T
<br /> = GENERAL NOTES C�OOR NOTES ELECTRICAL NOTES VENTILATION NOTES �/ENT _ NOTES , CONT' C�
<br /> z
<br /> � 1. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL, STATE AND LOCAL CODES. THE �, GLAZING IN DOORS AND LITES SHALL BE IN ACCORDANCE WITH IRC R308 FOR SAFETY GLAZING �• DEYICE LOCATIONS SHOWN ON THE ARCHITECTURAL DRAWINGS SHALL GOVERN OVER ELECTRICAL 1. WHOLE HOUSE VENTILATION TO CONFORM TO IRC SECTION M1507.3 9. MECHANICAL VENTILATION SYSTEMS IN BATHROOMS, LAUNDRY ROOMS AND SIMIIAR ROOMS SHALL
<br /> 1 CONTRACTOR SHALL COORDINATE AS REQUIRED WITH ALL CITY AND STATE AGENCIES, AND PROVIDE REQUIREMENTS DRAWINGS PROVIDED BY ELECTRICAL ENGINEERS, SUBCONTRACTORS, ETC. EXHAUST DIRECTLY TO THE EXTERIOR. OISCHARGE POINT OF EXHAUST AIR SHALL BE AT LEAST
<br /> REQUIRED PERMITS. ALL TESTS AND INSPECTIONS AS REQUIRED FOR THE PROJECT SHALL BE ` 2. WHOLE HOUSE FAN: REFER TO PLAN FOR LOCATION OF WHOLE HOUSE FAN. 3'-0" FROM ANY OPENING INTO THE BUILDING.
<br /> OBTAINED AND COORDINATED BY THE CONTRACTOR. 2. DOOR THRESHOLDS SHALL NOT EXCEED 1/2° MAXIMUM IN HEIGHT. 2. DO NOT LOCATE OUTLET/JUNCTION BOXES BACK TO BACK IN WALLS. -PROVIDE CONTINUOUS WHOI.E HOUSE FAN VENTILATION WITH MINIMUM CFM AIRFLOW AS
<br /> FOLLOWS: 10. ROOF VENTILATION: PROVIDE ROOF VENTILATION IN ACCORDANCE WITH IRC R806. NET FREE
<br /> 2. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL IABOR AND MATERIALS, EQUIPMENT 3. ALL ELECTRICAL OUTLETS, DEVICES AND APPURTENANCES SHALL BE LABELED AS AN APPROVED ITEM VENTILATING AREA SHALL BE 1/150 OF THE AREA OF THE VENTED SPACE IN ACCORDANCE WITH IRC
<br /> AND TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING NECESSARY FOR THE BY UNDERWRITERS LABORATORIES (UL) 75 CFM CONTINUOUS R806.2 (SEE ROOF PL.AN FOR CALCULATIONS),
<br /> EXECUTION OF THE WORK. BY SUBMITf1NG A PROPOSAL THE CONTRACTOR REPRESENTS THAT
<br /> THOROUGH EXAMINATION OF THE SITE AND ALL EXISTING CONDITIONS AND LIMITATIONS HAVE BEEN S + L Arct-�itects, LLC
<br /> MADE AND THAT THE CONTRACT OOCUMENTS HAVE BEEN EXAMINED IN COMPLETE DETAIL, AND THAT 4. CONDUIT PENEfRAT14NS THROUGH FIRE R,4TED WALL/CEIUNG/FLOOR ASSEMBLIES SHALL BE 3. M1507.3.2: CONTROL AND OPERATION OF WHOLE-HOUSE VENTILATION SHALL MEEf THE 2�3, '183rd Ava SE SnoM1omish g82so
<br /> IT IS DETERMINED BEYOND DOUBT THAT THE DRAWINGS, SPECIFICATIONS AND EXISTING CONDITIONS - D IN ACCORDANCE WITH LOCAL REGULATIONS. EQUIREMENTS PER 2015 IRC M1507.3.2
<br /> 360.563.�032 c206.890.8348
<br /> ARE SUFFICIENT, ADEQUATE AND SATISFACTORY FOR CONSTRUCTION OF THE WORK. WHERE MINOR
<br /> ADJUSTMENTS TO THE WORK ARE NECESSARY FOR THE PURPOSES OF FABRICATION AND 5. OUTLEfS AND OTHER ELECTRICAL DE1tICES SHALL BE LABELED AND/OR COLOR CODED IN -LOCATION OF CONTROLS. CONTROLS FOR ALL VENTILATION SYSTEMS SHALL BE READILY
<br /> INSTALLATION OF ITEMS, OR RESOLUTIONS OF CONFLICTS BETWEEN ITEMS, WITHIN THE INTENT OF G U A R C� RA 1 L N O T E S ACCORDANCE WITH STANDARD NEC REQUIREMENTS. ACCESSIBLE BY THE OCCUPANTS.
<br /> THE CONTRACT DOCUMENTS, THE CONTRACTOR SNALL MAKE SUCH ADJUSTMENTS AT NO ADDED 6. INSTALL ELECTRIC WALL HEATERS PER IRC CHAPTER 41, APPLIANCE INSTALLATION -INSTRUCTIONS. OPERATING INSTRUCTIONS FOR WHOLE-HOUSE VENTIlATION SYSTEMS SHALL BE
<br /> EXPENSE TO THE OWNER. WHERE SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR AESTHETIC PROVIDED TO THE OCCUPANT BY THE INSTAILER OF THE SYSTEM.
<br /> DESIGN OF THE WORK, THEY SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL. 1. CONSTRUCT GUARDRAILS IN ACCORDANCE WITH IRC R312
<br /> -LOCAL EXHAUST SYSTEMS. LOCAL EXHAUST SYSTEMS SHALL BE CONTROLLED BY MANUAL C L M
<br /> 3. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER, INCLUDING BUT NOT 2. TOP OF GUARDRAIL SHALL BE MINIMUM +36" A.F.F. SWITCHES, DEHUMIDISTATS, TIMERS, OR OTHER APPROVED MEANS. vv� E
<br /> LIMITED TO ARE4 FOR WORK, MATERIALS STORAGE, AND ACCESS TO AND FROM THE WORK, SPECIAL W I N p O W N O T E S C N O T E S �
<br /> CONDITIONS OR NOISY WORK, TIMING OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL 3. GUARDRAILS SHALL NOT HAVE OPENINGS FROM THE WALKING SURFACE TO THE REQUIRED GUARD -CONTINUOUS WHOLE-HOUSE VENTilATION SYSTEMS. CONTINUOUS WHOLE-HOUSE VENTILATION Property Solutions
<br /> SERVICES. NOISY OR DISRUPTIVE WORK SHALL BE SCHEDULED MINIMUM ONE (1) WEEK IN HEIGHT THAT ALLOWS PASSAGE OF A SPHERE 4" IN DIAMETER SYSTEMS SHALL OPERATE CONTINUOUSLY AND BE EQUIPPED WITH AN OVERRIDE CONTROL. A "FAN �, R503.1 GENERAL: ALTER,4TIONS TO ANY BUILDING OR STRUCTURE SHALL COMPLY WITH THE
<br /> ADVANCE OF THE TIME WORK IS TO COMMENCE. ON° SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. CONTROLS SHALL BE CAPABLE OF REQUIREMENTS OF THE CODE FOR NEW CONSTRUCTION. ALTERATIONS SHALL BE SUCH THAT THE
<br /> 4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS ON SITE AND NOTIFY ARCHITECT 4 TOP Rq�ILILS SHALL WITHSTAND A 200L6 LOAD APPUED IN ANY DIRECTION AT ANY POINT ON THE �. GLAZING PANELS SHALL BE IN ACCORDANCE WITH IRC R308 FOR SAfETY GLAZING REQUIREMENTS AND OPERATING THE VENTILATION SYSTEM WITNOUT ENERGIZING OTHER ENERGY-CONSUMING APPLIANCES. EXISTING BUILDING OR STRUCTURE IS NO LESS CONFORMING TO THE PROVISIONS OF THIS CODE
<br /> OF ANY DISCREPANCIES PRIOR TO START OF ANY WORK. COMMENCEMENT OF WORK CONSTITUTES LOCATIONS A CLEARLY VISIBLE LABEL SHALL BE AFFIXED TO THE CONTROLS THAT READS "NIHOLE HOUSE THAN THE EXISTING BUILDING OR STRUCTURE WAS PRIOR t0 THE ALTERATION. ALTERATIONS TO
<br /> ACCEPTANCE OF EXISTING CONDITIONS AND DRAWINGS AS CORRECT. VENTILATION (SEE OPERATING INSTRUCTIONS)." EXISTING BUILDING SHALL COMPLY WITH SECTION R503.1.1 THROUGH R503.2.
<br /> 2. EXTERIOR WINDOW U-FACTOR SHALL HAVE MINIMUM VALUE OF .28, PER IRC TABLE R402.1.1 All material appearing herein wns6tutes the unpublished and
<br /> 5. REFER TO INDICATED SCALES ON THE DRAWINGS. DO NOT SCALE DRAWINGS. -INTERMII?ENT WHOLE-HOUSE VENTILATION SYSTEMS, INTERMITTENT WHOLE-HOUSE VENTIlATION 2. R503.1.1 BUILDING ENVELOPE: BUILDING ENVELOPE ASSEMBLIES THAT ARE PART OF THE ALTERATION originalworkoftheArchitedandmaynotbedupiicated,
<br /> SYSTEMS SHALL COMPLY WITH THE FOLLOWING: SHALL COMPLY WITH SECTION R402.1.1 OR R402.1.4, SECTIONS R402.2.1 THROUGH R402.2.11, used,adisclosedvrithoutthewrittenconsentoftheArchitect.
<br /> 3. EGRESS WINDOWS: R402.3.1, R402.3.2, R402.4.3 AND R402.4.4.
<br /> 6. ALL FLOORS SHALL BE LEVEL AND NOT VARY MORE THAN 1/4" IN 10'-Op. -THEY SHALL 8E CAPABLE OF OPERATING INTERMITTENTLY AND CONTINUOUSLY.
<br /> Architect Stamp:
<br /> 7. ALL MATERIALS INDICATED TO MATCH EXISTING SHALL REFLECT THE SIZE, SHAPE, COLOR, TEXTURE,
<br /> I N I S H N O T E S ALL EGRESS WINDOWS SHALL COMPLY WITH IRC R310. EXCEPTIONS:
<br /> PATTERN, QUALITY AND METHOD OF INSTALLATION OF THE ORIGINAL MATERIAL. -THEY SHALL HAVE CONTROLS CAPABLE OF OPERATING THE EXHAUST FANS, FORCED-AIR
<br /> MINIMUM OPENING: OPENINGS SHALL NOT BE LESS THAN 5.7 S.F., WHERE MINIMUM CLEAR HEIGHT IS SYSTEM FANS, OR SUPPLY FANS WITHOUT ENERGIZING OTHER ENERGY-CONSUMING 1. STORM WINDOWS INSTALLED OVER EXISTING FENESTRATION. szsa REGISTERED
<br /> t. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING THE SUB-SURFACE IN ACCORDANCE WITH THE 24 AND MINIMUM CLEAR WIDTH IS 20 . APPLIANCES
<br /> 8. CONTRACTOR SHALL REPLACE ANY AND ALL EXISTING FIRE-PROOFING THAT IS REMOVED DAMAGED 2. EXISTING CEILING WALL OR FLOOR CAVITIES EXPOSED DURING CONSTRUCTION
<br /> ' FINISH PRODUCT'S MANUFACTURER RECOMMENDATIONS PRIOR TO INSTALLATION OF SAID FlNISH ' ARCHITECT
<br /> OR OTHERWISE DISRUPTED AS PART OF THE WORK. LEVEL OF FIRE PROTECTION SHALL MATCH PROVIDED THAT THESE CAVITIES ARE FILLED WITH INSULATION. 2 x 4 FRAMED WALLS
<br /> EXISTING, OR AS DIRECTED BY THE GOVERNING AGENCY'S INSPECTOR. MATERIAL. THIS SHALL INCLUDE BUT IS NOT LIMITED TO LEVELING FLOOR SURFACES TO ACCEPT SILL HEIGHT: SILL HEIGHT SHALL BE LESS THAN 44° A.F.F. -THE SYSTEM SHALL BE DESIGNED SO THAT IT CAN OPERATE AUTOMATICALLY BASED ON THE SHALL BE INSULATED TO A MINIMUM OF R-15 AND 2 x 6 FRAMED WALLS SHALL BE
<br /> NEW FINISH FLOOR, PROVIDING LEVEL 5 FlNISH FOR DIRECT-APPLIED WALL FINISH, PRIMING WALL TYPE OF CONTROL TIMER INSTALLED. INSULATED TO A MINIMUM OF R-21.
<br /> SURFACE TO ACCEPT NEW PAINT ETC. 3. CONSTRUCTION WHERE THE EXISTING ROOF, WALL OR FLOOR CAVITY IS NOT EXPOSED. HiNraRo c
<br /> 9. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING AND MAINTAINING SAFETY BARRIERS ' 4• PROVIDE WINDOW FALL PROTECTION PER R312.2 AND R312.2.2 (FOR EGRESS WINDOWS) -THE INTERMITfENT MECHANICAL VENTILATION SYSTEM SHALL OPERATE AT LEAST ONE HOUR 4. ROOF RECOVER STATE OF WASHINGTON
<br /> BETWEEN THE PROJECT AREA AND ANY EXISTING OCCUPIED SPACES. 2. WHERE FlNISH PLANS INDICATE PAINTED SURFACE, PROVIDE MINiMUM (1) COAT OF COMPATIBLE OUT OF EVERY FOUR. 5. ROOFS WITHOUT INSULATION IN THE CAVITY AND WHERE THE SHEATHING OR
<br /> PRIMER AND 2 COATS OF FlNISH PAINT WINDOW OPENING CONTROL OEVICES SHALL COMPLY WITH ASTM F2090. THE WINDOW OPENING
<br /> 10. CONTRACTOR SHALL REPLACE OR REPAIR ANY EXISTING SURFACES, FINISHES, APPURTENANCE, ETC. � � CONTROL DEVICE, AFTER OPERATION TO RELEASE THE CONTROL DEVICE ALLOWING THE WINDOW TO INSULATION IS EXPOSED DURING REROOFING, SNALL BE INSULATED EITHER ABOVE OR
<br /> NOT SCHEDULED FOR REMOVAL, MODIFICATION OR OTHER CONSTRUCTION WORK DAMAGEO DURING FULLY OPEN, SHALL NOT REDUCE THE NET CLEAR OPENING AREA OF THE WINDOW UNIT TO LESS THAT -THE SYSTEM SHALL HAVE A MANUAL CONTROL AND AUTOMATIC CONTROL, SUCH AS A BELOW THE SHEATHING.
<br /> CONSTRUCTION. DAMAGED SURFACES, FINISHES AND APPURTENANCES SHALL BE CORRECTED AS 3. ALL FlNISH MATERIAL SHALL BE IN CONFORMANCE WITH IBC CHAPTER S, INTERIOR FINISHES FOR THE AREA REQUIRED BY SECTION R310.2.1. 24-HOUR CLOCK TIMER. 6. SURFACE-APPLIED WINDOW FILM INSTALLED ON EXISTING SINGLE PANE FENESTRATION Project Title:
<br /> FLAME SPREAD, SMOKE DEVELOPMENT, ETC. ASSEMBLIES TO REDUCE SOLAR HEAT GAIN PROVIDED THE CODE QOES NOT REQUIRE
<br /> DIRECTED BY THE ARCHITECT AT NO ADDITIONAL EXPENSE TO THE OWNER. -AT THE TIME OF FINAL INSPECTION, THE AUTOMATIC CONTROL SNALL BE SET TO OPERATE THE GLAZING FENESTRATION TO BE REPLACED.
<br /> 11. MECHANICAL AND ELECTRICAL TO BE DESIGNED BY OTHERS. ALL CIRCUITING COORDINATION TO BE 4• �PET INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CARPET AND 5. PRQVIDE WINDOW FALL PROTECTION PER R312.2 THE WHOIE-HOUSE FAN ACCORDING TO THE SCHEDULE USED TO CALCULATE THE
<br /> BY OTHERS. ANY MECHANICAL AND ELECTRICAL ITEMS SHOWN ON THE DRAWINGS ARE FOR RUG INSTITUTE'S STANDARDS WHOLE-HOUSE FAN SIZING. 3. R503.1.1.1 REPLACEMENT FENESTRATION: WHERE SOME OR ALL OF AN EXISTING FENESTRATION UNIT
<br /> INFORMATIONAL PURPOSES ONLY IN DWELLING UNITS, WHERE THE TOP OF THE SILL OF AN OPERABLE WINDOW OPENING IS LOCATED IS REPLACED WITH A NEW fENESTRATION PRODUCT, INCLUDING SASH AND GLAZING, THE
<br /> 5. TILES SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF CERAMIC TILE INSTITUTE LESS THAN 24" ABOVE THE FINISH FLOOR AND GREATER THAN 72° ABOVE THE FlNISH GRADE OR OTHER -A IABEL SHALL BE AFFIXED TO THE CONTROL THAT READS "WHOLE HOUSE VENTILATION REPIACEMENT FENESTRATION UNIT SHALL MEEf THE APPLICABLE REQUIREMENTS FOR U-FACTOR AND
<br /> 12. ALL PERMITS INCLUDING FIRE, MECHANICAL, PLUMBING AND ELECTRICAL SHALL BE OBTAINED OF AMERICA'S STANDARDS SURFACE BELOW ON THE EXTERIOR OF THE BUILDING. THE OPERABLE WINDOW SHALL COMPLY WITH (SEE OPERATING INSTRUCTIONS)." SHGC IN TABLE R402.1.1.
<br /> SEPARATELY. ONE OF THE FOLLOWING: 4$'IO RESIDENCE
<br /> 6. UNLESS INDICATED OTHERWISE ON THE PLANS, CNANGES IN FLOOR MATERIAL THAT OCCUR UNDER � 4. M1507.3.2.1: OPERATING INSTRUCTIONS. INSTALLER SHALL PROVIDED THE MANUFACTURER'S 4. R503.1.2 HEATING AND COOLING SYSTEMS: NEW HEATING, COOLING AND OUCT SYSTEMS THAT ARE R .
<br /> 13. PRIOR TO COMMENCEMENT OF WORK ON SLAB-ON-GRADE SURFACES, CONTRACTOR SHALL PERFORM DOORWAYS SHALL BE LOCATED AT THE CENTERLINE OF THE DOOR IN THE CLOSED POSITION A. OPERABLE WINDOWS WITH OPENINGS THAT WILL NOT ALLOW A 4 DIAMEfER SPHERE TO PASS INSTALLATION, OPERATING INSTRUCTIONS, AND A WHOLE-HOUSE VENTILATION SYSTEM OPERATION PART OF THE ALTERATION SHALL COMPLY WITH SECTIONS R403.1, R403.2, R403.3 AND R403.s. E MODEL
<br /> A MOISTURE TEST TO DETERMINE ANY MOISTURE EMISSIONS FROM THE SIAB. CONTRACTOR SHALL THROUGH THE OPENING WHERE THE OPENING IS IN ITS LARGEST OPENING POSITION DESCRIPTION.
<br /> NOTIFY ARCHITECT OF THE RESULTS OF THE TEST PRIOR TO START OF ANY WORK. AT MINIMUM, 5. R503.1.4 LIGHTING: NEW LIGHTING SYSTEMS THAT ARE PART OF THE ALTERATION SHALL COMPLY WITH
<br /> TESTS SHALL CONSIST OF A CALCIUM CHLORIDE TEST OF 1,000 S.F. AREAS AS DESCRIBED IN THE B. OPERABLE WINDOWS THAT ARE PROVIDED WITH WINDOW FALL PREVENTION DEVICES THAT COMPLY 5. M1507.3.3: MECHANICAL VENTILATION RATE. THE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM SECTION R404.1
<br /> CURRENT ASTM STANDARDS. WITH ASTM F2090. SHALL PROVIDE OUTDOOR AIR AT A CONTINUOUS RATE OF NOT LESS THAN THAT DETERMINED IN
<br /> ACCORDANCE WITH TABLE M1507.3.3(2). EXCEPTION:
<br /> 14. NOTIFY IN WRITING OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND EXISTING CONDITIONS. C. OPERABLE WINDOWS THAT ARE PROVIDED WITH WINDOW OPENING CONTROL DEVICES THAT COMPLY
<br /> WITH SECTION R312.2.2. -EXCEPTION: THE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM IS PERMITTED TO �• AI-TERATIONS THAT REPLACE LESS THAN 50 PERCENT OF THE LUMINAIRES IN A SPACE,
<br /> 15. DIMENSIONS SHOWN ON PLANS THAT INDICATE DOOR LOCATIONS ARE DIMENSIONED TO INSIDE OF OPERATE INTERMITTENTLY WHERE THE SYSTEM HAS CONTROLS THAT ENABLE OPERATION FOR PROVIDED THAT SUCH ALTERATIONS DO NOT INCREASE THE INSTALLED INTERIOR "
<br /> THE DOOR JAM6, UNLESS NOTED OTHERWISE. WAT E R H EAT E R NOT LESS THAN 25 PERCENT OF EACH 4-HOUR SEGMENT AND THE VENTILATION RATE LIGHTING POWER.
<br /> PRESCRIBED IN TABLE M1507.3.3(1) IS MULTIPLIED BY THE FACTOR DETERMINED IN 6. R404.1 LIGHTING EQUIPMENT: A MINIMUM OF 75% OF LAMPS IN PERMANENTLY INSTALLED LIGHTING
<br /> 16. DIMENSIONS SHOWN ARE FROM FINISHED FACE OF WALL SURFACE TO FINISHED FACE OF WALL ACCORDANCE WITH TABLE M1507.3.3(2).
<br /> SURFACE, UNLESS NOTED OTHERWISE. 1. INSTALL WATER HEATERS PER IRC CHAPTER 28. THIS SHALL INCLUDE BUT IS NOT LIMITED TO FIXTURES SHALL BE HIGH-EFFICACY LAMPS.
<br /> SEISMIC STRAPPING, PIPING INSUUITION AND RELIEF REQUIREMENTS. 6. WHOLE HOUSE VENTIlATION USING EXHAUST FAN SHALL MEEf REQUIREMENTS PER SEGTION 7• A RESIDENTIAL ENERGY COMPLIANCE CERTIFICATE COMPLYING WITH R401.3 IS REQUIRED TO BE 4810 South 3rd Ave
<br /> 17. WHERE ELEMENTS ARE SHOWN AS "ALIGN", SUCH ELEMENTS SHALL BE LOCATED IN THE SAME M1507.3.4 2015 IRC COMPLETED BY THE DESIGN PROfESSIONAL OR BUILDER AND PERMANENTLY POSTED WITHIN 3' OF
<br /> P�E THE ELECTRICAL PANEL PRIOR TO FlNAL INSPECTION Everett WA 98203
<br /> -M1507.3.4.1: WHOLE HOUSE VENTILATION FANS. EXHAUST FANS PROVIDING WHOLE-HOUSE g, THE BUILDING SHALI BE TESTED AND VERIFIED AS HAVING AN AIR LEAKAGE RATE OF NOT EXCEEDING
<br /> 18. CONTRACTOR SHALL LABEL ALL NEW FIRE-RATED WALLS OF ANY TYPE IN ACCORDANCE WITH IBC VENTILATION SHALL HAVE A FLOW RATING AT 0.25 INCHES WATER GAUGE AS SPECIFIED IN TABLE 5 AIR CHANGES PER HOUR IN COMPLIANCE WITH WSEC R402.4.1.2
<br /> 703.6 M1507.3.3(1). MANUFACTURER'S FAN FLOW RATINGS SHALL BE DETERMINED ACCORDING TO I-M 916
<br /> 19. UNLESS NOTED OTHERWISE, ALL GYPSUM WALLBOARD WORK SHALL BE FlNISHED TO LEVEL 4
<br /> OR AMCA 210. 9. EACH DWELLING UNIT IS REQUIRED TO BE PROVIDED WITH AT LEAST ONE PROGRAMMABLE
<br /> CONDITIONS. -M1507.3.4.2: FAN NOISE. WHOLE-HOUSE FANS LOCATED 4 FEET OR LESS FROM THE INTERIOR THERMOSTAT FOR THE REGULATION OF TEMPERATURE PER WSEC 403.1.1.
<br /> GRILLE SHALL HAVE A SONE RATING OF 1.0 OR LESS MEASURED AT 0.1 INCHES WATER GAUGE. �0. MECHANICAL SYSTEM PIPING CAPABLE OF CARRYING fLUiDS ABOVE 100 DEGREES FAHRENHEIT OR
<br /> MANUFACTURER'S NOISE RATINGS SHALL BE DETERMINED AS PER HVI 915 (MARCH 2O09). R BELOW 55 DEGREES FAHRENHEIT SHALL BE INSUTATED TO A MINIMUM OF R-6 PER WSEC R403.3.
<br /> EMOTELY MOUNTED FANS SHALL BE ACOUSTICALLY ISOLATED FROM THE STRUCTURAL ELEMENTS OF
<br /> THE BUIIDING AND FROM ATTACHED DUCT WORK USING INSULATED FLEXIBLE DUCT OR OTHER
<br /> APPROVED MATERIAL.
<br /> -M1507.3.4.3: FAN CONTROLS. THE WHOLE-HOUSE VENTILATION FAN SHALL MEET THE �s$�a �ata: June Zo,9
<br /> REQUIREMENTS OF SECTION M1507.3.2 AND M1507.3.2.1.
<br /> -M1507.3.4.4: VENTILATION OPENINGS. EACH HABITABLE SPACE SHALL BE PROVIDED WITH PERMIT SET
<br /> OUTDOOR AIR INLETS OR OPERABLE WINDOWS WITH AN OPENABLE AREA NOT LESS THAN 4 SQUARE
<br /> INCHES OF NET FREE AREA OF OPENING FOR EACH 10 CFM OF OUTDOOR AIR REQUIRED BY TABLE Project Numbar: xx�cx
<br /> M1507.3.3(1). WHERE OUTDOOR AIR SUPPLIES ARE SEPARATED FROM EXHAUST POINTS BY DOORS,
<br /> PROVISIONS SHALL BE MADE TO ENSURE AIR FLOW BY INSTALLATION OF DISTRIBUTION DUCTS,
<br /> UNDERCUTTING DOORS, INSTALLATION OF GRILLES, TRANSOMS, OR SIMILAR MEANS. DOORS SHALL
<br /> BE UNDERCUT TO A MINIMUM OF 1/2 INCH ABOVE THE SURFACE OF THE FINISH FLOOR
<br /> COVERING. INDIVIDUAL ROOM OUTDOOR AIR INLEfS SHALL: RQ�;S;o„s:
<br /> 1. HAVE CONTROLIABLE AND SECURE OPENINGS; N�
<br /> 2. BE SLEEVED OR OTHERWISE DESIGNED SO AS NOT TO COMPROMISE THE THERMAL
<br /> PROPERTIES OF THE WALL OR WINDOW IN WHICH THE ARE PLACEO;
<br /> 3. ANY INLET OR COMBINATION OF INLETS WHICH PROVIDE 10 CFM AT 10 PASCALS ARE
<br /> DEEMED EQUIVALENT TO 4 SQUARE INCHES NET FREE AREA.
<br /> VENTILATION OPENING SHALL BE SCREENED OR OTHERWISE PROTECTED FROM ENTRY BY LEAVES OR
<br /> OTHER MATERIAL. OPENINGS SHALL BE CONTROLLABLE, SECURABLE AND SHALL BE DESIGNED TO
<br /> NOT COMPROMISE THE THERMAL PROPERTIES OF THE BUILDING ENVELOPE. VENTILATION OPENINGS �
<br /> SHALL BE LOCATED SO AS NOT TO TAKE AIR FROM THE FOLLOWING AREAS:
<br /> t. CLOSER THAN 10 FEET FROM AN APPLIANCE VENT OUTLET, UNLESS SUCH VENT OUTLET
<br /> IS 3 FEET ABOVE THE OUTDOOR AIR INLET.
<br /> 2. WHERE IT WILL PICK UP OBJECTIONABLE ODORS, FUMES OR FIAMMABLE VAPORS.
<br /> Sl�eet Contents:
<br /> 3. A HAZARDOUS OR UNSANITARY LOCATION.
<br /> 4. A ROOM OR SPACE HAVING ANY FUEL-BURNING APPLIANCES THEREIN.
<br /> 5. CLOSER THAN 10 FEEf FROM A VENT OPENING OF A PLUMBING DRAINAGE SYSTEM
<br /> UNLESS THE VENT OPENING IS AT LEAST 3 FEET ABOVE THE AIR INLET.
<br /> 6. ATTIC, CRAWL SPACES, OR GARAGES. G E N E RA L
<br /> 7. ASPHALT ROOFS UNLESS IT IS SHOWN THAT NO OTHER LOCATION IS PERMISSIBLE. IN N O T E S
<br /> SUCH CASES THE INLEt OPENING SHALL BE LOCATED A MINIMUM OF 2 FEET FROM THE
<br /> NEAREST SURFACE OF THE ASPHALT ROOFlNG, MEASURED FROM THE INTAKE OPENING.
<br /> 7. WHOIE HOUSE FAN SHALL BE CONTINUOS-OPERATION TYPE, WITH OPERATING EFFICIENCY OF .35
<br /> WATfS/CFM MAX.
<br /> sn@et:
<br /> 8. BASIS OF DESIGN: TAMARACK TECHNOLOGIES INFINITY 1100CQ DUCTED WHOLE HOUSE FAN (.17
<br /> WATTS/CFM).
<br /> . � .. �� ��.o _ �
<br /> ���� �F � �����
<br /> ������IE� ��� ����I�
<br /> c0 2018,S+L Architects,LLC
<br />
|