My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/02/13 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/02/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:45:02 AM
Creation date
11/6/2019 9:43:47 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/13/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Call for Bids for the Briefing COUNCIL BILL# <br /> construction of Lift Station 24 Proposed Action Originating Department PW/Utilities <br /> Forcemain Replacement— Consent Contact Person Richard Hefti <br /> Silver Way Segment Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF 2/13/2013 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Outside of City Limits in None None PW <br /> Silver Way—from <br /> junction of 120th St SE to <br /> south of 119th St SE.. <br /> Amount Budgeted $180,000 <br /> Expenditure Required $2,000 Account Number(s): UP 3534 <br /> Budget Remaining $178,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Lift Station 24 Forcemain Replacement—Silver Way Segment consists of replacing approximately 200 <br /> feet of existing 20-inch diameter forcemain. The project limits are from the new forcemain at the junction of <br /> 120th St SE and Silver Way,northerly along Silver Way to just past a Snohomish County culvert replacement <br /> project scheduled for this August. The City's existing sewer forcemain conflicts with the Snohomish County <br /> project requiring the City's forcemain to be installed deeper to avoid the conflict. The existing forcemain <br /> along Silver Way is planned to be kept for use as a back-up forcemain for Lift Station 24. <br /> The project is ready to advertise for construction bids. There are no supplemental bidder requirements <br /> associated with this project. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of Lift Station 24 Forcemain Replacement—Silver Way <br /> Segment. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.