work on this project to date. <br /> Interwest offers the following pricing options: <br /> Item Description Quantity Unit Unit Price Total Price <br /> OPT1 Concrete Pourback 1 LS $35,000 $35,000 <br /> OPT2 Metal Enclosure 1 LS $29,000 $29,000 <br /> Option 1:Concrete Pour Back <br /> Interwest Work $ 8,891.00 <br /> Subcontractor Work $ 21,112.00 <br /> Subtotal $ 30,003.00 <br /> 15% OH/Profit $ 4,500.45 <br /> Total $ 34,503.45 <br /> Option 2:Metal Enclosure <br /> Interwest Work $ (4,500.00) <br /> Subcontractor Work $ 30,676.00 <br /> Subtotal $ 26,176.00 <br /> 12% OH/Profit $ 3,141.12 <br /> Total $ 29,317.12 <br /> As the concrete work for the pour back would be performed at unit price per Bid Item B002 <br /> Concrete Class 4000 for Ped Upgrades, Interwest will expend more labor cost than revenue is <br /> recovered. In recognition of this, Interwest has credited the surplus labor which will not be <br /> expended to support construction of the metal enclosure. The metal enclosure is priced to include <br /> Buy America compliant steel materials. <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI 121 OF <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.