Laserfiche WebLink
i. <br /> CONSTRUCTION SEQUENCE owner/applicant + <br /> � p,T S. q� <br /> legend YW COLBY DEVE�OPMENTS L�C. ��PoF WASy� i�, , � <br /> 1. INSTALL AND COMPL+�TE THE SEDtMENT FENCE AS SHOWN. � ,�F, ti <br /> �� I � <br /> vvv PROPOSED SAN. ( � PROPOSED ( ; ' <br /> 2. COMPLETE THE CONSTRUCTION ENTRANCE PAD ROCK PLACEMENT AS SHOWN. ���� t <br /> I vvvv v SEWER MH �_ _� A.C. PAVEMENT <br /> �v� <br /> 3. EXTEND THE STORM DRAIN AND INSTALL THE SOUTH PROPERTY LINE DRAINAGE AND PROPOSED PUBUC ! ° a � � 43 O <br /> TEMPORARY SEDIMENT P�ND FACILITIES, WHILE PROTECTING ALL CATCH BASIN INLETS WITH I � NOTCNED CURB � �ISTER� G� <br /> STORMDRA�N CB � � S�ONA� �� <br /> APPROPRIATE SEDIMENT TRAPS AS A PART OF THE INSTALLATION PER STANDARD DETAILS LISTED. P,ROPOSED BEEHIVE (DOMED) 6 a � E <br /> I � GRA TE QN a, . N � <br /> STORMDRAIN <br /> � EX. WATER METER CB OR INLET �SIGNED: 25 APR 20�7 � ;. <br /> ' d ° <br /> ER�SION and SEDIMENT � EXISTING PARKING LOT `"M PROPosEo <br /> CONTROL GEI`IERAL NOTES PP � EXTR�oEo �oNc. �uRB ° ° : <br /> E.O.P ED GE OF PA VEMEN T <br /> 1. IF EROSION CONTROL IS NOT WORKING AS EXPECTED, AdDITIONAL EROSION CONTROL IS ___- / --- °� a 589�59�09'�E i <br /> ,---- --------o----------.- - - - - - - - -� <br /> --------- - - ..- <br /> REQUIRED. Ex�sT�NG RBC a <br /> LS 35078 0.04' - S89 59'09„E 128.81 ' Ex�sTiN� �BC - -G" 35.00' <br /> � <br /> 2. SHOULD THE TEMPORARY ERaSION AND SEDIMENT CONTROL MEASURF_S SHOWN ON THIS PLAN N. & 0.02' E ; LS 10446 a Q e <br /> �'�� , � �� 0.10' S. & 0.11' W. � <br /> PROVE TO BE INADEQUATE DURING CONSTRUCTION, 7HE CONTRACTOR SHALL INSTALL ADDITIONAL - ,; <br /> a , _ . ; � Z � <br /> EROSION AND SEDIMENT CONTROL FACILIT�ES. . - <br /> � � � a Z � <br /> . <br /> EX.WM � a W � <br /> �-' <br /> ' = <br /> 3. ALL EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE INSPEC7ED DAfLY AND - ,, , <br /> IMMEDIATELY MAINTAlNED AS NECESSARY. S `��� -' . :; , a � J <br /> �; ; � � 0 <br /> SSMH , . - - -- . a <br /> ---� � � , <br /> 4. ALL TEMPORARY EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE LE� IN I RIM=21�.76 � ,� -- o <br /> PLACE UNTIL THE UPSLOPE AREAS HAVE BEEN PERMANENTLY STABIUZEQ. I a a z <br /> . W �X SF(q/ � - I c� d, Q 0 <br /> 5 HERE APPLICABLE, THIS PROJECT SHALL COMPLY W1TH THE EROStON AND SEDIMENT CONTROL E/� c9 V <br /> REQUIREMENTS IN THE WASHINGTON STATE QEPARTMFNT �F ECOLOGY STORMWATER MANAGEMENT `SERI// Q� � a ° a � � Q � f- <br /> MANUAL FOR WESTERN WASHINGTON. C� 20 ', o >- � a <br /> o�,z �r- � W � w <br /> 6. THE STABILIZED CONSTRUGTION ENTRANCE, TEMPORARY SEDIMENT POND AND SILT FENCING � � I ° a Q W Q <br /> A � � <br /> (WHERE SHOWN ON THE PtAN} SHAL L B E 1 N S T A L L E Q P R I O R T O O R A S F I R S T S T A G E O F T M E � x � � , . <br /> PROJECT CONSTRUCTION. OTNER SEDIMENT CONTROL MEASURES SUCH AS SEDIMENT TRAPS, " ``' �' 1 � � � W c�! <br /> B A R R I E R S A N D O T H E R B E S T M A N A G E M EN T MEASURES (BMP) SHALL BE CONSTRUCTEd AS NECESSARY. � � � � m � ' <br /> I O O � � <br /> 7. THE CONTRACTOR SHALL PROVIDE DUST CONTROL, AS NECESSARY, DURING THE ENTIRE I,-- a o � Q z <br /> EARTHWORK OPERATIONS AND EXP�SEd SOILS. I ' a o � 0 : <br /> 8. SEDIMENTS FROM THE CONSTRUCTfON S1TE THAT IS 7RACKED QNTO PUBLIC STREETS SHALL BE (` ° � C� � <br /> REMOVED AND CLEANED IMMEDIATELY, AND THOROUGHLY CLEANED AT THE END OF EACH DAY DUR�NG a � a <br /> � N � <br /> � � � a � �a <br /> CONSTRUCTION. WASHING OF PAVEMENT SHALL NOT BE DONE. ' ' ' <br /> � a � a 4 � N W <br /> , ' , ° EX. CQNC. WALK a_ a . � a. d. <br /> 9. ALL AREAS WHIGH HAVE BEEN STRIPPED OF VEGETATION OR EXPERIENCING LAND DISTURBING ' � ` � ° ' <br /> ACTIVITIES, AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD EXCEEDING THE LISTED ` ° � Q <br /> CRITERIA BELOW, MUST BE IMMEDIATELY STABIUZED WITH MULCHING, GRASS PLAN7ING QR OTHER a ° <br /> APPROVED EROSION CONTROL TREATMENT APPROPRIATE TO THE TIME OF YEAR. GRASS SEEDING ' Q � <br /> ALONE WILL ONLY BE ACCEPTABLE DURING THE MONTHS OF APRiL THROUGH SEPTEMBER. HOWEVER, ` a : � <br /> SEEDING MAY PROCEED WHENEVER 1T IS IN THE 1NTEREST OF THE OWNER/CQNTRACTOR, BUT MusT EXISTING BUILDING #4220 N ` ' <br /> ALSO BE AUGMENTED WITH MULCHING, NETTING �R OTHER APPROVED TREATMENT. - o� � <br /> d' -� ° d <br /> 10. DRY SEASON (MAY 1 THRU SEPTEMBER 30) -- THE CLEAR�NG OF LAND, INCLUDiNG THE I � SEE ARCHITEGHURAL o � a I . <br /> REMOVAL OF EXISTING VEGETATION OR OTHER GROUND COVER, MUST BE LIMITED TO ONLY AS MUCH �0 PLANS (SHEET AOQ1) `^ I o <br /> LAND AS CAN RECEIVE APPROPRIATE PROTECTfVE COVER OR BE OTHERWISE STABILIZED, AFTER ( FOR PARKING/TRAFFIC W a � � <br /> HAVING BEEN CLEARED OR OTHERWISE DJSTURBED, BY NO LATER THAN SEPTEMBER 30 OF A GIVEN MARKINGS DIMENSIONS, o � a : �' <br /> YEAR. HORIZQNTAL CONTRC�, o l ,�, oa o <br /> AND SIGNAGE�O O v, �: `- <br /> 11. UNLESS IMMEDIATE STABiLIZATION IS SPEClFIED W THE EROSION AND SEDIMENT CONTROL PLAN, O z� � <br /> ALL AREAS CLEARED OR OTHERWISE DISTURBED MUST BE APPROPRIATELY STABILI�ED THROUGH THE --- - - O� � a <br /> USE OF MULCHING, NETTING, PLASTIC SHEETING, EROSION BLANKETS, FREE DRAINING MATERIAL, ETC., � . W ° �� <br /> BY SEPTEMBER 30 OR SOONER PER THE APPROVED PLAN OR SUPPLEMENTAL STIPULATIONS. z w� <br /> d � � <br /> 12. UNLESS OTHERWISE APPROVED BY THE COUNTY, SEEDING, FERTlLIZING AND MULCHING OF a o 0 <br /> . <br /> CL�ARED OR OTHERWISE DfSTURBED AREAS SHALL BE PERFORMED DURING TNE F�LLOWlNG PERIODS: i a ( c� N N w <br /> MARCH 1 TO MAY 15, AND AUGUST 15 TO QCTOBER 1. SEEDING AFTER OCTOBER 1 WILL BE DONE N I ° a o o � � � W o <br /> WHEN PHYSICAL COMPLETION OF THE PRpJECT (S IMMINENT AND THE ENV/RONMENTAL GONDITIONS � �-- `: z � Q �y � � � <br /> ARE CONDUCIVE TO SATISFACTORY GROWTH. IN THE EVENT THAT PERMANENT STABILIZATION fS NOT '- Q � Q � <br /> POSSIBLE, AN ALTERNATIVE METHOD OF GROUND COVER, SUCH AS MULCHING, NETTIN�, P1ASTfC ' '`�e ° Q � N � w � w � <br /> SHEETING, EROSION BLANKETS, ETC., MUST BE INSTALLED BY NO LATER TNAN SEPTEMBER 30. � . ��j, ; a o z � � • <br /> � � _ � a , � � z o z z Y z <br /> , ��� : ...... ...._._ �._ ....._.. . . . ._ .... . . .� I �a .' J , . � W � � U <br /> 13. IN THE EVENT THAT CONSTRUCTION ACTIVITIES OR OTHER SITE DEVELOPMENT ACTIVITIES ARE � ` , Q , � ° �i Q w � _ � <br /> � �G , . , � ` '; c!1 � � o 0 o c� l� <br /> D I S C O N T I N U E Q F O R A T L E A S T 4 C O N S E C U T N E D A Y S, T H E O W N E R/C O N T R A C T O R S H A L L B E Q, <br /> � ( ; a <br /> �. <br /> RESPONSIBLE FOR THE INSPECTION OF ALL EROSIQN AND SEDIMENT CONTROL FACILITIES lMMEDIATELY � P,O <br /> � � - � � .�- ._� . <br /> AF7ER STORM EVENTS, AND AT LEAST ONCE EVERY WEEK. THE OWNER/CONTRACTOR SHALL BE G� <br /> RESPONSIBLE FQR THE MAWTENANCE AND REPAIR OF ALL ERdSION AN SEDIMENT CONTRaL \�� '° o ' ' °a ° ` , <br /> FACIUTIES. ' ��� � � - <br /> � _ .-. � � � �� <br /> 14. WET SEASON (C�TOBER 1 THRU APRIL 30) -- ON SITES WHERE UNINTERRUPTED E J � > _ . <br /> � <br /> a <br /> CONSTRUCTION ACTIVITY fS 1N PROGRESS, THE CLEARING OF LAND, WCLUDING THE REMOVAL OF O� Q � - <br /> % ' � } ; � '� " ; � <br /> EXISTING VEGETATION AND OTNER GROUND COVER, SHALL BE LIMtTED TO AS MUCH LAND AREA AS � , W <br /> CAN BE COVERED OR STABILIZED WITHIN 24 HOURS IN 7HE EVENT A MAJOR STORM IS PREDICTEQ � °� � �. ` , , � <br /> . , , ; <br /> / I STORM DRAIN, __ ' o � _ „ � <br /> AND OR EROSION AND SEDIMENT TRANSPQRT IS OBSERVED OFFSITE. ' EXIST�NG RBC S� � � '; � a PROP�SED NEW <br /> � 0.14' N. � ��. TYP. TEMP. SEDIMENT �, � <br /> 15. ALL CLEARED OR QISTURBED AREAS SNALL RECEIVE APPROPRIATE PROTECTfVE CQVER OR BE 0.04' W. �`. SEE SHEET C1 POND '� � 1 ° � d FIRE H YDRAN T <br /> OTHERWISE STABILIZED, SUCH AS MtJLCHING, NETTING, PLASTIC SHEETING, EROSION BLANKETS, FREE ( �j, f .w Q � <br /> DRAINING MATERIAL, ETC., WITHIN 5 DAYS AFTER HAVfNG BEEN CLEARED OR OTHERWISE DISTURBED � �LA TER STflRM L � _ TREES TO � ' � ° a. �. <br /> � -' , �E REMOVED ` � <br /> IF NOT BEING ACTNELY WORKEQ. SILT FENCING, SEDIMENT TRAPS, SEDIMENT PONDS, ETC., WILL NOT ' : � GRASS FILTER� - . ' � � , �----__i ,� <br /> BE VIEWED AS ADEQUATE COVER IN AND �F THEMSELVES. `` ° Z <br /> � �C'� ' _ ,. 22 ' CEDAR ° a � . <br /> 16. IN THE EVENT THAT ANY LAND AREA NOT BEING ACTIVELY WORKED REMAINS UNPROTECTED OR ' � <br /> Q HAS NOT BEEN APPROPRtATELY STABILtZED 5 DAYS AF7ER NAVING BEEN CLEARED, ALL PP6 � ` a " � <br /> � . <br /> CONSTRUCTION ACTIVITY ON THE SITE EXCEPT FOR APPROVED EROSION AND SEDIMENT CONTRQL ' 'a a _ ' 15"C�DAR �" S S, TYP , a Q N89°59'35�rW `� � <br /> � � � o ❑ `� <br /> w ACTIVITY, SHALL lMMEDIATELY CEASE UNTIL SUCH A TIME AS AFOREMENTIONEQ LAND AREA HAS BEEN �0z� a ' o , „ ' - , � ` a - T � - - - - , <br /> Y a ' 2�� N89 59 35 W 199 128.8 35.0� � <br /> APPROPRIATELY PROTECTED OR STABIUZED. <br /> _ a <br /> � a. NW CORNER WOOD ���E, SN�-� C'� F0�2 I��QU!lp� �E✓�181V. <br /> � 17. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNDISTURBED FOR NQ ` � FENCE Q.4' N. EXISTING RBC � <br /> = MORE THAN 2 DAYS FRQM OCTOBER 1 THROUGN APRlL 30, AND FOR NO MORE THAN 7 DAYS FROM CAUTION: EXISTING ACTIVE PATI� EAST END WOOD �S 11691 <br /> � MAY 1 THROUGH SEPTEMBER 3Q. FENCE 0.5' N. <br /> Q I' 0.14' S. & 0.02' W. EXISTING TACK/WASHER I <br /> � LS 11691 �- <br /> � <br /> I ; ' 0.�7' S_ & 5_Q' E_ � <br /> � STAN DARD DRAWINGS � <br /> � <br /> W <br /> � a nd D ETAI LS ( I <br /> � ooz� ERC�SION and PLAN APPR4I�ED <br /> 1. ALL EROSION AND SEDIMENT CON7ROL FAClUTIES SHALL BE W ACCORDANCE WITH THE <br /> SPECIFICATIONS AND STANDARD DRAWWGS SHOWN IN THE CURRENT GTY OF EVERETT SEDI�IENT CONTROL PLAN ag�} <br /> � DESIGN & CONSTRUCTION STANDARDS AND SPECIF�CATIQNS FOR DEVEL�PMENT - VOL 2, ����� p�� <br /> g SECTION 200, AVAILABLE ONLINE AT everettwa.�ov/211/Site-Development. SCALE: Ya"=1 '-0" <br /> � 2. SPECI�IC STANDARD DRAWINGS CALLED OUT IN THIS PLAN INCLUDE, BUT ARE NOT ���E ��� PflBIICWORKS � <br /> LIMITED T0, THE FOLLOWiNG: <br /> DEPARTMENT <br /> Q� STD DWG 201: CQNSTRUCTfON ENTRANCE RQCK PAD A � � ��� � <br /> w� � ��� ��� 5 S H E ETS � <br /> ER ANY CONSTRUCTION ON THIS <br /> � STD DWG 209: INLET BLOCK & GRAVEL FILTER veo�cr, novaovu. Fort �+rs ` <br /> X STD DWG 212: INLET FABRIC FENGE FILTER _,_._._. v��er ts ca+nmo�a►� vER <br /> � STD DWG 214: TEMPORARY SILT FENCE CALL 3 WORKING DAYS BEFORE YOU DIG �F �'�" ��Cj7�STAND_"R°�� <br /> � <br /> m f �� 1-�oa-424-5555 �N�Fti. . <br /> /ERMIf fOR�COt�5TA1UUC�'RON NAS <br /> o �x UTILITIES UNQERGRpUND LOCATI4N CENTER � E� <br /> '` (ID,MT,ND,OR,WA) <br /> � <br /> O : - ELECTRIG-ftED SEWER-GREEN GAS101L-YELLOW SURVEY- <br /> w SCALE OF ORIGINAL DRAWING SAFETYPRECAUTIONSHALLBElMPLEMENTED6Y P�NKTEL/CATV•ORANGE PROPOSED•WHITE WATER-BLUE <br /> � D O_Jr 1.O 1.5 IliCheS CONTRACTOR{SjFlTALLTRENCHiNGINACCQRpANCE <br /> wnn�+cuaRENros�srnr�oaRos 7740 196th Ave NE (Historic Red Brick Rd) ��"�� ��Cz\���� <br /> � P.O. BOX 2758 1� L{ � u I <br /> REDMOND, WA 98073-2758 AZIZ Engineering Company � . <br /> 425.898.1007 fax 425.898.9699 info@aziznw.com <br />