Laserfiche WebLink
COPYRIGHT NOTiCE � <br /> MECHANICAL NOTES GENERAL NOTES ABBREVIATIONS PIPING SYMBOLS DUCTWORK SYMBOLS GENERAL SYMBOLS THIS DOCUTAENT AND THE INFORMATION .'#� <br /> HERE�N RELATING TO THE PRO,IECT ARE <br /> AN INSiRU�IENT OF SERVICE AND THE <br /> COPYRIGHTED PROPERTY OF BOiESCH, <br /> 1. THE FOLLOWWG NOTES APPLY TO ALL MECHANICAL DRAWINGS. PROTECT ALL DUCT OPENINGS OF FIRE RATED ASSEMBUES PER I.B.C. 716. ADA AMERICANS WITH DISABILITIES ACT NASH ANO HALL ARCHITECTS, P.s. No <br /> -��F-- BALL VALVE HWS HEATING WATER SUPPLY � DUCT SECTION -SUPPLY p-� PLUMBING FIXTURE PART HEREOF SHALL 8E COPIED, <br /> ADDITIONAL MECHANICAL NOTES MAY BE INDICATED ON EACH AFF ABOVE FINISHED FLOOR IDENTIFICATION DUPLICATED, DISTRIBUTEO, DISCLOSED OR <br /> W1DE AVAILABLE TO OTHERS OR USED TO <br /> MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWING. INSTALL SEISMIC BRACING FOR ALL DUCTWORK, EQUIPMENT AND PIPING ^� BALANCING VALVE - - -HWR- - - HEATING WATER RETURN AM' EXTENT WHATSOEVER, EXCEPT AS • <br /> ARCH. ARCHITECT/ARCHITECTURAL -�'`'r- EXPRESSLY AUTHORIZED IN WR�TING BY <br /> PER I.B,C. REQUIREMENTS. -� �--- BUTTERFLY VALVE CA COMPRESSED AIR � DUCT SECTION - RETURN M_� EQUIPMENT BOTESCH, NASH AND HALL ARCHITECTS, <br /> CA COMPRESSED AIR f <br /> 2. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CD CEILING DIFFUSER CHECK VALVE CHS CHILLED WATER SUPPLY RECTANGULAR DUCT IDENTIFICATION <br /> CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, INSTALL ALL PIPING ON ROOM SIDE OF BUILDING INSULATION. CG CEILING GRILLE ��- 20x12 (INSIDE DIMENSION) � <br /> FLASHING DETAILS, ETC. E'`� CLEAN OUT - - - CHR - - - CHILLED WATER RETURN KITCHEN FIXTURE Q <br /> MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT CO CLEANOUT K-1 0 <br /> COP COEFFICIENT OF PERFORMANCE �'�'�- CONTROL VALVE -2 WAY CWS CONDENSER WATER SUPPLY 20°� ROUND DUCT IDENTIFICATION <br /> 3. MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND NECESSARILY REFLECT EVERY REQUIRED OFF-SET, FITTING OR ACCESSORY. � <br /> DIFFUSERS. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND CONT. CONTINUATION � CONTROL VALVE - 3 WAY - - -CWR- - - CONDENSER WATER RETURN � <br /> -��- I FLEX CONNECTION '` <br /> ELEVATIONS FOR EXACT LOCATIONS. THE MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO DWG DRAWING "� <br /> s <br /> BEGINNING WORK IN ORDER TO OBSERVE EXISTING CONDITIONS. VERIFY DEMOLISHED ITEM D CONDENSATE DRAIN AIR TERMINAL MARK cn <br /> (E) EXISTING ITEMS �� � L20x12 LINED DUCT (INSIDE DIMENSION) o 0 <br /> 4. ARRANGE HVAC EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED BY EXACT SIZE, LOCATION AND CONDITION OF ALL EXISTING SYSTEMS, DUCTS, EA EXHAUST AIR FLOW METER F FIRE SPRINKLER PIPE - - - - - - - T Y P E (S E E <br /> DRAWINGS, REQUIRED BY CODES OR RECOMMENDED BY MANUFACTURER PIPES, UTILITIES AND BUILDING STRUCTURE. EAT ENTERING AIR TEMP. X SCHEDULE) > � . <br /> FLEX CONNECTION G NATURAL GAS L12x10 LINED DUCT INSIDE DIMENSION w N <br /> ARE PROVIDED. EER ENERGY EFFICIENCY RATING �- - --- -- -' � � 200�_ � o <br /> VERIFY VOLTAGES AT THE SITE PRIOR TO ORDERING ANY EQUIPMENT. EFF EFFICIENCY/ EFFICIENT GATE VALVE LR LIQUID REFRIGERANT DESIGN CFM <br /> 5. PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST ELECT. ELECTRICAL -�-�,r- PRESSURE REDUCING VALVE - - - - SR - - - - SUCTION REFRIGERANT ' � � 90° CONICAL SPIN-IN FITTING <br /> OPENING, IN SUPPLY BRANCH WHERE THREE OR MORE OPENINGS ARE CONTRACTOR SHALL PROVIDE WASTE, VENT, WATER AND GAS PIPING, � <br /> ASSOCIATED WITH THE BRANCH,AND ELSEWHERE AS NOTED ON DRAWINGS INCLUDING TRAPS, FITTINGS AND STOPS TO COMPLETE EACH EQUIPMENT FCO FLOOR CLEANOUT r�'• PRESSURE RELIEF VALVE RL RAIN LEADER DETAIL REFERENCE <br /> OR IN SPECIFICATIONS. HOOK-UP TO THE POINT OF FINAL CONNECTION. CONNECTION BETWEEN LE. INVERT ELEVATION FLEXIBLE DUCT <br /> RPBP REDUCED PRESSURE - ORL OVERFLOW RAIN LEADER DETAIL NUMBER a <br /> VARIOUS PIECES OF EQUIPMENT SHALL BE MADE BY THE PLUMBING LAT LEAVING AIR TEMP. JJ � � E <br /> CONTRACTOR AT THE TIME EQUIPMENT IS BEING INSTALLED, MC MECHANICAL CONTRACTOR BACKFLOW PREVENTER --�-� pIPE DOWN � TURNING VANE � <br /> 6. REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS VALVES -' <br /> ETC. FLOOR PLANS AND SECTIONS INDICATE EQUIPMENT LOCATIONS AND MECH. MECHANICAL THERMOMETER -�o M�2 DRAWING ON WHICH --' �t* <br /> GENERAL PIPE ROUTING ONLY. PROVIDE PIPING SHOP DRAWINGS OSA OUTSIDE AIR PIPE UP = _ <br /> ALL MECHANICAL EQUIPMENT LOCATED IN CEILING CAVITIES THAT REQUIRE � CEILING DIFFUSER SECTION IS LOCATED <br /> COORDINATED WITH OTHER TRADES. REFER TO SPEC. FOR ADDITIONAL SHOP ELECTRICAL CONNECTION SHALL HAVE AN 8-1/2"X 11" LAMINATED SIGN --�I�-- UNION -� HOSE BIBB/WALL HYDRANT � �- <br /> P.O.C. POINT OF CONNECTION = <br /> DRAWING REQUIREMENTS. PERMANENTLY MOUNTED ON THE ELECTRICAL ENCLOSURES THAT INDICATES: RG RETURN/ RELIEF GRILLE - - - - - - - - VENT RETURN /EXHAUST 1 �„ , <br /> "THIS EQUIPMENT MUST HAVE A MINIMUM ACCESS OF 36" (LESS THAN 460V) -��� HOSE DRAIN VALVE � TRANSFER GRILLE OR REGISTER SECTION REFERENCE � �`i <br /> AND 42" 460V AND ABOVE . NO TRADE SHALL BLOCK THIS SPACE EVEN IF SA SUPPLY AIR WASTE ¢ � <br /> 7. DUCTWORK STATIC PRESSURE AND SEAL CLASS, BASED UPON SMACNA: � � „ SENS SENSOR o VENT THROUGH ROOF � VOLUME DAMPER SECTION NUMBER � cri �`; <br /> SHOWN ON THE DRAWINGS. INSTALL SIGN PRIOR TO INSTALLATION OF COLD WATER(DOM). '``'' <br /> EQUIPMENT. SG SUPPLY GRILLE - � FLOOR DRAIN M MOTORIZED DAMPER � A z � ;� <br /> DUCT SYSTEM STATIC PRESS. SEAL CLASS HOT WATER DOM �� <br /> T'STAT THERMOSTAT - - � �• � FLOOR SINK �l/ M.2 ^ � W� <br /> A. UPSTREAM OF TERMINAL UNITS + 6.0" A ALL MECHANICAL EQUIPMENT THAT REQUIRES ACCESS FOR COIL PULL, TYP TYPICAL _ _ _ HOT WATER RECIRC. (DOM . � DRAWING ON WHICH � � � <br /> �� FILTER CHANGE MOTOR CHANGE, COMPRESSOR CHANGE, LUBRICATION, � SPRINKLER HEAD - PENDANT COMBINATION SMOKE/FIRE DAMPER SECTION IS LOCATED c� v� • � <br /> B. DOWNSTREAM OF TERMINAL UNITS + 1.0 C � U.O.N. UNLESS OTHERWISE NOTED . <br /> C. DOWNSTREAM OF RETURN FANS + 1.0" C SHEAVE AND BELT CHANGE, FAN CHANGE OUT, ETC, SHALL HAVE AN 8-1/2"X V VENT � SPRINKLER HEAD - UPRIGHT � � �� .�3; <br /> DUCT SMOKE DAMPER <br /> D. UPSTREAM OF RETURN FANS -2.0" C 11" LAMINATED SIGN PERMANENTLY MOUNTED ON THE EQUIPMENT ACCESS VTR VENT THROUGH ROOF � REVISION IDENTIFICATION p � a?o ' <br /> E. OUTSIDE AIR INTAKE DUCTS -2.0" C PANELS THAT INDICATES "THIS EQUIPMENT MUST HAVE A MINIMUM ACCESS OF W WASTE -Q BACKDRAFT DAMPER m � N°; <br /> F. DOWNSTREAM OF FUME EXHAUST FANS + 6.0" ALL WELDED 36". NO TRADE SHALL BLOCK THIS SPACE.° �N <br /> G. UPSTREAM OF FUME EXHAUST FANS -6.0" A W C O W A L L C L E A N O U T 0 0 F L A G N O T E ,� y <br /> �� PROVIDE AND INSTALL A COMPLETE AND OPERATIONAL AUTOMATIC FIRE Q THERMOSTAT N� <br /> H. DOWNSTREAM OF TOILET EXHAUST FANS + 2.0 C � <br /> I. UPSTREAM OF TOILET EXHAUST FANS -2.0" C SPRINKLER SYSTEM PER N.F.P.A. 13. PROVIDE ALL REQUIRED PIPING, HEADS, GRILLE, REGISTER, DIFFUSER SCHEDULE �s SENSOR a � <br /> VALVES, CONTROLS AND ACCESSORIES. PROVIDE ALL REQUIRED ,� a <br /> 8. PROVIDE AIR DISTRIBUTION SUPPLY/RETURN/EXHAUST SHOP DRAWINGS CALCULATIONS. OBTAIN ANY REQUIRED PERMITS AND PAY ALL REQUIRED FACE NECK BRANCH � � °' � <br /> � � FEES IN ORDER TO INSTALL A COMPLETE AND OPERATIONAL SYSTEM. 0 TYPE MFGR& MODEL SIZE SIZE BORDER OBD DUCT SIZE, �C CO2 SENSOR N� <br /> C O O R D I N A T E D W I T H O T H E R T R A D E S. R E F E R T O S P E C. F O R A D D I T I O N A L S H O P MARK IN. IN. IN. <br /> DRAWING REQUIREMENTS, <br /> 9. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS. LOCATE O SUPPLY TITUS MCD 24"x24" 10"x10" LAY-IN NONE 10" DRAWI NG I N DEX � <br /> „ „ �, „ „ �tf <br /> MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS, 0 SUPPLY TITUS MCD 24 x24 8 x8 LAY-IN NONE 8 <br /> PANELS, ETC. SO THAT THEY DO NOT CONFLICT WITH GENERAL DWG. DESCRIPTION - <br /> CONSTRUCTION, LABORATORY EQUIPMENT, OR ELECTRICAL SYSTEM LIGHT � RETURN TITUS 50F 24"x24" 22"x22" LAY-IN NONE NOTED ON PLANS <br /> � M0.1 MECHANICAL LEGEND, NOTES AND SCHEDULES <br /> SWITCHES, PANELS, OUTLETS, ETC.). 0 TRANSFER TITUS 50F 24"x12" 22"x10" LAY-IN NONE NOTED ON PLANS y <br /> M1.0 MECHANICAL UNDER FLOOR PLAN <br /> GAS / AIR CONDITIONING UNIT SCHEDULE M�.� HVACFLOORPLAN <br /> M1,2 MECHANICAL ROOF PLAN � <br /> EQUIP COOLING SUPPLY FAN HEATING ELECTRICAL MIN WEIGHT, MANUFACTURER U <br /> N0. AREA SERVED TYPE CAP MBH EAT Deg F OA SEER AIRFLOW ESP MOTOR MOTOR INPUT OUTPUT STAGES AFUE VOLTAGE PHASE MCA MOP OSA LBS & MODEL REMARKS M2.1 PLUMBING FLOOR PLAN <br /> TOTAL SENS DB WB Deg F DB CFM IN WG HP DRIVE MBH MBH � � <br /> M3.1 MECHANICAL DETAILS AND DIAGRAMS � �,* <br /> ACU-1 EXISTING UNIT TO REMAIN W = <br /> ACU-2 EXISTING UNIT TO REMAIN � }- <br /> ACU-3 EXISTING UNIT TO REMAIN � . <br /> � � <br /> ACU-4 EXISTING UNIT TO REMAIN --� z <br /> � W <br /> AC-A--5 EXISTING UNIT TO REMAIN L.� W <br /> AC-A-6 EXISTING UNIT TO REMAIN = � <br /> Q <br /> ACU-7 EXISTING UNIT TO REMAW � � � E <br /> AC-A-8 EXISTING UNIT TO REMAW � � � , <br /> ACU-9 EXISTING UNIT TO REMAW Q w � <br /> W <br /> ACU-10 EXISTING UNIT TO REMAIN � � � ; <br /> W <br /> ACU-11 SOUTH INTERIOR ROOFTOP 63 46 80 67 85 17.5 1,900 0.6 1 DIRECT 80 64 1 80 208 3 31.7 45 160 800 TRANE YSC067E3 ECONOMIZER W/ POWERED EXHAUST = O� � <br /> ACU-12 EXISTING UNIT TO REMAIN ~ � w . <br /> �C. � w6��'-9 <br /> EXHAUST FAN SCHEDULE PUMP SCHEDULE V�� ,. N� � 4 <br /> ��- o 0 <br /> MOTOR PUMP MOTOR PUMP PIPE � ' 2 �� <br /> EQUIP. FAN AIRFLOW EXT SP SONES MANUFACTURER EQUIP. WEIGHT MANUFACTURER �:-' ` <br /> N0. AREA SERVED -(�rpE CFM IN WG RPM - (INLET) DRIVE & MODEL CONTROL REMARKS N� SERVICE PUMP TYPE MINo CONN. LBS & MODEL REMARKS <br /> HP (W) VOLTS PHASE GPM FT HEAD WATTS VOLTS PH RPM EFF, /o IN. ,�� ,� 2�362 0 �,�. <br /> EF-1 RESTROOM 105 CEILWG 100 0.375 1601 128W 120 1 1.5 DIRECT GREENHECK SP-B150 LIGHTS HWCP-1 DOM. WATER CIRC. PUMP 2.2 3.9 CIRCULATOR 8.5 120 1 - - - - GRUNDFOS UP10-16A ��`FS FG�STER� G��� y <br /> S��NA L EN <br /> JOB NUMBER <br /> 18-1069 � <br /> DUCT INSU�ATION SCHEDU�E PIPE AND EQUIPMENT INSULATION SCHEDULE °ATE <br /> ,�,��2�,9 <br /> INSULATION THICKNESS (INCHES) BY PIPE SIZE °�"""�` k <br /> INSULATION TEMP. RANGE THERMAL COND. MEAN TEMP. RATING INSULATION �K <br /> DUCT TYPE DUCT LOCATION OTHER REQUIREMENTS PIPING SYSTEM * * z* NOTES •` <br /> R-VALUE Deg. F Btu in/(hr ft Deg. F) Deg. F MATERIAL � 1" 1"TO < 1-1/2" 1-1/2" TO <4" 4"TO < 8° 8"AND UP cHECKEo e� ��` <br /> LWB <br /> NOT WITHIN CONDITIONED SPACE: DOMESTIC COLD WATER ALL 0.21 -0.27 75 FIBERGLASS 0.5 0.5 1.0 1.0 1.0 1, 2 <br /> SUPPLY, RETURN ON EXTERIOR OF BUILDING, ON ROOF, IN ATTIC IN ENCLOSED R-7 APPROVED WEATHER PROOF BARRIER <br /> CEILING SPACE, IN WALLS, IN GARAGE , IN CRAWL SPACES. DOMESTIC HOT WATER > 105 0.21 -0.28 100 FIBERGLASS 1.0 1.0 1.5 1.5 1.5 1, Z SHEET TiTLE <br /> MECHANICAL <br /> DOMESTIC HOT WATER RECIRC. > 105 0.21 -0.28 100 FIBERGLASS 1.0 1.0 1.5 1.5 1.5 1, 2 LEGEND <br /> OUTSIDE AIR INTAKE WITHIN CONDITIONED SPACE R-7 PER THE W.S.E.C. SECTION 1414.2 NOTES AND <br /> SCHEDULES <br /> SUPPLY, RETURN, NOT WITHIN CONDITIONED SPACE: R-5.3 NOTES: <br /> OUTSIDE AIR INTAKE IN CONCRETE, IN GROUND 1. FOR HOT& COLD PIPING LARGER THAN 2", UTILIZE RIGID INSERTS, INSULATION CONTINUOUS <br /> THROUGH THE HANGER, SHEET METAL SHIELD. k <br /> SUPPLY WITH SUPPLY AIR 2. F4R COLD PIPES 2"AND SMALLER, UTILIZE RIGID INSERTS, INSULATION CONTINUOUS THROUGH �';�' <br /> TEMPERATURE <55°F OR>105°F WITHIN CONDITIONED SPACE R-3.3 THE HANGER, SHEET METAL SHIELD. S"EET"�"'BER <br /> � <br /> NOTE: REQUIREMENTS APPLY TO THE DUCT TYPE LISTED, WHETHER HEATED OR MECHANICALLY COOLED. MECHANICALLY COOLED DUCTS � y <br /> REQUIRING INSULATION SHALL HAVE A VAPOR RETARDER, WITH A PERM RATING NOT GREATER THAN 0.5 AND ALL JOINTS SEALED. M O � I ~ <br /> � <br /> � <br /> w � <br /> a <br /> : � <br /> :-s <br />