|
G�N�R�L 1�OTE5 ���YI�4TION5 i'�0.1�GT D,4TA� PROJ�GT 1��T�
<br /> SYNBOLS: L.F. LINEAR POOT, LINEA�L FT. Np,N� pF pRp.�GT: SNOHOMISH GOUNTY OV�ER: MEGHANIGaL. E1�161N�R: STRUGTURAL EN611�R: G��I `t�`./ I �
<br /> I. AII cor�struction shall comply with the 2015 IBG as revised and adopted by the G(ty � a� � �-���"��� EVERETT GARh�61E RESTORATIOK SKOHOMISH GOUNTY HARGIS EN6INEFRS BYKOI�N GARTER QUINN �U I �� I ��
<br /> of Everett, Washington 5tate Energy Gode, QPiC� QII A�IIGAI�I9 IOGQI GOC�65, WINDOW REPLAG�MENT 3000 ROGKE�LLER AVE. 1201 THIRD ftV�E, 5UI'TE 600 820 JOHN STREET#201
<br /> [ AN6LE MAS MASONRY EVERETT, WA q8201 SEATTL�, WA q8101 SEATTI.E, Wa a810�t ������
<br /> ordinances and standards. E GENT�R LINE MpVC MAXIi�i PRO.EGT LOGATION: 3001 OAKES AYE. �AX: (206) 448-4450 (206) 264"f'184
<br /> o CAPYRI6HT M.B.S. N�TAL BUILDII�5 SUPPLIER EYERETT, WA q8201
<br /> 2. The cont�a�tor shall maintain in good condition,one complete set of pians v�ith ail o P�IONE: (206) 448-33�6 GONTAGT: ANDY QUINN
<br /> revisions, addenda, and change order�, on the pram(s�s at al I times. q� DI� i�fEZZ MEZZANINE 60V�RNIN6 AUTHORITY: GITY OP �VERET(' GONTaGT: ANDREYV GLA6EIT I ���o� /����T
<br /> 3. Gontractor to coordinate hasi of cor�struction with the bufldi owners to = E��- � ��- 60VERNIN6 GODE: 2015 I.B.G. A5 ADOPTED BY THE GITY OF EYERETT �(
<br /> P "9 '�J > 6RE�4TER THAN MF6 MAt�1FAGTURIN6 ARGHITEGT: �EGTRIGAL E�IN�R:
<br /> coordinate material storage,access to cmd from the work, timing oP work, 5p6GIA) � � ,�AN � ���,�R ENERbY GODE: 2015 INTERNATIONAL ENER6YGON5�RVATION GODP GAPITAI.. ARGHI'TEGTS 6ROUP HAR615 EN6INEERS �OO I 0���� ���.
<br /> consideratior�s of noisy operations, intercuption of inechcmical and electricai # � � �f{p� AIR QUALITY GODE: 2015 VENTILATION �ND INDOOR AIR QUALITY GODE. 2813 ROGKE�LLER AYE. 1201 THIRD AYEt�1E, SUITE 600
<br /> sarvices, otc. I^I /� �j.,
<br /> �, p���,� MIN MINIh�R1M EVERETT, WA 98201 5E,4TTLE,WA q8101 �V�i��TT� i' `4l"� �CJ 2 0�
<br /> 4. Gont�actor is to verif all existi conditions,dim�nsions,details, etc., and notff the t PLU51MIt�115 MISG MISG�L.LAN�OUS ZONIN6: B3 - GEAITRAL 8U51NE55 DISTRtGT FAX: (425) 31'1-848q �AX: (206) 448-4450
<br /> y � y M.O. MA50NRY OP�NtNb PHOI�: (425) 317-801� QHONE: (206) 44�-3376
<br /> Architect of ar� and all discrepancies prior to proceoding with the work. R �� M.R. MOISTURE RE515TANT ���TION TYi'E: Y-N = Y-B GONTAGT: SANDRA ALDER GONTAGT: DOU6 51/�
<br /> 5. AII ftams m�ked "N.I.G" are not pc�t of this contract unles� otherrvise noted. ABBREYIATIOIJS: NIG t�IOT IN GONTRAGT NUMB�R OP STORIES: 2 U � � �-,�.����,��,,,,,� ,,,
<br /> ABF. Al(�6E BUILDIN6 NOM NOMINAL , „ a 4,,+ '� �+�
<br /> SUILDIN6 IiE16HT: APi'ROX. 33-�t FROM 5.0.6. TO TOP OF PARA�PET ��'����i�
<br /> 6. AII work shall be appiled in accordance with tha marwfacturers lateat �LEVATION NT5 NOT TO SGALE i�'�'';� , ,
<br /> recommandation or written diractior�. A/G AIR GONDITIOt�R 4G ON GENTER OGGI�'ANGY: BUSIt�55 6ROUP 8 �U I Ll�I NG �R�A� G1�1.GULA�TI ON5 � '
<br /> ADJ AD.�JSTABI.�, ADJAGENT O.�f. CN�ERHEAD ►-
<br /> 1. Do not scale ck�awings;dimensions govarn. Tha contractor shall notify P�rchitact ADMIN ADMINISTRATION �' �'��T� PARGEL �: 0043a0'i1400100 O .. � ;
<br /> immad(atoly of any cmd ali discrepcmcies. A�F ABOVE �INI5H �LOOR o/ 0� EXISTII�l6 AREA �R 1.EVEL 5p3�t 5F � ���������
<br /> A P 6 ,4 8 0 1/� �I N I S H 6 R A D P (P 1 fl R O P. f'R O P 0 5 E D L O N�R L E Y E L 5A 2'I 5 F >
<br /> ,4l.UM ALUMIt�pJM PERP P�RP�ND�UILAR TOTAL �XI5TIN6 AREA IOpbb 5F �
<br /> 8. Atl dimensions are to faca of stud or canterline of colunm, or face of concreto D R;�W I N G I N I��X (M O G H A i� T O E X I 5 T I N 6 A R E,� � � �
<br /> work unlass otharwlse noted. ANOD a M ODI Z E D P l- P L A 1'�,
<br /> APPROX APPROXIMATE P-LAM PLASTIG 1.A�MINATE �
<br /> ARGHiTEGTUR,4L
<br /> q. W�en cle�- dimensions are noted (GLW they rePer to clearance from finished p`�-T p`�-�N'°`'� PLUMB QLUMBINC' �
<br /> surfaces. A5R R�-OMATIG S P RIN K L�R PROJ QPR4.�GTAPRO.�GTED A-I.O GO�, DRAWIN6 INDEX, 6ENERAL 1�lOTE5 l���RR�D 5UBM1 TT�1..5 �� �
<br /> AV6 AYERaG� PRV PR�SSURE REDUGIN6 VAI..1(E A-12 LON�R �LOOR GODE SH�T �. �
<br /> 10. Wiere construction details ara not shown or notad Por any part oP the work, the g� g�„OW PINISH FLOOR PT POINT A-1.3 UPP�R �LOOR GODF SFI�T � �L
<br /> cietails shail be th�e same as for other s(milar work If aue�tions cannot be resolved gpG B�LOW FINISFf 6�RADE aTR QUARTER MEGHANIGAL, ELEGTRIGAL d PLUNBIN6 P�RMIT A5 M�LL A5 � 1
<br /> in this mannar, contact the ,4�chitact prior to proceeding with the work. g�6 BUII.DIN6 R RADIUS A-2.0 A5-BUILT/DPMO LOV�R FLOOR PLAN �RGY ANALY515 TO BP SUBMITTED AT A 1..aTER DATE. `.�
<br /> II. There shall be no deviations whatsoeve� from the contract documents without the B•O. BOTTOM OF � �F ��N A-2.Oa A5-BUILT/DEh10 1.OY�R FLOOR P�iOT05
<br /> Architacts written approvai thareof. The Gontractor agrees to dsfend indemnify � ��OM �- �`Ix��� A-2.Ob A5-SUILTlDEMO 1.0Y�R FLOOR PHOTOS ��I� ���}�������� ��/�
<br /> BTW B�TN�EN REG'D REGEIV�D A-2.1 A5-SUILT/DPMO LOY�R FLOOR RGP G,� '�^pY
<br /> and hold tha Architect harmless from cmy claims ariaing as a result of unc�proved GB GA�TGH BA51N R� REFRIGERATOR, A-2.1a A5-BUILT/D�MO LOY�R FLOOR RGP PtiOT05 �.I�� �� I XJt`l� �������' �� ����I
<br /> changes. G.I. GAST IRON REPEREWGE A-2.2 AS-BUiLT/DEMO UPP�R FLOOR PLAN
<br /> GIP GAST IN PLAGE REII� REINFORGING A-2.2a A5-BUILT/D�MO UPPER FLOOR PHOT05 �f�0��: ���.�I�7.��I�1
<br /> 12. Nhero devices or it�ms or parts thereof �^o reforrod to in sir�lar, it ia int.�ndad ;��: �,�� ��� g�I.��
<br /> GJ GONTROL JOINT REGt'D REGZUIRED A-2.3 A5-BUILT/DPMO UPP�R FLOOR RGP
<br /> that such shall appiy to as many such devicas, items or parts as are raquired to ' I. 51TE
<br /> properly complota tha work. GONSTRUGTION JOINT RR RESTROOM A-2.�+ A5-BUILT/DEMO UPPER�LOOR RGP PtiOT05 q,. ��p�,�� qpA AGGE55
<br /> GNN GONGRETE MA501�Y UNiT 1Z4 ROUGFf OPEN�N6 A-2.4 A5-BUILT ATTIG FLOOR PLAN
<br /> GOL GOLUMN ROW PUBLIG RIGHT OF WAY A-2.5 A5-BUILT ROOP PLAN
<br /> 13. It shail ba tha responsibility of the Gontractor to locate all exi�ting util�ties whether 2. DEMOLITtON
<br /> GONG GONGRETE S.A.M. SELF ADHF511/� MENtBRANE A-2.6 f'ROP05FD LOYVER FLOOR PLAN
<br /> shor� hereon or not and to protact tham Prom damage. The Gontractor shali becx� �NT �x.�.�� �� ��� A. LOV�R�LOOR
<br /> A-2.'T PROP05ED UPPER FLOOR PLAN
<br /> all expansa of rapair or raplacement of utilitias or othar proporty damaged by � p12�NKIN6 FOUNTAIN 5G 50LID GORE I. ALL 5PRINKLER BRANGH LINES AND FIFAD5 CA R N E G I E ����� ��� ' L I B R A RIT
<br /> operatioris in con)unctfon with the oxecution of th(s work. D5 DOY�OUT 5D STORM DRAIN A-2.8 PROP05ED ATTIG AGG�55 PLOOR PLAN II. ALL HVAG "�
<br /> DWG DRAWING 5F SQUARE �OOTA6E, �T A-3.0 NORTH/NEST�LENATIONS III. STAIRS FveRETr•csTn i9os
<br /> 14. Tha Gontractor will verify and conform to ail reqyirements of all utility companias. IV. PWMBIl�b6 AT 5W WALL
<br /> (�, PXIST. EXI5TIN6 GONDITION `� 5APETY 6LA55 A3.1 EAST/50UTFi �LEYATION5 Y. A L L R E M A I N I N 6 P L U M B I i�t S
<br /> 15. AII dekxis shall be removed from remises and all c�ea� shall be IePt in a clecm �` �`� � � A-32 BUILDIN6 SEGTION NORTH-SOUTH VI. REfER TO �L.EGTRIGAL PLANS �OR ANY ELEGTRIGPJ.. PA1�El. RELOGaTIONS
<br /> p �LEY EL�1(ATION,El.E1/ATOR 5tM SIMILAR A-3.3 BUILDIN6 SEGTION YVEST-EAST
<br /> (broorr� condition at all timeg. PLEG ELEGTRIGAL St'EG SP�GIFIGATION Vli. LOW YOLTA6P REMOVAL
<br /> � �A� B. MAIN PLOOR
<br /> E.J EXPAN510N JOINT A-4.0 GONSTRUGTION WALL DFTaILS I. STaIRS
<br /> Ib. The Gontractor shall take ail necassary pre�autions to er�ure the eafety of the �Q F�q� 55 STAINLE55 5T�I.., A-4.1 GONSTRUGTION WINDOW DETAILS II. SPRINKLER BRANGH LINES AND HEADS
<br /> workers at all times. EXIST EXISTIt� 5,4N SANITARY 5PY�R
<br /> A-42 GONSTRUGTION WINDOW DETAII.S III. EXISTII� INTERIOR DOORS AT STORA6E aREA�S AND STAIRS
<br /> E.J EXPAN510N JOINT STD 5TANDARD A-4.3 WAJ.L A�55FMBLIPS G. ATTIG L�VEVROOF LEVEL
<br /> 17. Tha Gontractor shall ba responsiblo for tha complete searfty of tho building and EXp EXPAN510N 5�- ST�- A-4.4 INT�RIOR STaiRS: A5�8UILTfiEMO I. REMOYE DUGTWORK A5 DIREGT�D ON M/AG PLA�lS
<br /> site whlle the)ob is fn progress. � �R�pR STRUGT STRUGTI�E, STRUGTURAL A-4.� INTERIOR STAIRS: f'ROP05FD PLANS
<br /> F.G.I.G. FURNISFf BY GONTRAGTOR, •`� ��m A-4.6 INTERIOR STAIRS: PROP05PD DETAILS 3. LON�R �LODR PLAN
<br /> 18. AII work shall be guarc�teed for a period of one (I) yec� after completion, unlesa INSTALL BY GONTRAGTOR SY5 5Y5TEM A-4,"1 INT�RIOR STaIRS: STRUGTURAL NOTES a. �LOOR PLAN�R HUMAN SERYIGES PR06RAM
<br /> otharr�isa �pe�ified, and shall be go stated in Gontractor's wrltten proposal and �D FLOOR DRAIN T ����� T�' B. i'RDYIDP GL05ET FOR RISER ROOM
<br /> agreamar�t. AII rapair�, correctfon�, d(scrapc�cias,otc.,must be made without ariy FDN POUNDATION T�B TOP � 80TTOM A-5.0 PROPOSED LON�R FLOOR RGP
<br /> additional cost to the Owner,and within five (5) days aPter notfce is given. FF FINISH FLOOR �- �� A-5.1 PROPOSED UPPER FLOOR RGP G. PROYIDE IT ROOM WITH G1.�aRANGES FOR INDIGaTED ELEGTRIGaL PANEL REI.OGATION
<br /> 'I�Mi' T1E1��IP�RED A-�2 5U5PENDED GEILIN6 DETaILS D. �RAME STAIR TO MAIN FLOOR
<br /> P.O.I.O. WRNI5HED BY OWNER, E. RESTROOMS,I.OGK�R ROOM, TRA�ININ6 ROOM � INTERYI�YV ROOMS
<br /> 19. AII oparations conductad on the pramisas shall not be ob�ectlonable bayond tha INSTALLED BY OY�IER T46 TOi�E b 6R0011� �. �GRE55 LI6FfTll�l6 AND EXIT 516N5
<br /> property boundary lines by reason of noise, stecun, odor, umss, gasas, smoka, PEG PIRE EXTIN6UI5HER GABINET TG � 6LA55 A-6.0 UPPER �LOOR MENS RESTROOM 6. EL.EGTRIGAL P�R Plr4N
<br /> vibrations,hazard or other causes. F.O.I.G. WRNISH�D BY OWN�R, T.O. TOP OF
<br /> IN5TALLED BY GONTRAGTOR TYP TYPIG�1l. A-b.l UPPER �LOOR WON�N'S RESTROOM
<br /> H. �IRE �CTIN6UI5FI�R5 AND PULLS PER PLAN
<br /> A-6.2 UPPER �LOOR EMPLOYEES RESTROOM I. Si'RINKLER 5Y5TEM AND FIRE ALARM PANEL
<br /> 20. AII dowrispouts, footing c�d fovndation drawings ghall cormect to tha storm drainage FT6 �OOTIN6 ��� ���-�N A-6.3 LOV�R �LOOR MENS RESTROOM
<br /> system. 6A 6AU6P U.N.O. UNLE55 NOT�D OTi�iPRW15F A-6.4 LOV�R FLOOR WOMENS RESTROOM
<br /> 6,4LV GALVANIZED VGT VINYL GOMP051TION TII.� 4. MAIN �LOOR PLAN
<br /> 21. AII wood mambara in contact with concrets shall ba prassura treatad. 6G GENERAL GONTRAGTOR VERT VERTIGAL A-'1.0 INTERIOR ELEYATION: TRAININ6 ROOM A212 A. �LOOR PLAN P�R F�JMAN SERVIGP5 PROC�RAM
<br /> 6N� 6YP�.�I1M WaLL80,4RD w� W�'� A-'f.l INTERIOR �LF/ATION: TR,4INING ROOM A203 B. RESTORATION OF YESTI�ULE
<br /> 22. AII metal fasteners to be of tho same material as the metals used for flashing �tc. H HI6H, fiEI6HT w�o W�T� A-'t2 INTERIOR �YATION: �OYER � YESTIBULE G. RESTORATION OF INNER VESTIBULE DOORS
<br /> Wiara connaction of dissimilar material� occur,provi� adeqyata protection to HB H05E BIBB W-MAT YVALK OFF M,4T A-"t.3 INTERIOR �1.E1/ATION: KITGHFNETTE D. GUSTOM GONTROL DESK
<br /> prevant dotarioration. The protection shall (nclude,but not be limited to, an HM HOl.LOW t�TAL 1� WATERPROOF E. LIGFfTIN6 AND GEILIN65 PER ARGHITEGTURAL AND ELEGTRIGaL EN6INFER
<br /> insulation coat of bituminous paint batween all dissimilar mstals. HORIZ HORIZONTAL YVR WATER RE515TANT A-8.0 UPPER �LOOR GABII�TRY F. f'UBLIG RESTROOMS, STAFF RE55TRDOM,KITGHENETfE, ATTIG AGGE55 THROU6H JANITORS GL05ET
<br /> }{T }��� N62B YVATER RE515TANT BARRI�R A-S.I ALTERNATE: WINDOW TRIM DETAILS 6. STAIRS TO LOY�R FLOOR
<br /> 23. wail boc�d tems shall conform to the IBG. AII e ad sum board to INSUL INSULATION � �"���T A-82 DOOR TRIM DETAILS H. TRAININ6 ROOMS E DE-ESGALATION ROOM
<br /> �� � � 9� I. INSULATE EXTFRIOR WALLS,DRYY�4f�L.L,RIM .1015T GONTINUOUS INSULATION
<br /> have metal ed9es at alt �orners �d wall fntersections. Water-ras(stant �sum JT/JT5 JOINT,JOINTS � j"��� W�� � A-8.3 POYER MOLDIN6 DETAILS J. E6RE55 LI6FfTIN6 AND EJCIT SI6N5
<br /> bocrd shail be used in restrooms ca�d ali wet areas unless noted otherwise fn the L LON6,LE1�TH � � W�� F��G K. �LEGTRIGAL PER PLAN
<br /> plcros. LAM LAMINATE, LAMINAT�D A-�I.O DOOR SGHEDULE L. PIRE EXTIN6UI5F�R5 AND PULL5 PER PLAN
<br /> 24. AII glass a�d glazing shall comply with the I�G �d the U5 Pro�ct 5afety A-10.0 LONER FLOOR FLOORIN6 M. SPRINKLE-R 5Y5TEM AND FIRE ALARM PANEL
<br /> Gommis5lon. A-10.1 UI'PFR �1.00R PLOORIN6 5. ATTIG LEVEL s,so REGISTER�
<br /> 25. AII axtarior lass to meet tha ro uir�monts set Porth in tho Washi ton Stata �PPLIG�L� GOD�S A-10.3 LUPPER FLOOR flJRNi R� A. INSULATE EXT�RIOR WALLS AND R.00F _� HI�GT
<br /> 9 �l �9 B. REI..OGATION OF SUPPLY /4ND RETURN A5 DIREGTED BY MEGHANIGAL GONSULTANT � i �
<br /> 6�rgy Gode. i'rovlde screens on all operable w(ndor�s. G. OP�RaTIONAL SPRINKLER 5Y5TEM
<br /> 2 0 1 5 I N T E R N A T I O N A L B U I L D I N 6 G O D E M�GHaNIG�4L 5 A ` �
<br /> 26. The Gont�actor shall vsrffy all door c�d window rough openfng dimensions with door 2015 INT�RNATIONAL EXISTIN6 BUILDtN6 GOD� M-O.I I�GHANIGAL 1.EG�ND � SHEfT LIST 6. MEGHANIGAL srnre oF��Nsror,
<br /> c�d wir�dow mcuwfacturers. M-02 MEGHANIGAL ABBREY. d 6E�RAL NOTE5 A. 1AV�R P1.00R VENTILATION PER M�GHANIGAI.. GON�ULTANT
<br /> IGG/AN51 AII'1.1-200�t 5TANDARD �OR AGGE551BLE BUILDIN65 B. MaIN FLOOR HYAG PER MEGHANIGAL GON5ULT/�kNT
<br /> 2'1. Ail entrance doors shali hava a dead bolt or a daad latch with a mfnimum of I/2" 2015 INTERNATIONP�L MEGtfANIGAI.. GODE M-0.3 N�GHANIGAL SGHPDULES
<br /> 2014 NATIONAL �GTRIG GODE M-0.4 MEGHANIGAL SGHEDULES '1. EL.�GTRIGAL
<br /> 28. Post tha street address rn�mbers on the building(5� 50 QS t0 b6 Vi51b16 t0 �98 �7IIG. 2015 UNIFORM PLUMBIt� GODE MD-2.1 LOY�R LEVEL PLUMBIN6 FLOOR PLAN - D�MO A. �LEGTRIGAL AND LOW VOLTA6F P�R PI.AN AND OY�AVER REQUIREMENTS -rjG��...�: A5 NOT�D
<br /> N�nnbars shall ba legiblo Prom tha streat fronting tho proparty. Numbars shall 2015 INTERNATIONAI. PIRE GODE MD-22 UPP�R!_E1/�L PLUMBING FLOOR PLAN - DEMO B. OGGUPANGY 5�N50R5 THROU6HOUT
<br /> �ontrast with background fiold. AUTOMATIG FIRE DPTEGTION � SUPPR�55101V SY5TEM5 ORDINANG� MD-2.3 ATTIG LEVEL PLUMBIN6 FLOOR PL.�4N - DEMO ISSU� D�T�: OQ/OS/20I7
<br /> 2015 INTERNATIONAL ENER6Y GONSERYATION GODP MD32 UPPER J�1/EL HVAG FLOOR PLAN - DEMO a. ��I�
<br /> 2�i. Extar�or�olnts �ound window and door fra�ne,opentngs between wall c�d A. PUJMBIN6 f'ER GONSULTANT AND PLANS D��Y�I�I: 5G/ 5M
<br /> foundations, batwean walis and roof and betwaen wall panals, openings at 2015 WASHIN6TON 5TpTE �TtER,6Y GODE MD-3.3 ATTIG LEVEL HVAG PLOOR PLAN - DEMO B. GITY CANNEGTIONS GH�GKED: 5�1
<br /> panot�ations of utility service� sarvicos through r�alls, floors, and doors, c�►d all 2015 INT�RNATIONAL PROP�RTY MAINTENA1�lGE GODE MD-3.4 RDOP Pl.AN - DEMO
<br /> other such openings in the building ernelope shall be sealed, cca�lkad,gaskatad,or �TT 1�1UNIGIPAL GODE M-2.1 LOV�R L�L. PLUMBIN6 FLOOR PLAN Q. LOW VOLT,46E
<br /> weather stripped to 11mit air leakage and eliminate watar penotration. I. GAMERAS
<br /> M-22 UPPER 1.EVEL PLUMBIN6 FLAOR PLAN Oc TH15 PL.AN ?�ND D�SiGN 'S ?�ND R�MAINS
<br /> 2. PHONE/FA�X, WIRELE55 AGG�55 POINTS THE PROP�RTY O� THE ARGHITEGTS AND
<br /> 30. AII tec�s cmd)oints in batt insulatfon to be sealed with t�e. M-2.3 ATTIG L�1/EL PLUMBIN6 FLOOR PLAN 3. DIGITAL � F1.AT SGR�EEN5 MAY NOT �� US�� WIT�+O�T PRIOR
<br /> �N�RGY GOD� II`t�Ol�l_il'�TIO� M3.1 LOY�R LEVEL M/AG FLOOR P1.f4N GONS�NT �ROM THE ARGHIT�GT
<br /> 31. V�or barriar shall ba installed on the wc�m side of all exterior walia. M-32 UPP�R LtVEL HVAG PLOOR PLAN �A�
<br /> 32. Insulatton including facfngs shall have a maximum flame spread rating of 25 and a M-3.3 ATTIG LE1/EL HVaG PLOOR PL�4N r��
<br /> maxirr�m smoka density of 450 whsn tastad in accordamce wfth 18G 5tandards. 2015 WASIN6TON STAT��TlER6Y GODE TABLE G402.1.3 M-3.4 ROOF P1..AN PERMIT
<br /> GLIMATE ZOI�: 4L M-5.1 LON�R LEVEL. �IRE PROTEGTION PLOOR PLAN � � _
<br /> 33. Build shali c I with air leaka controi re uirements of the Washf ton 5tata ROOF: � �F��`'Y��"�
<br /> �^9 °^�y 9s a �J M-✓.2 UPP�R LEYEL �IRE PFtOT�GTION FLOOR PLAN ,� �,a���� �
<br /> Pnergy Gode. ATTIG AND OTHER: R-4�1 M-3.3 ATTIG L�1/EL PIRE PROTEGTION FLOOR PLAN �{; ,,-�,� �,�:c�,�,v�:xs.2� , RE1/. DA�TE '� DESGRIPTION
<br /> YVAU.S, A80VE 6RADE: E� {��� -- ---- �
<br /> 34. Go�actor shall comply with lightinglswftching and 11�hting power budgats as M-6.1 MEGHANIGAL DETAILS i DIa6RAM5 a+, ,�#,� ;
<br /> specified in the Washington 5tata Energy Gode. Gon�ractor shall submit�arvings for �"�': R�.�i M-'1.1 MEGHaNIGAL GONTROLS DIA6RAM5 d SEGtUPNGE OF OP. '� __ _____
<br /> reviaw and c�proval by the Gity of Evaratt and obtain al1 nacessary permlts. WOOD �MED: R-21 M-'12 MEGHANIGAL NOTES ��En a�±���� � (
<br /> NIALLS, BPLOW 6RADE: -
<br /> 35. Renovation:The contractor shall varify all �xisting conditions and dimensions before Ma55: R-q.5ci '�� �"����4X�*`� Y�`' '�
<br /> ELEGTRIGAL '�''�"` - -_. -
<br /> commencing cmy demolftlon. 5horing shall be installed to support existing yVppD FRAMED: R-21 `
<br /> �sa.,� ° � " � �
<br /> constructlon, c�d in a mamner suita�le to the work seqyance. Sawcutting axist(ng E-0.I ELPGTRIGA�L NOTES, ABBREYIATION5 � DRAWfNG IND�X c�,,�r=n5 « � --
<br /> reinforci shall be as directed ths ineer of record. Damolition debris shall �LOOR'` �'�•��"°
<br /> ^9 � '�9 hQ MA55: R-30c1 E-02 EL�GTRIGAL LE6END ;�
<br /> not be allowed to damage or overload the exfsting atructure. Limit constructlon E-0.3 ELEGTRIGaL LE6PND � �;
<br /> loading, (including demolltion debrf9) on � ex(sting fioor gysstem to 100 f'SF. The JOIST/�RAMIN6: R-30
<br /> contractor shall weatherfze existing structure during dsmolition and construction. SLAB-ON-6RADE PLOORS: ED-3.1 LOY�R L.EVEL POY�R DEMO FLDOR PLAN � ' �'�,�����`� � � GO��fi� Sf���T
<br /> The cont�actor Is responsibla for ma(r�ta(ning weathar protaction cmd wtll raplace UNHFATED 5LAB5: R-10 POR 24" BELOW E-2.OR LI6HTIN6 GONTROL ZOh� PLAN � �� � ,y � �
<br /> and/or rostore to original condition any damages as a result of a breoch in �q�p �,qBS: R-!O PERIMETER AND UNDER EN'fIRE SLAB E-2.1 LOY'�R LEVEL LI6HTIN6 �LOOR PLAN ������� ���������}�` ; � � � -
<br /> weathar(zation. E-2.2 UPPER LEVEI.. LI6HTIN6 �LOOR PLAN ���.x ��y`���� ���`������ ' � � �
<br /> DOORS - TABLE G402.1.4: �
<br /> OPAGiIJ� 5WIN61N6: U-0.3'I P-3.1 LOY�R LE1/EL POY�R PLAN ���;"_�, `� `A����'����<������`�� �� � �y--
<br /> EXTERIOR WIi�OW - N�TAL GI.AD TABLE G303.1.3{I): E-32 UPPER LEVEL POV�R PLAN "° � � '`'� �' ;����' R �����i �``..,
<br /> � �� ,� �'r �
<br /> SIN61.E-PANE U-.� E-5.1 LOV�R LEVEL �IRE ALA�RM FLOOR PLAN , �� � �
<br /> DOUBLE-PANE U-.55 P-52 UF'PER L.EVEL FIRE ALARM �1.00R PLAN '
<br /> r =
<br /> .. ..
<br /> �.� ,
<br /> � ,� � � �� � , :�.`
<br /> E-6.1 LOY�R LEV�L. LOW VOLTA6E �LOOR PLAN � :
<br /> �. � ; . � � � � � � �- , �
<br /> E-6.2 UPPER !_EV�L LOW VOLTA6E PLOOR PLAN = � �� � �� �,��� � �� ,��.��� ��� � �
<br /> � � •
<br /> r���.�� �.�.�.��.�.��° � � � �,. � r e»
<br /> 3.�r�*'t �
<br /> P-9.1 ELEGTRIGAL DIAC�RAM � �
<br /> �-10.1 ELEGTRIGAL GfV..GS. 4 P�NEL SGHPDULES
<br />
|